Search Documents

  • CIM
    Back-analysis of the Extreme Squeezing Conditions in the Exploratory Adit to the Lyon-Turin Base Tunnel

    By G. Russo

    During the construction of the S.Martin La Porte access adit, 9m in diameter, extreme squeezing conditions occurred while crossing Carboniferous schistose formations, with diametric convergence up to

    May 1, 2009

  • IMMS
    Back-arc Rifting and Formation of the Hydrothermal Ore Deposits at the Northern Izu-Ogasawara Arc in the Western Pacific

    By E. Moriguchi, K. Tamaki, A. Okuda, K. Iizasa, C. Honsho

    The northern Izu-Ogasawara Arc is characterized by an abundant distribution of submarine calderas along the volcanic front to the back-arc rift zones. In many of these calderas hydrothermal activities

    Sep 24, 2006

  • DFI
    Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic Loading

    By Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert

    The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines

    May 1, 2022

  • AIME
    Backed -up Mills for Continuous Rolling (9074a620-ca34-45ad-8565-fdf285a1e900)

    By Howard Talbot

    THE history of the development of the strip in- dustry, mentioned in this paper, was covered in considerable detail by Stephen Badlam in his paper presented. before the American Iron and Steel Insti

    Jan 5, 1928

  • AIME
    Backed-up Mills for Continuous Rolling

    By Lloyd Jones

    THE strip industry made rapid strides in regard to both width and gage until about 1922, when the maximum width was about 20 in. In the hot mills, strips of thin gages in wide widths could be pro-duce

    Jan 3, 1928

  • SME
    Backfill - Whatever it takes

    By Dan Kump

    This paper provides an overview of Barrick Gold's Bullfrog underground mine backfill program. The Bullfrog underground mine was a gold mine that primarily used the underhand cut-and-fill mining m

    Jan 1, 2002

  • SME
    Backfill -- Whatever It Takes (55c598fa-a68c-4837-a73c-9de81a01def4)

    By D. Kump

    The Bullfrog Mine is an underground goldmine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999

    Jan 1, 1999

  • SME
    Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)

    By D. Kump

    The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.

    Jan 1, 1999

  • AUSIMM
    Backfill Alternatives for Regional Support in Ultra-Depth South African Gold Mines

    By G York

    South African gold reserves extend to great depths. However, strategies for the mining of such deposits have changed only slightly over the past number of years. Regional support at depth is currently

    Jan 1, 1998

  • CIM
    Backfill at Madsen

    By L. H. Van Loon, E. G. Crayston, A. F. Heather

    "IntroductionTHE PROPERTY of Madsen Red Lake Gold Mines. Limited. comprises fifty-eight claims located between Russet and Faulkenham lakes in Baird and Heyson townships of the Patricia portion of the

    Jan 1, 1954

  • SAIMM
    Backfill Cyclone Plants - A General Overview

    By B. Rainier

    This paper discusses the preparation of material for backfilling operations using hydrocyclones. Aspects dealt with include the advantages and disadvantages, material requirements, process constraints

    Jan 1, 1988

  • SME
    Backfill Design for Deep, Underhand Drift-and-Fill Mining

    By Graham Swan, Richard K. Brummer

    The paper begins by describing an underhand cut-and-fill mining concept for a 50m thick, generally tabular though irregularly shaped orebody dipping at 30 degrees and occurring at a depth of between 2

    Jan 1, 2001

  • AUSIMM
    Backfill for Bench Stoping Operations

    By K Kuganathan

    This paper describes a new methodology that can be applied to compare several bench extraction strategies requiring backfill. The method is applicable at the planning or operational stages and can be

    Jan 1, 1998

  • SAIMM
    Backfill heat load contribution in deep level mining operations

    By C. A. Rawlins

    In an underground mine the ingress of heat can generally be attributed to two sources (Rock exposure and artificial mechanisms). The heat load relating rock exposure is subdivided into stoping [~40%]

    Jan 1, 2003

  • SME
    Backfill No Top Access Narrow Vein Cut And Fill Stope At Hollister Mine ? Introduction

    Stope width was controlled around 3.5 feet for the narrow high grade vein system at Hollister Gold Mine. Without top access, backfill material was pumped from bottom access up into stope through a ser

    Jan 1, 2011

  • CIM
    Backfill Optimization and in-House Shotcrete Production at the Cluff Lake Mine

    By Jamel Sgaoula

    During 1998 COGEMA Resources Inc. announced that operations at the Cluff Lake mine will be suspended indefinitely by the end of year 2000 as a result of deteriorating uranium market conditions. To rem

    May 1, 2001

  • SAIMM
    Backfill Placement Technique On Vaal Reefs

    By C. Hey

    The cycloned gravitated tailings backfill system, also referred to as a soft or low density fill, has been implemented at Vaal Reefs. Inhibiting the success of the system was the problem of shrinkage

    Jan 1, 1988

  • CIM
    Backfill practice and technology at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "Kidd Creek Mines primarily employs sublevel blasthole stoping for underground mining operations. During pillar recovery in No.1 Mine and panel mining in No.2 Mine, the free standing fill exposures ma

    Jan 1, 1983

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    Backfill practices at the Williams mine

    By D. Bronkhorst, J. Rheault

    "Backfill practices at the Williams mine have evolved significantly since underground mining began in 1986. The use of conveyors as a means of transporting fill material to stopes has been discontinue

    Jan 1, 1994