Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Multicomponent modelling and simulation of the Minas Rio iron ore grinding circuit
By T M. Campos, J Silva, L M. Tavares, J Lichter, L P. Alves, B K. N Rocha, H D. G Turrer
The depletion of the richest ore deposits and the increase in number of mining projects involving deposits with complex mineralogy, higher competence and lower grade has led to an eminent need for imp
Aug 24, 2022
-
Description of the Roasting of Sulphide Ore by the Huntington-Heberlein Process
By W J
Al ores arriving at the works which contain more than 3% sulphur, together with all sands and other fine residues, are delivered to the roasting department. Those that are in a coarse condition are fi
Jan 1, 1918
-
Current Trends and Implications of Environmental Regulation of Mining in the Northern Territory
By L. Gilbert
Recent changes to environmental legislation and trends in the environmental regulation of mining in the Northern Territory are being driven by (among other factors) Federal Government policies and
Jan 1, 1994
-
The Yabulu Nickel Refinery Transition from Greenvale Ore to Imported Ore
By J G Reid
In the period since 1989 the Yabulu Nickel Refinery of Queensland Nickel has undergone a transformation both in terms of the nickel laterite ore feed and the refined nickel product. These two change
Jan 1, 1994
-
Hellyer tailings – complex mineralogy but higher grade than many ore bodies
By M Barden, G Lane, B Quilliam
NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing
Nov 21, 2018
-
Research on supporting technology for production level roadways of block caving in Pulang Copper Mine
By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu
Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the
Nov 30, 2018
-
Buzwagi Open Pit Study
By M Sebbag, T Taimre
Barrick Gold Corporation is proceeding with development of the Buzwagi Mine in the Lake Victoria Greenstone Belt District of Tanzania. The Buzwagi orebody occurs in the Nzega Shear zone within the Gre
Jan 1, 2007
-
Relocating Waihi's Cornish Pumphouse
WaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant
Jan 1, 2006
-
A New Dry Processing Approach to Alluvial Deposits
By G R Ryan
Dissatisfied with conventional wet processing methods for alluvial deposits, Resource Trend Pty Ltd of Cairns set out to develop a better process. After comprehensive investigation of existing dry t
Jan 1, 1994
-
Process Options Using Solvent Extraction for the Processing of Laterites
The treatment of nickel ores and concentrates and the subsequent processing to recover separate products of nickel and cobalt is one of the major interests at present in the mining industry. The inc
Jan 1, 1996
-
Reduction of the Blast Exclusion Zone at the Black Star Open Cut Mine
By J Moncrieff, P Bellairs
The Black Star Open Cut is located immediately adjacent to the township of Mt Isa and is situated in the middle of extensive pre-existing infrastructure including two concentrators, two smelters, a we
Jan 1, 2007
-
Interpretation of Field Stresses and Deformation Moduli from Extensometer Measurements in Rock Tunnels
By Redman P. G, McMahon B. K
A simple technique for evaluating the field stress ratio is presented, based on the results of extensometer or convergence tape measure- ments taken in an advancing tunnel. This tech- nique also yie
Jan 1, 1981
-
Using Borehole Radar to Refine Orebody Interpretations in a Narrow Vein Gold Deposit
By G Morgan, C Kemp
In December 2010, a trial of borehole radar technology was conducted to test the usefulness of the technique in better refining the position and geometry of narrow vein orebodies away from the primary
Mar 26, 2012
-
Recent Developments in Assessing Rock Cuttability and Boreability
Two significant TBM boreability predic- tion models are outlined. Predicted advance rates are compared with actual advance rates taken from twenty case histories. The results show that a simple low
Jan 1, 1987
-
Turning Good Research into an Operator Friendly Commercial Reality
The primary objective of designing, constructing, commissioning and operating a technically and economically viable processing plant cannot be achieved without a rigorous scientific understanding of t
Jan 1, 2000
-
Enigmatic Kinematics Resolved in the Taurus Shear Zone,Golden Pig Gold Mine, Southern Cross, Western Australia ù Resource Implications
By S Robson, T G. Blenkinsop, S C. Dominy
Golden Pig mine is in the central part of the Southern Cross greenstone belt within the Archaean Yilgarn craton. The mine has produced approximately 2.5 Mt of ore at 5.7 g/t Au to yield approximately
Jan 1, 2003
-
Magnesium Sulfate Production ù First Value Added Salt From Saline Waters of the Murray Basin (Australia)
By T Barto, D Thomson, T Norgate, C Doblin
Collaboration between CSIRO Minerals and SunSalt Pty Ltd, a salt producing company located in rural Victoria, has resulted in a commercial process to recover magnesium sulfate (commonly called Epsom s
Jan 1, 2004
-
Understanding Trends in Performance of Open Cut Mining Equipment
By G Lumley
PlannersÆ optimism (or maybe commercial necessity) means that most mine plans use equipment rates that are rarely achieved (Lumley and Beckman, 2009). This lack of understanding of what equipment actu
May 24, 2012
-
Effects of pulp chemistry on plant and laboratory flotation modelling
By A L. Randriamanjatosoa, G Small, C Greet
In flotation simulation models, the effects of pulp chemistry other than pH are often ignored and reduced to particles hydrophobicity or contact angle, neither of which can be measured readily in real
Aug 29, 2018
-
Recovery Improvement Project for the Ridgeway Concentrator at Newcrest's Cadia Valley Operations
By F Cesnik
The past few years has seen a concerted effort to improve the recovery of gold along with its co-product copper from the æhigh-gradeÆ Ridgeway concentrator at Newcrest Mining LtdÆs Cadia Valley Operat
Jan 1, 2007