Search Documents

  • AUSIMM
    Deep Aquifer Shutdown Tests at Yallourn Mine

    By M Coulthard, J Rivalland, K Dugan

    Prior to 2001 Yallourn Mine has pumped approximately 1000 Megalitres of water per annum from aquifers beneath the mine floor in order to control aquifer pressures that were thought to have an influenc

    Jan 1, 2003

  • SME
    Deep Basing Facilities For Strategic Missiles Design And Construction Issues

    By R. K. McFarland, E. S. Diamant, L. Blake

    A number of concepts for basing strategic missiles facilities deep underground have been developed within the defense industry. Recently, several contracts were let by the Air Force Ballistic Missile

    Jan 1, 1983

  • CIM
    Deep Bed Thickener Operation at the EKATITM Diamond Mine

    By T. G. Paradis, C. A. Mohns

    "This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre

    Jan 1, 2000

  • DFI
    Deep Bored Piling in Soft Soil and High Lateral Loads

    By W. Sondermann

    "AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on

    Jan 1, 2014

  • CIM
    Deep Borehole Study Toward the Feasibility of Engineered Geothermal System (EGS) in Northeastern Alberta

    By Judith S. Chan

    With the increasing awareness of the need for the reduction of carbon emissions globally, geothermal energy, which offers a potential for cleaner energy generation, is one potential new source. In Alb

    Jun 1, 2012

  • AIME
    Deep Borings with the Diamond Drill

    By Oswald J. Heinrich

    (Supplementary Paper.) IN conclusion of a series of deep exploration-borings with the diamond drill, I beg to submit the following statements, supplernentary to those in my former papers on this s

    Jan 1, 1875

  • DFI
    Deep Caisson Foundations In China ? Synopsis

    By C. Y. Liu

    This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca

    Jan 1, 2010

  • DFI
    Deep Cfa Piles Application For Foundation In Queensland

    By Sameh M. Khella

    This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t

    Nov 1, 2022

  • AIME
    Deep Coal Mining In Springhill No. 2 Mine

    By William F. Campbell

    One of the deepest coal operations today is the Springhill No. 2 mine of Cumberland Railway & Coal Co., subsidiary of Dominion Coal Co. Ltd. Mining is now conducted at a slope distance of 14,000 ft, w

    Jan 9, 1958

  • DFI
    Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? Synopsis

    By Z. G. Lin

    In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate

    Jan 1, 2010

  • DFI
    Deep Compaction Using Vibratory Pile Hammers

    By Dennis Nottingham

    The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer

    Jan 1, 2013

  • SME-ICGCM
    Deep Cover Bleeder Entry Performance and Support Loading: A Case Study

    By Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti

    "How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr

    Jan 1, 2017

  • NIOSH
    Deep Cover Pillar Extraction In The U. S. Coalfields

    By Keith A. Heasley, Frank E. Chase, Christopher Mark

    Deep cover retreat mining (overburden in excess of 750 ft) is an important emerging issue which will intensify in the future as the more easily mined shallow seam reserves are depleted. Analysis of M

  • SME
    Deep Cover Pillar Recovery in the US

    By Chris Mark

    In the wake of the Crandall Canyon mine disaster, the U.S. Congress asked the National Institute for Occupational Health and Safety (NIOSH) to study the safety of deep cover pillar recovery operations

    Jan 1, 2009

  • SME
    Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By E. R. Bauer

    The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove

    Jan 1, 1999

  • SME
    Deep Cut Mining Investigation - Case Study

    By Richard Stoltz, Gary Smith

    This paper presents the findings of a face ventilation investigation, conducted by the Ventilation Division, Pittsburgh Health Technology Center, at a underground coal mine operating in the Illinois N

    Jan 1, 1991

  • SME
    Deep cut: ground control and worker safety in coal mines

    By E. R. Braer, C. J. Bise

    The trend in underground room-and-pillar coal mining is to employ remote-controlled, continuous-mining machines and extended cuts to depths of 12 m (40 ft) or more. This system of coal extraction, ado

    Jan 1, 2000

  • NIOSH
    Deep Cutting Double Arm Shearer - Objective

    Reduce the airborne dust generated in a longwall coal face. Approach Reduce the rotational speed and increase the depth-of-cut of the longwall shearer. How It Works An Anderson-Mavor AM500 d

    Jan 1, 1981

  • DFI
    Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The Netherlands

    By Klaus Pöllath

    The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri

    Jan 1, 2006

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006