Search Documents

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • NIOSH
    OFR-135-83 Critical Parameters For Tailing Embankments

    By Gregory B. Beacher

    Analyses have been performed on geotechnical properties of copper, uranium and phosphate (gypsum) tailings materials, with the intent of identifying typical measures of variability within and among si

    Jan 1, 1983

  • CIM
    Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

    By C. O. Aksoy

    There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary

    Jan 1, 2005

  • SME
    Innovative Solutions In The Development Of An Expert System At CCI’s Empire Mine

    By R. P. Sloan, A. S. Whitford

    In November 1999, CCI's Empire Iron Mining Partnership and MinnovEX Technologies Inc. developed an expert system for advanced control of their Empire IV Grinding Section. Empire IV is comprised o

    Jan 1, 2001

  • IOM3
    Monitoring airborne dust from quarrying and surface mining operations

    By A. Dean, J. Roberts, I. Stone, J. R. Merefield

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 10pp., 11 refs. No comple

    Apr 1, 1995

  • NIOSH
    RI 7385 Evaluation Of Electrowon Tungsten Sheet

    By G. H. Keith

    Electrowon tungsten powders were investigated with respect to consolidation, fabrication, and mechanical properties. Sheet, 0.03 inch thick, was produced and its tensile strength measured between 250°

    Jan 1, 1970

  • SME-ICGCM
    Rock Classification For Portal Design

    By G. K. Rogers

    The portal, which is the near-horizontal, surface point of entry to an underground excavation, can often be an exceedingly difficult area in terms of ground control. Surface and subsurface failures at

    Jan 1, 1989

  • AUSIMM
    The Mineralogy and Paragenesis of the Crocidolite Veins at Wittenoom Gorge, W.A.

    Several factors contributing to the loss of fibre during treatment are a function of the paragenesis of the veins. The occurrence, of magnetite from the cap rock within the veins prevents complete fib

    Jan 1, 1963

  • ABM
    Aplicação De Aços Microligados De Elevada Resistência Mecânica Na Estrutura Do Protótipo Automotivo Fórmula Sae Da Unicamp

    By Érico França Oliveira e Silva

    O conceito de utilização de aços microligados de elevada resistência mecânica nas estruturas automotivas como forma de reduzir peso, aumentar desempenho, reduzir o consumo de combustível e proporciona

    Aug 7, 2018

  • SME
    The Design and Use of Steel Fiber Reinforced Concrete Segments

    By Michael R. King

    The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared

    Jan 1, 2005

  • AUSIMM
    Understanding Epithermal Ore Deposits from New Zealand Geothermal Systems

    By P R. L Browne

    Study of geothermal systems in the Taupo Volcanic Zone (TVZ) has significantly advanced our understanding of the processes of epithermal mineralisation. The three main lessons learnt are:

    Jan 1, 1997

  • SAIMM
    On the surface noxious gas emissions from old iron mines

    By D. Grabowski, Z. Pokryszka

    A study carried out in the iron basin of Lorraine (North-East of France) highlighted the existence of under-oxygenated and noxious gas emissions (carbon dioxide, radon…) in vast built-up areas related

    Jan 1, 2003

  • DFI
    South 196th/200th Street Corridor And Bridge Crossing, Kent, Washington

    By James Su

    The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta

    Jan 1, 1998

  • AUSIMM
    A Cyclone Furnace for Slag Fuming

    Laboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti

    Jan 1, 1964

  • AUSIMM
    Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions

    Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions

    Sep 13, 2010

  • AUSIMM
    Debt Finance: The Technical Factors

    The key to the successful debt funding of a new mining project, whether in economically established or developing nations, is the submission of a comprehensive feasibility study. The feasibility stud

    Jan 1, 1995

  • AUSIMM
    Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result

    By J Belke

    Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and

    Jan 1, 2004

  • SME
    Tunneling at Hollywood Reservoir

    By D. Olsen, S. Cole, J. Strid, G. Colzani

    This paper focuses on the underground tunnel work at the Hollywood Water Quality Improvement Project (HWQIP) in Los Angeles, CA. The HWQIP is being constructed to provide a water distribution system t

    Jan 1, 2001

  • SME
    Rib Support Optimization for a Room-and-Pillar Mine

    The National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C

    Jul 28, 2020

  • TMS
    Recovery Of Platinum Group Metals From Automobile Catalysts--Pilot Plant Operation

    By R. J. Kuczynski

    The U.S. Bureau of Mines Reno Research Center operated a batch pilot plant to demonstrate high-temperature cyanide leaching for recovering platinum group metals (PGM) from automobile catalysts. Approx

    Jan 1, 1995