Search Documents

  • SAIMM
    Deep Level Mining And The Role Of R&D

    By R. G. B. Pickering

    The Faculty of Engineering at the University of the Witwatersrand and the Mining Technology Division of the CSIR have co-operated to define the problems associated with deep level mining and in this p

    Jan 1, 1996

  • SAIMM
    Deep Level Mining And The Role Of R&D (SEPTEMBER/OCTOBER 1996)

    By R. G. B. Pickering

    The Faculty of Engineering at the University of the Witwatersrand and the Mining Technology Division of the CSIR have co-operated to define the problems associated with deep level mining and in this p

    Jan 1, 1996

  • DFI
    Deep Marine Foundations - An Introduction

    By Ben C. Gerwick

    This publication is intended to document recent innovations and technologies that have the best potential for effectively improving the quality of marine foundations while reducing the cost, time and

    Jan 1, 2013

  • SME
    Deep Mill Level Zone (DMLZ) underground mine planning evolution, PT Freeport Indonesia, Papua, Indonesia - RASIM22

    By Bastiawarman Rifki, Nugraha Nico, Priatna Anton

    The Deep Mill Level Zone (DMLZ) is one of the underground mines operated by PT Freeport Indonesia (PTFI). DMLZ is located approximately 1,500 m below ground level, where dominant rock types are skarn

    Apr 26, 2022

  • AUSIMM
    Deep Mill Level Zone – from Feasibility to Production

    By A Priatna, H Rumbino, T Casten

    This paper discusses the progress of the Deep Mill Level Zone (DMLZ) mine from the pre-feasibility study completed in 2005, through commencement of development access in 2008, completion of the feasib

    May 9, 2016

  • CIM
    Deep Mine Development at McIntyre Porcupine Mines, Limited

    By The Staff

    "IntroductionThe difficulties to be overcome in shaft sinking and development at depth are centred at McIntyre in and around No. 12 shaft. Generally they have been due to increasing pressures and temp

    Jan 1, 1950

  • CIM
    Deep Mining in South Africa

    SOME months ago a Committee on Deep-level Mining was appointed [by the Government of the Union of South Africa] to consider the possibility of gold mining being carried on at a depth below 8,500 feet.

    Jan 1, 1945

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • DFI
    Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an Embankment

    By Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume

    "Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult

    Jan 1, 2015

  • DFI
    Deep Mixing Core Data from LPV 111

    By Donald Bruce, Alex Reeb, George Filz, Wesley Schmutzler, Mitsuo Nozu

    "One million seven-hundred thousand cubic yards of deep mixing were installed to support an elevation raise of an earthen levee known as LPV 111, which is located in east New Orleans. The deep mixing

    Jan 1, 2015

  • DFI
    Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT Project

    By Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa

    "In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati

    Jan 1, 2015

  • DFI
    Deep Mixing for Levee Repair at Hurricane Protection Project, P-17A, Louisiana, USA

    By Peter Cali, David Yang, Rakshya Shrestha, Ralph Griffin, Sushil Kafle, Motoji Watanabe

    "As a part of the ‘US Army Corps of Engineers - New Orleans to Venice, Louisiana Hurricane Protection Project’, deep mixing ground improvement was designed to reinforce the soft ground for the emergen

    Jan 1, 2015

  • DFI
    Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC

    By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li

    "An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized

    Jan 1, 2017

  • DFI
    Deep Mixing in the United States: Milestones in Evolution

    By Donald A. Bruce

    "Abstract The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments we

    Jan 1, 2014

  • DFI
    Deep Mixing in the United States: Milestones in Evolution

    By Donald A. Bruce

    "The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong

    Jan 1, 2015

  • DFI
    Deep Mixing Method: A Global Perspective

    By Donald A. Bruce

    Various types of contemporary Deep Mixing Method (DMM) techniques have been used in the United States since 1986. Such techniques owe their origins to Japanese and Scandinavian developments, which beg

    Jan 1, 1998

  • DFI
    Deep Mixing Method: An International Overview Of Technology, Testing And Product

    By D. A. Bruce

    The Deep Mixing Method is a very valuable tool for combating problems related to in situ soil treatment, improvement, and retention. Many different variations are used throughout the world, and there

    Jan 1, 2001

  • DFI
    Deep Mixing Technologies for Lateral Support Systems

    By W. Sondermann

    "AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t

    Jan 1, 2014

  • DFI
    Deep Mixing Technology in Deep Excavation in Soft Soil Area of Shanghai

    By Jie-qun Zhai, Jian Jia, Ke Yang, Xiao-lin Xie, Yu Zhang

    "With cities’ development, underground space exploitation presents a need for bigger and deeper constructions now. Technical problems founded during the construction of deep foundation pit support bec

    Jan 1, 2015

  • DFI
    Deep Mixing Technology: Comparison between Laboratory and Field Test Result, Different Jobsite Application.

    By Alessandro Bertero, Stefano Valagussa, Filippo Maria, Wesley Schmutzler, Leoni

    "Abstract The Deep Mixing Method (DMM) represents a viable solution to improve the adverse geotechnical properties of foundation soils. Differences and the importance of performing pre-construction la

    Jan 1, 2014