Search Documents

  • DFI
    Consultants Can Be Safe, Too – A Collaborative Approach

    By Brian FitzPatrick, Michael J. Weaver

    Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration

    Jan 1, 2019

  • DFI
    Cost and Technical Comparison of Non-Destructive Test Methods for Drilled Shafts

    By Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt

    Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented

    Jan 1, 2019

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • DFI
    Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?

    By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs

    Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS

    Jan 1, 2019

  • DFI
    Deep Excavation Support: Innovative Shoring Design in an Urban Environment

    By Richard D. Luark, Fernanda S. Madrona

    Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons

    Jan 1, 2019

  • DFI
    Deep Foundation Advancements in Fargo

    By Ezra Ballinger, Matthew R. Glisson

    Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground

    Jan 1, 2019

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Definition of Drilling-Activity Patterns Based on Production Data Profiles

    By Diego Bellato

    Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th

    Jan 1, 2019

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • DFI
    Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality

    By Guilherme L. M. G. Carvalho, Zachary T. Fleming

    In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser

    Jan 1, 2019

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • DFI
    Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.

    Jan 1, 2019

  • DFI
    Diggs Does Deep Foundations

    By Robert Bachus, Nikolaos Machairasm, Allen Cadden

    Data Interchange for Geotechnical and Geoenvironmental Specialists (DIGGS) is a data transfer standard that is gaining widespread acceptance in the geotechnical and geoenvironmental communities. Origi

    Jan 1, 2019

  • DFI
    A Combination of Jet Grouting and MPSP Grouting in Iskar River Cascade Hydropower Plant in Bulgaria

    By Massimo Poggio, Gabriele Balconi, Andrea M. R. Pettinaroli, Mario Ruggiero, Riccardo Castellanza

    Grouting technologies are ground treatment techniques used for modifying the behaviour of a mass of soil or rock by injecting a mixture. The sleeved port pipes (also called Tube A Manchette) are highl

    Jan 1, 2019

  • DFI
    Geo-Foundations Project Information Management Systems on a Budget

    By Jamey B. Rosen

    As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech

    Jan 1, 2019

  • DFI
    Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise Building

    By A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane

    Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha

    Jan 1, 2019

  • DFI
    Ground Freezing: The Use of Liquid Nitrogen Systems Converted To Brine

    By Joseph A. Sopko

    There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th

    Jan 1, 2019

  • DFI
    Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface Challenges

    By Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo

    Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue

    Jan 1, 2019

  • DFI
    Efficient Torque-Installed Pile Use in Southern California

    By Jason Buenker, Molly Winston

    Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp

    Jan 1, 2019

  • DFI
    Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality Control

    By Franz-Werner Gerressen

    New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su

    Jan 1, 2019