Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characteristics Of Philippine Porphyry Copper Deposits And Summary Of Current Production And Reserves ? History
By William E. Saegart
Copper has been mined in the Philippines since at least as early as the Ming dynasty (1368 A.D. to 1644 A. D.). The principal source areas of this early production were in Camarines Norte (Paracale),
Jan 1, 1976
-
East Central Interceptor Sewer, Los Angeles, California
By Ted Budd, Vladimir Goubanov
The East Central Interceptor Sewer, commonly known as the ECIS Project, is the largest public works construction project awarded by the City of Los Angeles. The complexity of this $240 million project
Jan 1, 2003
-
Evaluation Of Smoke And Gas Sensor Responses For Fires Of Common Mine Combustibles
By I. E. Perera
Experiments were conducted to evaluate the response characteristics of commercially available gas, smoke, and flame sensors to fires of common combustible mine materials. The experiments were conducte
Jan 1, 2012
-
Operations Outlined For Venezuela’s Paso Diablo Coal Project
By Dana A. Echter
The Paso Diablo coal project is located in the Guasare Basin in the northwestern region of Venezuela near the border with Colombia. In 1987, Carbones del Guasare SA, a joint venture comprised of Carbo
Jan 1, 1990
-
Constrained Interpolation and Soft Kriging
By A. G. Journel
The indicator random function formalism allows a common coding of hard numerical data, constraint intervals, and soft qualitative information as prior probability distributions. The soft kriging algor
Jan 1, 1986
-
Tunneling In Gassy Ground
By John W. Critchfield
This paper presents an overview of some of the basic issues related to tunnel construction in the presence of flammable and toxic strata gases. Gas properties and possible sources are outlined for the
Jan 1, 1985
-
CFD Analysis Of Two-Phase Flow In Wemco-300 M3 Supercell
By H. Fayed
Two-phase (water and air) flow in a self-aspirated WEMCO flotation machine has been investigated using computational fluid dynamics (CFD). The geometric model is a replica of a 300 m3 cell. A 72-degre
Feb 27, 2013
-
Quantitative Vibration Evaluation Of Modified Rock Drill Handles
By T. N. Moore, E. M. De Souza
Vibratory hand-tools can produce Hand Arm Vibration (HAV) Syndrome in their operators. This disease, often called Vibration White Finger, can cause varying levels of hand-arm discomfort and, in severe
Jan 1, 1992
-
The Simulation Of Ill-Defined Processing Operations Using Connectionist Networks
By T. J. van der Walt
This paper proposes a new methodology to model ill- defined processing operations using neural nets (NN's). A process with many variables (large dimensionality) cannot be modelled adequately if l
Jan 1, 1992
-
Administrative Controls For Reducing Worker Noise Exposures (SME Annual Meeting Feb. 23-25, Denver, Colorado)
By D. R. Babich, E. R. Bauer
Noise-Induced Hearing Loss (NIHL) continues to be a concern of the mining industry. A new noise standard (30 CFR, Part 62) is aimed at reducing NIHL in mining through engineering and administrative n
Jan 1, 2004
-
Construction and Commissioning of the Kori Kollo Gold Project
By A. Anderson, G. May, C. Kubank, S. Meik
The Kori Kollo operation is owned by Empresa Minera Inti Raymi S.A., a Bolivian mining company. Inti Raymi is an eighty-five percent owned subsidiary of Battle Mountain Gold Company (BMGC). The remain
Jan 1, 1993
-
Environmental Considerations - Mine Water
By William T. Jr. Renfroe, Donald C. Gipe
INTRODUCTION Historically, pollution control in the metal-ore mining industry has been very limited. Unless mine water contained large quantities of solids, it was generally discharged without any
Jan 1, 1982
-
Design Methodology Used for the Lake Mathews Outlet Facilities Project
By S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd
The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of
Jan 1, 1999
-
A Comparison of the Semiconducting Properties of Abraded and Fractured Sulfide Electrodes: Pyrite and Galena
By F. M. Doyle, P. E. Richardson, E. Peters
A number of studies have attempted to correlate the semiconducting properties of mineral sulfides with their chemical reactivity. Frequently such studies are conducted on polished or abraded electrode
Jan 1, 1993
-
Microtunneling Challenges In Soft Ground Of Downtown Hartford, CT
By William Bergeson
This paper presents the challenges of the Homestead Avenue Interceptor Extension (HAIE) project in downtown Hartford, Connecticut. The new 72-inch (1,830 mm) sewer pipeline project consists of install
-
Stiffness And Strength Parameters Of The Ptolemais Calcareous Marls
By E. Steiakakis
This paper presents in detail the procedures followed and the results obtained in order to determine the stiffness parameters of the calcareous marls found in the lignite mines in Ptolemais, Northern
Jan 1, 2005
-
Geochemical Investigations and Gas Monitoring of an Acid Generating Waste Rock Pile
By J. Smolensky, M. Paul
The Nordhalde is a waste rock pile resulting from uranium mining near Ronneburg, Germany. The pile contains over 27 million m3 of waste rock. Typical seepage water has a pH of 2.7 and a sulfate concen
Jan 1, 2000
-
Heap Construction and Solution Application
By Omar A. Muhtadi
6.1 INTRODUCTION The three most critical factors in successful heap leaching operations are: • The methods employed to pretreat ore (i.e, crushing and agglomeration); • Placement of ore on the leac
Jan 1, 1988
-
New Roof Truss Improves Operational Safety
By J. Swensen, R. Brandon, A. Wallstein, S. Bessinger, J. Pile
It is generally agreed that C.C. White was the first to describe and market coal mine roof trusses beginning as early as 1967. White was issued a patent in 1969 1. Coal mine roof trusses were extensiv
Jan 1, 2004
-
Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)
By Jeff Salai
The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa
Jan 1, 2001