Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 3505 Relationship Of Ash-Fusion Temperatures Of Coal And Coke ? Introduction (6f500829-9d2d-49ca-b0c0-4315af1a4067)
By D. A. Reynolds
A few studies on the relationship of the fusion temperature of the ash on coke to that of the corresponding coal have been made on commercial high-temperature cokes. H. J. Rose3/ in 1921 compared the
Jan 1, 1940
-
MLA 104-83 - Mineral Investigation Of The Slate Range Wilderness Study Area (BLM No. CDCA-142), Inyo County, California ? Summary Statement
By Michael Sokaski
The Cliff Springs prospect in the northern part of the Slate Range Wilderness Study Area (WSA) contains only minor amounts of gold and silver. Clay near this prospect contains insufficient aluminum to
Jan 1, 1983
-
Siemens Controllers Aid Processing at the Madero Project
By Rolando Gonzalez
Mexico’s role in the world economic community continues to grow. And it is important that the country makes use of its natural wealth, including its large underground deposits of minerals and metals.
Jan 1, 2003
-
Three-dimensional FEM analysis to sale field measurements from deep mine accessways
By M. J. Beus
A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair
Jan 1, 1989
-
Continuous Improvement - How Changes in Metallurgy can have a Substantive Impact on Environmental Impact and Closure - Lessons Learnt from Environmental Auditing
By G McMillan, P Mulvey
"Geochemical characterisation is done based upon the geology and metallurgical batch testing prior to commencement of the operation of the plant. Tailings repository design is based upon geochem
Jul 15, 2013
-
The Development and Commissioning of Ontario’s First Diamond Mine – The Victor Diamond Mine
By Ian Holl, Adam Hempstock, Rickardo Welyhorsky, Niel Morrison
"The Victor Diamond Mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario and was completed appr
Jan 1, 2010
-
Iron and Steel Division - Kinetic and Equilibrium Considerations for Silicon Reaction between Silicate Melts and Graphite-Saturated Iron, Part I: Reaction Equilibria
By E. T. Turkdogan, P. Grieveson, J. F. Beisler
Jan 1, 1963
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits
By Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992
-
Processing Plant Expansion at Kittila Mine Affords Opportunity for Significant Material Handling Improvement
By T. Holmes, J. Middlemiss
"Agnico-Eagle (AE) has been operating their Kittila Mine in Northern Finland since 2008. The mine has experienced considerable ore flow problems with ratholing, bridging and freezing in their mill fee
Jan 1, 2017
-
An Applications Approach To Barrier Pillar Design For Improved Resource Recovery
By John R. Koehler
Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu
Jan 1, 1989
-
OFR-54-74 Effectiveness Of Respirable Dust Control By Water Through The Drum On An 11 Cm Joy Continuous Miner
By Gerald P. Scanlan
Control of the dust produced by continuous mining machines in coal mines is generally obtained by water sprays from fixed nozzles mounted on the frame of the machine in back of the cutting head. Mount
Jan 1, 1974
-
Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004
By Lewis Dr. Wade
It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO
Jan 1, 2005
-
OFR-83-84 Preparation Of Baseline Training Materials For Assisting Compliance And Accident Reduction In The Metal And Nonmetal Mining Industry
By J. H. Adkins
The goal of this program was to produce a set of baseline health and safety training materials that could be used by the metal/nonmetal mining industry to reduce injuries and to comply with federal tr
Jan 1, 1983
-
RI 6217 Examination Of An Experimental Iron Blast Furnace After Quenching With Nitrogen
By J. P. Morris
An experimental blast furnace in normal operation was quenched by substituting cold nitrogen for the hot blast air. More than 2,200 samples from the stack, bosh, and hearth were taken; 500 of these we
Jan 1, 1963
-
MLA 41-82 - Mineral Resources Of The Hells Canyon Study Area Adams, Idaho, And Nez Perce Counties, Idaho And Wallowa County, Oregon ? Summary Statement
By Terry J. Close
A mineral resource survey of the 940-square-mile (2,434 km2) Hells Canyon study area, which includes Hells Canyon Wilderness, Snake and Rapid Wild and Scenic River's, and adjoining roadless lands
Jan 1, 1982
-
IC 6864 Accidents In Tennessee Coal Mines 1932-34
By Frank E. Cash
The work of the United States Bureau of, Mines is concerned primarily with the prevention of accidents in the mining, petroleum, and allied industries. This report analyzes the fatal accidents in the
Jan 1, 1935
-
MLA 13-86 - Mineral Resources Of The Pahute Peak Wilderness Study Area, Humboldt County, Nevada
By Jerry E. Olson
In 1984, the U.S. Bureau of Mines conducted a mineral survey of the Pahute Peak Wilderness Study Area (WSA) (NV-020-621), which covers 57,529 acres in Humboldt County, NV. About 90 percent of the WSA
Jan 1, 1986
-
OFR-84(10)-76 ?A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining" - Volume X - Ventilation Subsystem
By R. V. Ramani
This report is volume 10 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mo
Jan 1, 1975
-
IC 8062 Petroleum Refineries, Including Cracking Plants, In The United States, January 1, 1961 - Summary - Crude-Oil Capacity
By C. E. Hennig
On January 1, 1961 there were 311 petroleum refineries in the United States with a total crude-oil throughput capacity of slightly more than 10 million barrels per day, according to the Bureau of Mine
Jan 1, 1961
-
Pile Load Test Results For Highway 280 Pile Uplift Test Site
By Douglas Brittsan
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar
Jan 1, 1993