Search Documents

Search Again

Search Again

Sort by

  • SME
    Geological Parameters Affecting Open Hard-Rock Tunnel Boring Machine Performance

    By Taehong Kim

    An accurate and reliable prediction of Tunnel Boring Machine (TBM) performances, in terms of Rate of Penetration (ROP), utilization (U), and cutter wear rate, is a critical element in the successful p

    Jan 1, 2008

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SAIMM
    Characterization And Batch Testing Of A Secondary Lead Slag

    By A. E. Lewis

    The emphasis of this paper is on the characterization and testing of the slag produced by a secondary lead refinery. This work forms part of a broader investigation aimed at reducing loss of valuable

    Jan 1, 2000

  • SAIMM
    Considerations Of Failure Mechanisms Associated With Rock Slope Instability And Consequences For Stability Analysis

    The results of a series of physical model studies of the stability of jointed rock slopes carried out some years ago are described. These models were tested under centrifugal loading. Four ?geological

    Jan 1, 2006

  • AUSIMM
    Reflections on Gold Occurence at Bendigo

    Cessation of mining on the Bendigo goldfield makes it evident that, as the older generation fades away, knowledge of the famous Bendigo saddle reefs will be limited in the future by their written reco

    Jan 1, 1961

  • SAIMM
    Mine Haul Road Maintenance Management Systems

    In surface mining operations, ultra-heavy trucks operate on haul road networks which are typically from 10?40 km in length. These road networks are often not optimally designed and maintained and as a

    Jan 1, 2003

  • SAIMM
    Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? Synopsis

    By G. I. McPhail

    The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t

    Jan 1, 2012

  • DFI
    Challenges And Uncertainties Relating To Open Caissons

    By Fathi Abdrabbo

    Open caissons are used for many geotechnical engineering applications. Open caissons may be used as deep foundation elements bypassing weak soils to tip in firm deeper strata, and in rivers and mariti

    Jan 1, 2012

  • AUSIMM
    The Distribution of an Insoluble Flotation Collector on Fine Coal Particles

    By Firth B. A

    The flotation of fine coal (minus 0.5 mm) often requires the addition of an insoluble hydrocarbon collector to apparently promote the adhesion of coal particles to air bubbles. A series of experiments

    Jan 1, 1982

  • SME-ICGCM
    Characteristics of Seismic Field Generated by Bed Separation and Application Seismic Technique for Exploration of Bed Separation and Grouting Research

    By Jiulong Cheng

    Underground coal mining causes overburden deformation and failure, one major form of which is bed separation in the overburden. Surface subsidence can be controlled by injecting grout into the bed sep

    Jan 1, 2006

  • AUSIMM
    Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3D

    One of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh

    Nov 25, 2010

  • DFI
    8000 Series Piling Rig

    By Roger A. Bullivant

    The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar

    Jan 1, 1995

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • AUSIMM
    Comparing Drilling Patterns for Coal Reserve Assessment

    The criterion for assessing the accuracy of coal reserve estimates proposed by Philip and Watson (1982) is criticized.Following Royle (1977), it is suggested that the global estimation variance found

    Jan 1, 1983

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • SME
    The positive pressure chamber

    By J. P. Brady

    A major spontaneous combustion incident occurred in the sealed goaf of the SL3 Panel; Southland Colliery in 2003 resulting in the loss of a longwall and sealing of the mine. The most important issue f

    Jan 1, 2009

  • CIM
    Save Time and Money in Industrial Mineral Plant Start-ups

    By Michael G. Rulff, Tracy M. Holmes

    "Vast amounts of time and money are spent fighting flow problems in plants that involve the handling or processing of industrial minerals. Because these types of projects tend to be capitalintensive,

    Jan 1, 2008

  • SAIMM
    Equilibrium Interactions Between Freeze Lining And Slag In Ilmenite Smelting

    In ilmenite smelting, the FeO content of the feed material (nominally FeO.TiO2) is decreased by reduction with carbon. In a parallel reaction, a significant amount of the TiO2 is reduced toTi2O3. One

    Jan 1, 2004

  • NIOSH
    Multiple Seam Longwall Mining In The U.S.—Lessons For Ground Control

    Relatively few longwall mines in the U.S. operate under multiple seam conditions where the two seams are less than 200 ft apart. This paper describes the experience of six that do. These operations

  • AUSIMM
    Processing of Hard-to-Treat Copper Ore and Flotation Middlings Using Chemical Treatment

    Processing of Hard-to-Treat Copper Ore and Flotation Middlings Using Chemical Treatment

    Sep 13, 2010