Search Documents

  • SME
    Case History of Mine Water Treatment at the Henderson Mine and The Adaptation to Bio-Monitoring Regulations

    By Jay Jones, William D. Rech

    The Henderson Mine developed a water treatment system in 1985 to meet the NPDES requirements for its mine water discharge. Unacceptable levels of Zinc and Manganese formed the basis for the design and

    Jan 1, 1991

  • AUSIMM
    Case History of the Corridor Orebody, Mount Lyell, Tasmania

    By McKenzie A. M

    The Corridor ore body is so named because it occurs in an east-west zone or corridor of schist bounded on the north by the siliceous conglomerates of Mount Lyell, and on the south by similar conglomer

    Jan 1, 1961

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e

    Jan 1, 1995

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed

    Jan 1, 1995

  • SME
    Case History Of The Gross Rosebel Gold Project, Suriname

    By M. Wasel

    The Gross Rosebel gold deposits are located in the Guiana Shield of north central Suriname. Initial discovery of surficial gold in 1880 by local artisanal miners preceded small-scale mechanized mining

    Jan 1, 1998

  • AIME
    Case History Of The Juniper Prospect

    By S. H. Ward, R. A. Barker

    THE Juniper Prospect is in Carleton County, N. B., at approximately 46º 31' north latitude, 67º 20' west longitude. During the summer of 1955 an area in west-central New Brunswick was sele

    Jan 1, 1958

  • SME
    Case History of the New St. Clair River Tunnel

    By J. F. McDonald

    On December 8th of last year, the new St. Clair River tunnel was holed-through to Port Huron, Michigan. The tunnel, commissioned by the Canadian National Railway, was needed to replace an existing tun

    Jan 1, 1995

  • SME
    Case History of the Orme Street Combined Trunk Relief Sewer Phase III

    By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold

    Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do

    Jan 1, 2003

  • NIOSH
    Case History Of The Response Of A Longwall Entry Subjected To Concentrated Horizontal Stress

    By D. Oyler

    The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL), RAG Pennsylvania and Strata Control Technologies of Australia collaborated in an intensive study

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • DFI
    Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC

    By Joseph C. Gillen

    This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d

    Jan 1, 2006

  • SME
    Case History Of The Wachovia?Knight Theater Pedestrian Tunnels

    By Eric Eisold

    The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • DFI
    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • SME
    Case history on the reduction of chlorides from mine water

    By Kathleen Lagnese, Srikanth Muddasani, Kashi Banerjee, Carla Robinson

    "Mine water generated from underground coal mining operations contains both dissolved and particulate solids. Dissolved solids primarily consist of sodium, calcium, magnesium, potassium, chlorides and

    Jan 1, 2014

  • DFI
    Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, California

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure

    Jan 1, 2015

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • DFI
    Case History: Multiple Axial Statnamic Tests On A Drilled Shaft Embedded In Shale

    By Paul J. Axtell

    Two new railroad bridges in Kansas City, Missouri are founded on drilled shafts embedded into the soil and underlying shale. The uncertainty arising from the non-homogeneous, anisotropic nature of mo

    Jan 1, 2006

  • DFI
    Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal

    By Randy R. Huberty

    Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result

    Jan 1, 2001