Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cap Precision in Perimiter Control Blasting and the Potential Application of Electronic Detonator
By Derek T. Novotny
Blasting cap precision is of major importance to advanced blast design. New technologies have introduced the use of microchips within detonator casings in the hope that the electronic control of the t
Jan 1, 1998
-
Economic Comparison of ANFO Versus Emulsion in Quarry Drilling and Blasting
By James H. Owen
Because of price structure, ANFO is normally considered to be the most cost effective explosive used in quarry blasting. Results indicate that bulk smulsion can be more cost effective in applications
Jan 1, 1998
-
Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography Systems
By Laura Bustemante, Bruce Vandenberg, Fred Huettig
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can
Jan 1, 1998
-
Community Response To Airblast And Vibration From Surface Charges
By L. Wilson, M. Kotzel, T. Pienaar
An empirical equation is presented for the maximum airblast from unconfined charges. This has been tested at a number of sites and with charges ranging from 0.1kg to 311kg. The equation is developed t
Jan 1, 2011
-
Blasting Program Optimization with Emphasis on the Control of Blast Vibration and Airblast
By Frank Sames
Most Blasting Programs are developed focussing on the environmental impact with respect to blast vibration and airblast. Compliance with existing regulations or policies limiting the immissions are ge
Jan 1, 2000
-
AEL Ring 2000
While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p
Jan 1, 2000
-
Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation
By Dale Preece
A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would
Jan 1, 2006
-
Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion Drilling
By Gary Cavanough, Stuart Addinell, Hector Parra
Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an
Jan 1, 2013
-
Lothological Recognition Based on Monitored Drilling Performance Parameters
By Jonathan Peck, Doug Pollitt, Malcolm Scoble
Over the past 5 years the Department of Mining and Metallurgical Engineering, McGill University, has been involved in the performance monitoring of both percussive and rotary drills. Studies conducted
Jan 1, 1991
-
"Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"
By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo
For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish
Jan 1, 2016
-
A Case Study of Near-Field Vibration Monitoring, Analysis, And Modeling
By Tamara Whitaker, James Gunderson, Ruilin Yang
This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit
Jan 1, 2008
-
Mitigating Loaded Blast Patterns Buried Beneath a High Wall Failure
By Aiden Carey, Jim Kennedy
During December 2007, Lake Cowal Gold Mine located in New South Wales, Australia experienced a significant pit wall failure. The wall failure resulted in the deposition of a large quantity of saprolit
Jan 1, 2011
-
Overburden Blast Cast Designs, Economics and Case Histories
By Conny Postupack
The first principle one usually learns about blasting is that competence in this field is best gained by experience in making blasts rather than by reading a book or by listening to a lecture. The rea
Jan 1, 1991
-
"Journal: 100 Years / MILITARY ENGINEERING (Part IV) Mining and Demolitions General Staff, Ware Office, 1910 London"
By Robert Hopler
209. Nitro-glycerine is produced by the action of nitric and sulphuric acids on glycerine, and is a heavy liquid of oily appearance, of specific gravity about 1•6, varying from colourless when quite p
Jan 1, 2011
-
Unmanned Aircraft Systems Use in Blasting Operations
By Lon Santis, Dale Ramsey
The use of aircraft to support blasting operations in mines, quarries and construction sites goes back to the early days of aviation. Invaluable at times, aircraft use has been limited by cost, the un
Jan 1, 2016
-
Blasting Overhangs Close to a Vibration Sensitive Structure
By R. Franfield
This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked
Jan 1, 2009
-
Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot
By Gabsoo Kim, Rulin Yang, Dave Kay
Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be
Jan 1, 2014
-
Experience with the change from cartridged to bulk site sensitized emulsion products.
By Peter Moser, G. Reihholf
Holcim, one of the world's leading suppliers of cement, aggregates and concrete, has set up a few years ago a working group “Quarry” in order to optimize the performance of its central European quarry
Jan 1, 2006
-
The Computerized Design Program for Tunnel Blasting
By Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim
In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model
Jan 1, 2005
-
Vibration Control Blasting for Low Stability Final Wall
By Greg Wyartt
In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl
Jan 1, 2018