Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Role of Environmental Ore Deposit Models in Resources Development
By Y T. J Kwong
With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource
Aug 22, 2011
-
In-Pit Crushing and Conveying Bench Operations
By T Atchison
In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v
Jul 11, 2011
-
New Slurry Sampling Systems for Mineral Processing Plants
By J Weir
Accurate sampling of slurry streams is extremely important for metallurgical accounting in mining operations, not only for measuring the ore grade from the mine, but also for measuring the recovery of
Jan 1, 2002
-
Potential TWA changes for gas monitoring instruments are alarming
By P Aspinall
Safe work Australia (SWA) has a number of proposed amendments to existing Workplace Exposure Standard (WES) values that may dramatically change how mining workplaces using personal gas monitoring inst
Apr 16, 2024
-
Dressing of Carbonates by Decrepitation
By Stevak D, Plesingerova B, Ellias K, Tkacova K
This paper presents information on the processing of minerals by decrepitation that can be an integral part of their mineral dressing. In the case of carbonates, processing by decrepitation is a spe
Jan 1, 1993
-
A New Approach to Metallurgical Accounting
By S Brochot, M-V Durance
In many cases, current metallurgical accounting practice does not consider the errors associated with the measurements used in obtaining the metal balance. Considering all measurement errors, includin
Oct 29, 2012
-
The Outokumpu Lead Flash Smelting Process
By Sulanto J, Talonen T
In the mid 1960's Outokumpu considered building a lead Flash Smelter on the basis of Flash Smelting technology developed first in the late 1940s for smelting copper concentrates. Pilot scale t
Jan 1, 1984
-
Process Control Developments in the Potlines
A large scale distributed process con-trol system has been successfully applied to the automatic control of aluminium reduction cells at Boyne Smelters. A three stage hierarchy of minicomputers and mi
Jan 1, 1985
-
Strategy and Tactics Implemented to Achieve Energy-efficient Ventilation and Cooling of Mines
By J J. L du Plessis
Escalating energy and electricity costs have become one of the biggest expenditure drivers in mining operations. During the last eight years, energy costs have trebled when expressed as a percentage o
Aug 31, 2015
-
Optical and SEM-Based Microscopy Integration for Optimisation of Geometallurgical Modelling and Ore Deposit Characterisation
By R Hartner
Digital optical microscopy (DOM) and automated SEM-based (ASEM) mineralogy systems (MLA, QEMSCAN) have experienced significant developments within the last decade. However these developments have been
Sep 5, 2011
-
Fluid Bed Roasting at Mount ISA
By Casley G. E, Pritchard J
A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15
Jan 1, 1974
-
Upgrading and Removing Phosphorus from Low-Grade and High Phosphorus Containing Iron Ores
Upgrading and Removing Phosphorus from Low-Grade and High Phosphorus Containing Iron Ores
Sep 13, 2010
-
Coarse Gold Separation at Bendigo
Bendigo Mining operates a 600 000 t/a comminution, gravity, flotation and leaching processing plant for the recovery of gold from their Kangaroo Flat Operation, in the Bendigo goldfields. The free gol
Aug 1, 2010
-
The Argyle Process Plant Control System
By Weber D, Knox PR
The criteria developed for the Argyle Diamond Mine process plant control system are reviewed. The control system installed is described along with a discussion of the method of implementation adop
Jan 1, 1986
-
Mining What's in it for New Zealand?
By B M. H Sharp, R P. Hide, S P. Devine
Uncertainty and debate currently pervade the mining industry in New Zealand. The operational uncertainties, whether external (eg gold prices, the exchange rate), or internal (eg coal expansion difficu
Jan 1, 1985
-
Improvements in Process Control and Instrumentation at Batu Hijau
By B Dunstan, F Wirfiyata
PT Newmont Nusa Tenggara (PTNNT) operates the Batu Hijau copper and gold mine and process plant on the island of Sumbawa, Nusa Tenggara (Barat) NTB, Indonesia. The plant consists of a nominal ca
Jan 1, 2009
-
Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training
By P Oikkonen
Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and
Mar 29, 2023
-
Community Consultation In The Rehabilitation Process
The paper looks at those factors which led the Latrobe Valley Community Forum to .focus on shortcomings of the consultative process. that existed around the 1980 period, and the limitations on the abi
Jan 1, 1992
-
Pike River Coal - Modern Mine Design
The Pike River Coal Company is set to develop the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the Brunner S
Jan 1, 2005
-
Performance Enhancing Blends – Concentrator Feed Blending at Iron Magnet
By M Darvall
Magnetite ore blending has yielded signifi cant performance improvements in OneSteel’s magnetite concentrator. The magnetite concentrator beneficiates magnetite ore from the Iron Magnet Deposit and pr
Jul 11, 2011