Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Twenty-five Years of Mine Filling: Developments and Directions

    The sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part to

    Jan 1, 1998

  • AUSIMM
    Long-Term Erosional Stability of Mine Spoils

    By Riley S

    Many regulatory bodies have, or are considering, guidelines that require rehabilitated mine spoils to be erosionally stable (satisfying quantitative limits) over specified design lifetimes. One of

    Jan 1, 1994

  • AUSIMM
    Development of Newmont's Minahasa Gold Mine in Indonesia

    The green field discovery of a two million ounce high-grade refractory gold ore deposit in the Indonesian Province of Sulawesi Utara, led Newmont to utilise its proven technical expertise in dry grind

    Jan 1, 1997

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Exploration of the Horn Island Gold Deposit, Torres Strait

    The Horn Island gold and mineral field produced 194 kilograms of gold in the 4 years subsequent to its discovery in 1894, from an area of shallow workings 1.5 kilometres x 0.5 kilometres. Gold deposit

    Jan 1, 1986

  • AUSIMM
    Implementation on stability of rock slope in abandoned quarry wall – Singapore case study

    By H A. Linn, K Winn, C W. Lee

    The Q-slope method for rock slope engineering was developed to enable engineering geologists and rock engineers to rapidly assess the stability of excavated rock slopes in the field and make optimal a

    Nov 29, 2022

  • AUSIMM
    Computerised Deposit Modelling, Volumetrics, and Production Scheduling

    By Davey CJ

    An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative

    Jan 1, 1983

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    Technical Note on an Improved Cyclosizing Technique

    The design and operating characteristics of the hydraulic cyclone elutriator were described in detail by Kelsall and McAdam (1963), and the method of operation of the commercially available version, t

    Jan 1, 1974

  • AUSIMM
    Comparison of two and three‐dimensional seepage analysis in tailings dams – a case study

    By N Yarahmadi

    Characterization of pore pressure is critical for appropriate design of tailings dams. Furthermore, if seepage rates through tailing embankments increase unexpectedly or become uncontrolled, undesirab

    Jul 1, 2021

  • AUSIMM
    A Case History of the Crusher Level Development at Henderson

    By W D. Rech, K W. Keskimaki

    As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was

    Jan 1, 2000

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Industry-Government Collaboration - Are We Doing Enough to Support Each Other and Promote Our Industry?

    Ladies and gentlemen, distinguished guests and fellow members of The AusIMM, good morning.   Thank you for the opportunity to address you all today, Crown Minerals are very pleased to be associat

    Jan 1, 2007

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998

  • AUSIMM
    Quantitative X-Ray Mineralogy of Iron Ore and Scales

    By K Knorr

    Desktop X-ray powder diffraction using a D2 PHASER equipped with fast linear detector was performed on several iron ore and mill scale samples. Data were analysed using cluster analysis and Rietveld q

    Jul 11, 2011

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    Acid Rock Drainage Treatment Technologies ù Identifying Appropriate Solutions

    By N Murphy and, S Santomartino, M Cramer

    Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at

    Jan 1, 2003

  • AUSIMM
    Planning of Open Cut Mining

    The increased cost of imported oil fuels, coupled with our understandable reluctance to commit ourselves to the use of nuclear energy, has resulted in a renewed reliance on coal as a primary source of

    Jan 1, 1976

  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    Laboratory Studies in Comminution: Part IV Effect of Feed Sizing on the Grinding of a Tin Ore

    By K B. Quast

    Changes in feed size distribution can have significant effects in rod mill grinding. The product sizing resulting from wet batch milling of a tin ore showed little influence on fines production after

    Jan 1, 1998