Search Documents

Search Again

Search Again

Sort by

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • SME
    Chemicals

    By Robert B. Fulton

    The objective of this chapter is to discuss the interrelationship between industrial minerals and chemical manufacturing. It is intended to supplement rather than duplicate the commodity chapters. Par

    Jan 1, 1994

  • DFI
    Specialized Slurry Wall Equipment - The Hydromill - Summary

    By Mario Mauro

    The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l

    Jan 1, 1994

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • ISEE
    The High Explosives Industry in the United States: The First 20 Years - 18654 885

    By Robert B. Hopler

    The history of the first twenty years of the high explosives industry in the United States begins as an illustration of the free enterprise system at its best and ends with the industry virtually take

    Jan 1, 1994

  • SME
    "Market Leadership Through Excellence": Developing A Corporate Strategic Plan With Vision

    By T. Kontos

    Rogers Group, Inc., is the nation's largest privately held aggregates producer (primarily producing crushed limestone and secondarily sand & gravel) and a major regional asphalt paving constructi

    Jan 1, 1994

  • SME-ICGCM
    Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine Development

    By Kot F. Unrug

    In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a

    Jan 1, 1994

  • TMS
    Simulation and Animation of a Copper Smelter

    A simulation of a capper concentrate smelter was built with a capacity of 450,000 tons per year. The system's components to simulate were three : a Reverbetory furnace, a Wiente ' s modified

    Jan 1, 1994

  • AUSIMM
    GIS Modelling of Mineral Prospectivity: New Technology and Old Data, Reefton Goldfield

    By J B. Taylor

    Geographic Information Systems (GIS) are being increasingly used by the mineral exploration industry in the search for new ore deposits. A mineral exploration GIS links geological and geophysical data

    Jan 1, 1994

  • AUSIMM
    Use of Remote Sensing Data to Aid Geological Mapping of the Waihi 1:50 000 Scale

    By R L. Brathwaite, S E. Belliss

    Linear and semi-circular features were mapped in the volcanic terrain of the southernCoromandel Peninsula, North Island, using JERS-1 synthetic aperture radar (SAR), Landsat-4 Thematic Mapper, and SPO

    Jan 1, 1994

  • AUSIMM
    New Zealand Coal Qualities - How Do They Rate in World Markets?

    By T DePetris, B B. Beamish

    There has been a gradual increase in the volume of internationally traded thermal and coking coal, with emphasis on blending of coals rather than single coal usage. New Zealand can take advantage of t

    Jan 1, 1994

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • SME-ICGCM
    Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars

    By J. Brasfield

    Jim Walter Resources, along with the Rock Mechanics Branch of British Coal and Strata Control Technology Pty. Ltd., is presently studying the yield-stable-yield pillar design in use at the Blue Creek

    Jan 1, 1994

  • ISEE
    The Importance and Advantages of Accurate Calculation, Evaluation and Control of Dragline Methodologies

    By K B. Holm

    This paper deals with the advances made at Syferfontein Colliery in the calculation and control of dragline methodology. The high capital outlay and operating cost of a dragline necessitates strict co

    Jan 1, 1994

  • ISEE
    Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators

    By Michael S. Wieland

    Charge malfunction problems result from rather universal damage mechanisms and are widespread throughout surface and underground delay blasting. Recent refinements in instrumentation technology reveal

    Jan 1, 1994

  • SME
    Futuristic Look at Process Control in the Minerals Industry

    By Lynn B. Hales

    There is a large economic opportunity associated with improving metallurgical performance in mineral processing plants that use process control. Thus, future control systems will be developed towards

    Jan 1, 1994

  • SME
    Downsizing Maintenance to Improve Performance: Defining the Downsizing Task

    By Paul D. Tomlingson

    Editor's note: This is the first of two articles on maintenance. Part two, "Effective maintenance downsizing techniques," will appear in the October issue of MINING ENGINEERING. Most mine mana

    Jan 1, 1994

  • SME
    Benefits of a Good Quality Assurance Program to an Electric Utility

    By W. J. Mahoney

    A good quality assurance program at a coal mine or power plant is accurate, timely and consistent. The quality analysis is accurate due to a complete sampling of the coal stream loaded into the unit t

    Jan 1, 1994

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994