    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • DFI
    High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study

    By James Weaver

    During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari

    Jan 1, 2011

  • DFI
    Drilled Shaft Foundations For The KcICON Missouri River Bridge

    By Paul J. Axtell

    The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M

    Jan 1, 2009

  • DFI
    Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits

    By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto

    "Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained

    Jan 1, 2014

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Design Of Bearing Plates For Anchors In Geo-Application

    By Andrew Baxter

    This paper focuses on the design of steel bearing plates to transfer load from tiebacks and tiedowns to a concrete mass. It lists and describes the various available procedures for design of bearing p

  • DFI
    Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NY

    By M. D. Riegel, Brian T. Felber

    "Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high

    Jan 1, 2016

  • DFI
    Lateral Load Response Of Two Identical Bridge Column-Foundation Systems In Warm And Cold Conditions

    By Muhannad T. Suleiman

    Temperatures below freezing significantly enhance the soil shear strength and stiffness and to a lesser extent increase the compressive strength of concrete as well as the yield and ultimate strength

    Jan 1, 2006

  • DFI
    Residual Load Development Case Study In Driven Cast-In-Situ Piles

    By Packer M. L

    Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to

    May 1, 2022

  • DFI
    Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability

    By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp

    "The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th

    Jan 1, 2015

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • DFI
    Deep Caisson Foundations In China ? Synopsis

    By C. Y. Liu

    This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca

    Jan 1, 2010

  • DFI
    Geospatial Project Information Management System At Herbert Hoover Dike

    By Jamey Rosen

    A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of

  • DFI
    Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill Ground

    By Shaw-Shong Liew

    This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.

    Jan 1, 2006

  • DFI
    St. Louis Service Base Floating Wharf Mooring System Replacement

    By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh

    "The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the

    Jan 1, 2017

  • DFI
    Pile Integrity Testing In The Netherlands

    By Peter Middendorp

    Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int

    Jan 1, 2006

  • DFI
    United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication

    By Giovanni A. Bonita

    The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir

    Jan 1, 2006

  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    An Innovative Approach To Load Testing Of High Capacity Piles

    By P. Bermingham

    A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma

    Jan 1, 1989