Experiences From The Italian High Speed Rail Network AV Construction
By Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Micropile Foundation Retrofit Design For Richmond-San Rafael Bridge, Richmond, California - Introduction
By Patrick E. Durnal
The Richmond-San Rafael Bridge was built in the early 50s' and was first opened to traffic on August 31, 1956. Among California's longest steel bridges, it spans more than 21,000 feet across
Jan 1, 1998
-
Eglinton Crosstown, a New Step in Toronto’s Subway System
By Lars Richter, Franz-Werner Gerressen
"The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation
Jan 1, 2017
-
Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station
By Antonio Marinucci, Robin Mao
The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - Synopsis
By S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Plastic Piling
By Magued G. Iskander
The deterioration of concrete, steel, and timber is a serious hindrance to construction in marine and corrosive environments. Composite materials such as fiber-reinforced polymers (FRP) can offer perf
Jan 1, 2002
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis
By Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay
By Susheel R. Kolwalkar
A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred
Jan 1, 2008
-
-
Instrumentation Of Construction Vibrations
By Mark R. Svinkin
Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c
Jan 1, 2002
-
Load Testing Of Deep Foundations Using The Osterberg Load Cell
By David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
Deep Foundations on Buildings using Driven Ductile Iron Micropiles.
By Antonio A. Cristóvão, Alexandre Pinto
"Abstract Deep foundations of buildings using driven ductile iron micropiles TRIM solutions, leads to recognized advantages, from technical, schedule and economic points of view. High production rate
Jan 1, 2014
-
New Technologies For Quality Control Of Augered Cast-In-Place Piles
By Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
Deep Vibrocompactation By Stone Columns And Liquefaction Investigation
By P. Ventura
Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde
Jan 1, 1989
-
-
The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment
By James E. Parkes
The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station
Jan 1, 2011
-
Plastoelastic Analysis Of Bearing Capacity For Soil Anchor
By Hui Yongning
This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla
Jan 1, 1991
-
Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental Results
By Walter I. Paniagua
Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a
Jan 1, 2007
-
Tapertube ™ Piles
By Alexander Filotti, Stanley Merjan
"Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge
Jan 1, 2014
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin
By Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007