Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing
By Rolf Katzenbach
Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we
Jan 1, 2007
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study
By James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Drilled Shaft Foundations For The KcICON Missouri River Bridge
By Paul J. Axtell
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M
Jan 1, 2009
-
Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits
By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto
"Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained
Jan 1, 2014
-
Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station
By Allan Sylvester
This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant
Jan 1, 2002
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY
By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Design Of Bearing Plates For Anchors In Geo-Application
By Andrew Baxter
This paper focuses on the design of steel bearing plates to transfer load from tiebacks and tiedowns to a concrete mass. It lists and describes the various available procedures for design of bearing p
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NY
By M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Lateral Load Response Of Two Identical Bridge Column-Foundation Systems In Warm And Cold Conditions
By Muhannad T. Suleiman
Temperatures below freezing significantly enhance the soil shear strength and stiffness and to a lesser extent increase the compressive strength of concrete as well as the yield and ultimate strength
Jan 1, 2006
-
Residual Load Development Case Study In Driven Cast-In-Situ Piles
By Packer M. L
Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to
May 1, 2022
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability
By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils
By Luo Yang
It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid
Jan 1, 2006
-
Deep Caisson Foundations In China ? Synopsis
By C. Y. Liu
This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca
Jan 1, 2010
-
Geospatial Project Information Management System At Herbert Hoover Dike
By Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of
-
Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill Ground
By Shaw-Shong Liew
This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.
Jan 1, 2006
-
St. Louis Service Base Floating Wharf Mooring System Replacement
By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
Pile Integrity Testing In The Netherlands
By Peter Middendorp
Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int
Jan 1, 2006
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication
By Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Cofferdam Failures ? Introduction
By Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987
-
An Innovative Approach To Load Testing Of High Capacity Piles
By P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989