  • SAIMM
    Cracking A Hard Nut: An Overview Of Lonmin?s Operations Directed At Smelting Of UG2-Rich Concentrate Blends - Synopsis

    Lonmin, earlier than any other primary platinum producer, had to deal with the concentrating and smelting of UG2-rich ores and concentrates respectively. Smelting was performed at a fairly modest scal

    Jan 1, 2011

  • ISEE
    Blasting Effects on Pore Pressure in Coal Impoundments (Dry Conditions - Part I)

    By Joshua Micah Hoffman, Jhon Silva-Castro, Kylie Larson-Robl

    A coal mine impoundment failure has the potential to be environmentally devastating and life-threatening. It is well documented that after seismic events slope failures in impoundments can occur. It h

    Jan 1, 2015

  • SAIMM
    Measuring The Impact Of HIV And STIs In A Community In A Coal Mining Town, Mpumalanga, South Africa

    By H. Hurkchand

    Background: A cross-sectional study was conducted in November2001 to establish the prevalence rates of Human Immunodeficiency Virus (HIV) and sexually transmitted infections (STIs) (Chlamydia trachoma

    Jan 1, 2005

  • AUSIMM
    The Golden Cross Mine Underground Development Experience and Practice

    The Golden Cross Mine will be the first underground gold mine in New Zealand to operate since 1952. The development plans, along with the conditions and circumstances presently found in the now ongoin

    Jan 1, 1991

  • SME
    Thermodynamic Constraints On Arsenic And Heavy Metals Removal From Water With Limestone-Based Material

    By A. D. Davis

    Limestone-based material is effective for reducing arsenic concentrations below the current limit of 10 parts per billion for drinking water, typically resulting in final concentrations of about 4 to

    Feb 27, 2013

  • SAIMM
    ISACONVERT - Continuous Converting Of Nickel/PGM Mattes - Synopsis

    By M. L. Bakker

    The ISASMELT? top submerged lance (TSL) bath smelting process was developed in Mount Isa, Australia by Mount Isa Mines Limited (now a subsidiary of Xstrata plc) during the 1980s. By the end of 2011, t

    Jan 1, 2011

  • ISEE
    Molikpaq Blast Densification Project Sakhalin Island, Russia

    By Dave Otto, Ron Elliot, Ed Hatch

    This paper is a summary of the work carried out by an international team of specialists in the successful explosive compaction of the sand fill core of the Molikpaq offshore oil production structure.

    Jan 1, 2000

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • CIM
    Strategies for Mining in the Vicinity of the Creighton Fault at Vale?s Copper Cliff Mine

    By Mehdi Razavi

    Scope of the Study The possibility and risk associated with mining two stopes at the same time The influence of Creighton Fault on the stability and dilution The effect of irregular shape of stope

    Oct 1, 2010

  • SAIMM
    The Behaviour Of Coke In Submerged Arc Furnace Smelting Of Ferromanganese

    By S. Kamalpour

    It has been observed that the productivity of ferromanganese furnaces, and the stability of metal and slag compositions, vary considerably according to the type of coke used as reductant. However, the

    Jan 1, 2004

  • AUSIMM
    Advances in Copper Anode Reverberatory Furnace Practice

    At Copper Refineries Pty. Ltd., Townsville, two reverberatory furnaces of 420 tonnes capacity are used to melt 210000 tonnes/year of copper for subsequent anode casting. When the refinery commenced pr

    Jan 1, 1977

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • CIM
    Electrical Model of an Electrowinning Circuit Including Stray Current through Electrolyte Piping

    By S. C. Richardson

    The electrowinning (EW) circuit involves using DC current in the electro-deposition of metal ions dissolved in an electrolyte solution. This paper reviews a method to generate an electrical model of a

    Jan 1, 2019

  • SAIMM
    Risks Associated With Rockpasses In Deep-Level Tabular Mines Based On Historical Pass Performance

    By W. C. Joughin

    Problems with the stability and performance of rockpasses in deep-level mines are common. This paper presents the results of an investigation into the recorded performance of rockpasses in deep-level

    Jan 1, 2005

  • SAIMM
    The Effect Of The Proposed Royalty Billon Mineral Property Values - Introduction

    By E. V. Lilford

    The South African Minerals Development Act (?the Act?) has been promulgated and will come into full force and effect once it is gazetted. Thereafter, all Old Order mineral rights will have to be conve

    Jan 1, 2003

  • DFI
    American Developments In The Use Of Small Diameter Inserts As Piles And Insitu Reinforcement

    By D. A. Bruce

    The use of small diameter cast-in-place bored piles is becoming increasingly popular in the United States. Such inserts are used as conventional load bearing piles, and are generally referred to as pi

    Jan 1, 1989

  • TMS
    Tensile Properties of Epoxy Composites Reinforced with Continuous Curaua Fibers

    By Felipe Perissé Duarte Lopes

    The tensile properties of DGEBA/TETA epoxy matrix composites reinforced with different amounts of curaua fibers were evaluated. Tensile specimens with up to 35% in volume of long, continuous and align

    Jan 1, 2010

  • METSOC
    Piloting Regenerative SO2 Scrubbing At Xstrata Nickel

    By D. G. Tisdale

    A pilot plant was installed and operated at the Xstrata Nickel Sudbury Smelter 10 demonstrate the CANSOLV SO2 Scrubbing System. A 350 m3/h slipstream (through a 10cm pipe) was drawn from two different

    Jan 1, 2009

  • CIM
    Paste Fill Design at the Louvicourt Mine

    By Pierre Lacombe

    "The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be

    Jan 1, 1995

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008