Search Documents

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning ? Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • DFI
    A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation Piles

    By Chris Leach, Lucie Spencer

    This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste

    Nov 1, 2022

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • ISEE
    A Case Study Examination of Two Blast Rounds at a Nevada Gold Mine

    By Joel Warneke, Cristian Caceres, Ed Mchugh

    NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i

    Jan 1, 2008

  • NIOSH
    A Case Study Examination of Two Blast Rounds at a Nevada Gold Mine

    By Ed Mchugh

    NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i

    Jan 1, 2007

  • SME
    A Case Study Exploring Field Level Risk Assessments as a Leading Safety Indicator

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    "DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp

    Jan 1, 2017

  • SME
    A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2017

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co

    Jan 1, 2017

  • SME
    A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2018

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co

    Jan 1, 2018

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME
    A Case Study from India on TBM Driving Under Low Overburden - RETC2023

    By Debasis Barman

    TBM (TBM) mining in urban areas particularly under low overburden is a big challenge to design and excavate. During excavation of the Lucknow Metro project, in Uttar Pradesh, India the metro authoriti

    Jun 13, 2023

  • NIOSH
    A Case Study in Applied Social Marketing: Developing an Occupational Safety and Health Product

    By Douglas F. Scott

    This case study provides an example of how social marketing was applied to meet the needs of business customers. Federal regulations require that all companies develop a written program to track hazar

    Jan 1, 2009

  • DFI
    A Case Study In Hand-Dug Caissons ? Synopsis

    Caissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,

    Jan 1, 2010

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar

    Jan 1, 2000

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar

    Jan 1, 1999

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • SME
    A Case Study in Successful Progressive Design Build Tunneling - RETC2023

    By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez

    Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and

    Jun 13, 2023

  • SME
    A Case Study In The Use Of Kinetic Models To Justify Expansion Of The Rougher Flotation Circuits At The Metcalf Concentrator

    By Richard C. Travis, Edward C. Dowling

    A detailed kinetic study of the flotation installation at the Metcalf Concentrator revealed a rougher flotation circuit operating under less than optimal conditions. Based on these results, a project

    Jan 1, 1993

  • SME
    A Case Study In Valuation Of Non-Producing Mineral Rights

    By Donald E. Warnken

    The Study concerns the estimation of fair market value (FMV) of non-producing mineral rights. Two approaches to value are used and the values determined by each are compared. The Study area environmen

    Jan 1, 2005