  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981

  • SME
    Cut And Fill Narrow Vein Mining At Hollister

    Narrow vein mining, with enough challenge and also where the cutting edge technology can be applied, is still a very important and exciting portion of the mining industry. Based on the deposit charact

    Jan 1, 2012

  • AIME
    Cut Cost at Chief Consolidated Mine

    By John G. Hall

    The unstable metal market during 1949, with resulting lower metal prices, has focused every mine operator's attention on the problem of reducing operating costs. Improvement in mining methods, us

    Jan 8, 1950

  • AIME
    Cut Exploration Costs With Photogeology

    By Kalman N. Isaacs

    BY minimizing time that must be spent in the field, intelligent application of photogeology offers tremendous savings in exploration programs. In areas so remote and hazardous that ground exploration

    Jan 4, 1958

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • IIMP
    Cut off y valorización de una veta

    By Rolando Luna B

    El presente texto señala las áreas operables y marginales de cada veta trabajada dentro de la mina a través de la limitación rentable y marginal durante y para la operación de la mina. Para ello, se d

    Aug 26, 1988

  • SME
    Cut Your Carbon Costs Using Microwave Reactivation

    By Ibrahim S. Balbaa, J. Terry Strack, James G. Hopkins

    A microwave system for continuously reactivating carbon, used in gold processing, has been demonstrated at a gold mine in Ontario, Canada. The pilot unit produced reactivated carbon at a rate of 12 kg

    Jan 1, 1998

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • DFI
    Cut-and-Cover Excavation Challenges

    By Sitotaw Y. Fantaye

    "The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver

    Jan 1, 2016

  • SME
    Cut-and-Fill at Homestake Mining Co.

    By Joel K. Waterland

    GENERAL DESCRIPTION Homestake Mining Co.'s operations are at Lead, SD. Production from the various methods used are: 1 155 753 t/a (1,274,000 stpy) by open cut-and-fill, 68 039 t/a (75,000 stpy)

    Jan 1, 1982

  • SME
    Cut-and-Fill at Mount Isa Mines Ltd.

    By B. Hornsby

    At the Mount Isa mine, Mount Isa, Qld., Australia, sublevel open-stope mining is used for copper ore while both sublevel open-stope and cut-and-fill methods are used for the silver-lead-zinc ores. Pro

    Jan 1, 1982

  • SME
    Cut-and-Fill at the Bruce Mine

    By Keith E. Dyas, John Nelson, Ronald T. Johnson

    GENERAL DESCRIPTION The Bruce mine of Cyprus Mines Corp. is located in Bagdad, AZ. The mining method used is open cut-and-fill. Of the annual production of 81 647 t (90,000 st), approximately 83% i

    Jan 1, 1982

  • SME
    Cut-And-Fill Mining In Sweden: Development Trends And Applications

    By G. Almgren

    With the exception of sublevel caving, the most common method of underground mining in Sweden is the "cut-and-fill" method. It is normally used for mining non-ferrous metals , and' is used extens

    Jan 1, 1975

  • AIME
    Cut-and-Fill Mining in Sweden: Development Trends and Applications (TRANSACTIONS - VOL. 260)

    By G. Almgren

    Swedish cut-and-fill mines are described with regard to location, production volumes, and grades. Development goals (such as higher productivity and better working conditions) are presented, and diffe

    Jan 1, 1977

  • SAIMM
    Cut-and-fill mining of metals base at Black Mountain Mine

    By P. J. Kinver

    This paper deals with the development of the cut-and-fill mining method at the Broken Hill orebody of Black Mountain Mineral Development Company (Pty) Limited, at Aggeneys in the north-western Cape Pr

    Jan 1, 1985

  • SME
    Cut-and-Fill Stoping - Introduction to Open Cut-and-Fill Stoping

    By Joel K. Waterland

    GENERAL DESCRIPTION Open cut-and-fill stoping for many years was prob¬ably the most widely used mining method in under¬ground metal mines. Then for a time this method was largely supplanted by the bl

    Jan 1, 1982

  • SME
    Cut-and-Fill Stoping as Practiced at Outokumpu Oy

    By Raimo Matikainen, Pekka Särkkä

    HISTORY The history of mining in the Outokumpu Co. shows continuous development of small and medium-sized mines, coupled with a permanent improvement in min¬ing methods and mechanization. Tables 1

    Jan 1, 1982

  • SME
    Cut-and-Fill Stoping at Lucky Friday Mine

    By Staff

    GENERAL DESCRIPTION The Lucky Friday mine is located in Mullan, Sho-¬shone County, Idaho. The mining method is horizontal slice cut-and-fill (with timbering for support or un¬timbered) using hydrauli

    Jan 1, 1982

  • SME
    Cut-and-Fill Stoping at Star Mine

    By Gordon Miner

    GENERAL DESCRIPTION At the Star mine, Hecla Mining Co., located in Burke, Shoshone County, ID, the mining method is horizontal slicing (timbered or untimbered) cut-and-fill using hydraulic sand backf

    Jan 1, 1982

  • CIM
    Cut-off grade calculations for an open-pit mine

    By H. T. John

    "The objective of this paper is to demonstrate how the optimum cut -off grade can be calculated for typical large tonnage openpit mines. In the examples, it is assumed that the concentrator tonnage is

    Jan 1, 1985