Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Changing Project Economics by the Application of Ore Sorting Technology
By Yi Ran Zhang, Nawoong Yoon, Brent Hilscher, Maria Holuszko
"Ore sorting technology has been rapidly advancing in recent years. Improving expected mill feed grade has a significant benefit to project returns, and can no longer be ignored. When there is an incr
Jan 1, 2018
-
Changing Requirements Of Ferroalloys For Flat Products - User?s Perspective
By A. K. Das, S. Pathak, C. Bhanu, P. K. Tripathy
Ferroalloys are integral part of steel melting process. The purpose of using ferroalloys is three fold e.g. killing of steel, modifying the slag composition and steel alloying. Amount of ferroalloys u
Jan 1, 2007
-
Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine Closure
By P Audet, D Doley
The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc
Jul 16, 2014
-
Changing Sampling Requirements And Systems In Underground Tennessee Limestone Mines
By Randy Sandrik
Sampling has evolved at two large underground limestone mines as conditions and product requirements have grown tougher over 100 years of mine life, requiring innovative techniques to insure delivery
Jan 1, 2005
-
Changing Sources of Metals
By W. A. Scheuch
DURING the present period of economic readjustment throughout the world, the daily press and technical journals have presented discussions km the control of production and its influence on expediting
Jan 1, 1931
-
Changing the Climate to Add Value
The theme of this Annual Conference of The Australasian Institute of Mining and Metallurgy is in the form of a question: `Adding Value to our Resources - Our Future?' There are two ways of look
Jan 1, 1995
-
Changing the game in comminution practices: VibroconeTM, a new crusher having grinding performance
By Hamid-Reza Manouchehri
"Sustainability calls for maintenance, rational use and enhancement of natural resources as well as balance consideration of ecology, economy, and social justice. The challenges in mining industry cal
Jan 1, 2014
-
Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine
CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto
Nov 25, 2010
-
Changing the Landscape of Surface Mining through Fully Wireless Initiation Systems
By Nolan Eckroade, Nigel Pereira
Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly
-
Changing the Way We Look at Conventional Mining
By Ryan W. Siggelkow
Mines today use various methods of mining to extract ore. Because of the dangerous nature of many of these processes, remotely controlled LHD machines are being used to extract the ore from the draw p
May 1, 2010
-
Changing the way we train
By F. Osmond, R. Kelly
"Malcolm Knowles, the famous adult educator once wrote: ""What a challenge we in human resources development face if we are to avoid the obsolescence of our workforce. I can foresee this challenge req
Jan 1, 1995
-
Changing Trends in Column Flotation Use – Their Impact for Australian Mill Operators
By D Frost, G Harbort, T Lipiec, N Deonarain
"The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them
Oct 10, 2016
-
Changing Trends in Gold Ore Treatment in Western Australia. The Problem of Refractory Ores
By Jim Avraamides
Historically, much of Western Australia's gold production has come from the refractory sulphide-telluride ores located in Kalgoorlie's Golden Mile. Most of the recent gold boom has been asso
Jan 1, 1989
-
Changing Trends In The Exploration, Mining And Metallurgy For Gold In The 1990's
By T. Peter Philip, Erich U. Petersen, William J. Tafuri, Donald M. Hausen, Douglas N. Halbe
Scarcely a month goes by that I or someone else at Newmont Mining or Newmont Gold isn't asked to give a talk on the topic I was asked to discuss today. Investors, financial analysts, geologists,
Jan 1, 1990
-
Changing World Of Mining ... Our Role Theme Of 1998 - SME Annual Meeting 2022
By Tim O'neil
Attendance exceeded 4,500 minerals professionals from all over the world at SME's March 9-11 Annual Meeting and Exhibit in Orlando, FL. The exhibit, of more than 600 booths, featured 398 of the m
Jan 1, 1998
-
Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron Ore
By A E. Petts
Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro
Jul 11, 2011
-
Channel Iron Deposits (CID) of the Hamersley Province (Western Australia)
By R C. Morris
The channel iron deposits (CID) (Ramanaidou, Horwitz and Morris, 1991; Morris, Ramanaidou and Horwitz, 1993; Ramanaidou, Morris and Horwitz, 2003; Morris and Ramanaidou, 2007) are one of the two major
Jan 1, 2007
-
Channel Iron Deposits - A Major New District Around the Caliwingina Creek, Central Hamersley Ranges,Western Australia
By T Gill, A Faragher, B Scott, V Kakebeeke
In 2000, after six year intensive exploration for high-grade haematite deposits, Rio Tinto included the channel iron deposits (CID) as a specific iron ore target in the Hamersley Province iron ore exp
Jan 1, 2009
-
Channel Tunnel - Overview And Contractual Arrangement
By Jack K. Lemley
This paper will provide an update of the Channel Tunnel Project including a discussion of the overall legal structure and management organisation. It is important to understand the mission that TML, a
Jan 1, 1991
-
Channel Tunnel Project French Works
By Philippe Dumont
Presentation of the project Underground civil works to be performed They include two single track running tunnels and a service tunnel of a length of fifty kilometers . Many cross adits (180 adits
Jan 1, 1991