Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Environmental Issues: Still Clouded in Uncertainty
By Michael Stanwood
Project feasibility no longer involves just technical and economic viability-today's feasibility study must include environmental, regulatory, and political considerations as well. While the US n
Jan 1, 1981
-
Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project
By J. Chae, D. Pecha, R. Andrews
The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro
Jan 1, 2005
-
Crushing & Grinding - Autogenous Mill Curved Pulp Dischargers - Experience At Pickands Mather Operations, Primary Milling Iron Ore
By A. M. McKim
6, 7.3 meter diameter autogenous mills at Wabush Mines are undergoing conversion from a radial configuration of pulp discharger to a curved design. Improved discharging efficiency has effectively lowe
Jan 1, 1982
-
Determination of the Fire Hazards of Mine Materials Using a Radiant Panel (ME Technical Papers)
By R. A. Thomas, C. D. Litton
"The objective of this study was to develop a laboratory-scale method to rank the ignition and fire hazards of commonly used underground mine materials and to eliminate the need for the expensive larg
Jan 1, 2015
-
Longwall-Induced Ground Movement at a Shale Gas Well Site Located in a District Barrier Pillar—FLAC3D Modeling Results and Interpretation
This paper evaluates the effect of longwall mining on a cluster of unconventional shale gas wells located in a district barrier pillar between a current longwall panel and the future panel north of th
Jan 7, 2020
-
Investigation of Alumina-Based Ceramic Production from Aluminum Black Dross "Mining, Metallurgy & Exploration (2021)"
By Umay Cinarli, Ahmet Turan
High-energy consumption in primary aluminum production (from bauxite ores) makes secondary aluminum production (from metallic raw materials such as scrap and dross) very critical. Aluminum dross, as a
Oct 26, 2020
-
Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs
By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo
The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.
Jan 1, 2005
-
Scaleup Of Hydrometallurgical Leach Recovery Processes ? Introduction
By R. D. Williams
Several hydrometallurgical leach processes have been recently proposed for the recovery of copper from copper concentrates. These include the Cymet Process of Cypress Metallurgical Processes Corporati
Jan 1, 1975
-
Comparing Simulated And Interpreted Geologic Models
By M. Rossi
Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft
Jan 1, 2004
-
Demonstration Of The Advanced Radio Imaging Method (Rim): Ground Truth Results For Three-Dimensional Imaging Of Coal Seams
By L. G. Stolarczyk, Y. Luo, S. S. Peng
Detection and assessment of severe geological anomalies ahead of a longwall face greatly benefits the mining operation. Electromagnetic-based Radio Imaging Method (RIM) is one of the most promising ge
Jan 1, 2004
-
Performance Monitoring Of Block Cave Mines Using Signal Processing And Waveform Analysis Of Gps Data
By D. Rutledge
Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active mi
Jan 1, 2008
-
Virtual Reality In Mine Training (3eb7dfa5-08f9-4834-9597-81542b7b8eb6)
By R. Unger, L. Mallett
The use of virtual reality (VR) technologies to train miners is an evolving area in research and development. In July 2006, representatives of 14 international organizations met to discuss current VR-
Jan 1, 2007
-
Evaluation of high-temperature disposable filter elements in an experimental underground mine - SME Transactions 2011
By L. D. Patts, S. J. Janisko, E. G. Cauda, A. D. Bugarski, G. H. Schnakenberg, J. A. Hummer
Filtration systems with disposable filter elements (DFEs) are used in the underground coal mining industry to control particulate matter emissions from diesel-powered permissible and nonpermissible co
Jan 1, 2011
-
This Is Where the Money Is! The Impact of Contract Front End Documents on Tunneling Projects
By James G. McKelvey
Owners have seen several major tunnel projects in recent years fall victim to a general reduction in the number of bidders as well as an erratic range of pricing. It should be noted though that this i
Jan 1, 2008
-
Design And Development Of The Northeast Layback Of The Betze-Post Open Pit
By Nick Rose, Robert Sharon, Mark Rantapaa
Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio
Jan 1, 2005
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand
By Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Safe Slot Hole Excavation With A New Boxhole Boring Machine - Introduction
By W. Burger
In underground mines worldwide, a large number of short and small diameter slot holes need to be excavated. Herrenknecht has developed and built a new boxholeboring machine based on the well-proven Mi
Jan 1, 2012
-
Ground Control Monitoring: A Comprehensive Guide for Mine Operators on Instrumentation and Data Acquisition Currently Used by the National Institute for Occupational Safety and Health (NIOSH) - SME Annual Meeting 2024
By Todd Minoski, Matthew McElhinney, Mark Mazzella, Morgan Sears, Craig Compton
The National Institute for Occupational Safety and Health (NIOSH) is staffed with Engineers, Geologists, and Field Technicians conducting a variety of ground control research. The mission of the groun
Feb 1, 2024
-
Mineral Processing - Design, Installation And Operation Of Pinto Valley Moly Flotation Columns
By R. Rodgers
The Pinto Valley concentrator of BHP Copper Inc. restarted its sulfide mining operations in September 2007 to produce copper and molybdenum concentrates. During the plant production ramp up, the coppe
Jan 1, 2010
-
A Review Of The Analysis Of Amphibole Fibers
By K. A. Allison, D. R. Van Orden, R. J. Lee
Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici
Jan 1, 2005