Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine
By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah
Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected
Aug 24, 2015
-
OFR-135-83 Critical Parameters For Tailing Embankments
By Gregory B. Beacher
Analyses have been performed on geotechnical properties of copper, uranium and phosphate (gypsum) tailings materials, with the intent of identifying typical measures of variability within and among si
Jan 1, 1983
-
Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey
By C. O. Aksoy
There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary
Jan 1, 2005
-
Innovative Solutions In The Development Of An Expert System At CCI’s Empire Mine
By R. P. Sloan, A. S. Whitford
In November 1999, CCI's Empire Iron Mining Partnership and MinnovEX Technologies Inc. developed an expert system for advanced control of their Empire IV Grinding Section. Empire IV is comprised o
Jan 1, 2001
-
Monitoring airborne dust from quarrying and surface mining operations
By A. Dean, J. Roberts, I. Stone, J. R. Merefield
Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 10pp., 11 refs. No comple
Apr 1, 1995
-
RI 7385 Evaluation Of Electrowon Tungsten Sheet
By G. H. Keith
Electrowon tungsten powders were investigated with respect to consolidation, fabrication, and mechanical properties. Sheet, 0.03 inch thick, was produced and its tensile strength measured between 250°
Jan 1, 1970
-
Rock Classification For Portal Design
By G. K. Rogers
The portal, which is the near-horizontal, surface point of entry to an underground excavation, can often be an exceedingly difficult area in terms of ground control. Surface and subsurface failures at
Jan 1, 1989
-
The Mineralogy and Paragenesis of the Crocidolite Veins at Wittenoom Gorge, W.A.
Several factors contributing to the loss of fibre during treatment are a function of the paragenesis of the veins. The occurrence, of magnetite from the cap rock within the veins prevents complete fib
Jan 1, 1963
-
Aplicação De Aços Microligados De Elevada Resistência Mecânica Na Estrutura Do Protótipo Automotivo Fórmula Sae Da Unicamp
By Érico França Oliveira e Silva
O conceito de utilização de aços microligados de elevada resistência mecânica nas estruturas automotivas como forma de reduzir peso, aumentar desempenho, reduzir o consumo de combustível e proporciona
Aug 7, 2018
-
The Design and Use of Steel Fiber Reinforced Concrete Segments
By Michael R. King
The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared
Jan 1, 2005
-
Understanding Epithermal Ore Deposits from New Zealand Geothermal Systems
By P R. L Browne
Study of geothermal systems in the Taupo Volcanic Zone (TVZ) has significantly advanced our understanding of the processes of epithermal mineralisation. The three main lessons learnt are:
Jan 1, 1997
-
On the surface noxious gas emissions from old iron mines
By D. Grabowski, Z. Pokryszka
A study carried out in the iron basin of Lorraine (North-East of France) highlighted the existence of under-oxygenated and noxious gas emissions (carbon dioxide, radon…) in vast built-up areas related
Jan 1, 2003
-
South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington
By James Su
The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta
Jan 1, 1998
-
A Cyclone Furnace for Slag Fuming
Laboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti
Jan 1, 1964
-
Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions
Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions
Sep 13, 2010
-
Debt Finance: The Technical Factors
The key to the successful debt funding of a new mining project, whether in economically established or developing nations, is the submission of a comprehensive feasibility study. The feasibility stud
Jan 1, 1995
-
Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result
By J Belke
Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and
Jan 1, 2004
-
Tunneling at Hollywood Reservoir
By D. Olsen, S. Cole, J. Strid, G. Colzani
This paper focuses on the underground tunnel work at the Hollywood Water Quality Improvement Project (HWQIP) in Los Angeles, CA. The HWQIP is being constructed to provide a water distribution system t
Jan 1, 2001
-
Rib Support Optimization for a Room-and-Pillar Mine
The National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C
Jul 28, 2020
-
Recovery Of Platinum Group Metals From Automobile Catalysts--Pilot Plant Operation
By R. J. Kuczynski
The U.S. Bureau of Mines Reno Research Center operated a batch pilot plant to demonstrate high-temperature cyanide leaching for recovering platinum group metals (PGM) from automobile catalysts. Approx
Jan 1, 1995