Search Documents

Sort by

  • AUSIMM
    Why Accounting for Uncertainty and Risk can Improve Final Decision-Making in Strategic Open Pit Mine Evaluation

    The objectives of this paper are two-fold. First, it will show what problems can arise when single estimated values are substituted for a distribution of values when evaluating an open pit mine projec

    Jan 1, 2009

  • SAIMM
    Alarm and evacuation systems in underground mining

    By J. L. Fuentes-Cantillana, Á. Rodríguez, P. Morillo

    Evacuation operations from work places in the case of an emergency are the key to minimising the effects of catastrophic type accidents such as fires, explosions, cave-ins, floods, etc. The correct pl

    Jan 1, 2003

  • AUSIMM
    Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South Limited

    Two of the problems long associated with the complete extraction of level pillars in the wide ore bodies of Broken Hill have been: (1) The high cost of maintaining level gangways through areas of slow

    Jan 1, 1941

  • AUSIMM
    Stratigraphic, Mineralogical and Physical Variations at Waikato - North Head, South Auckland: Preliminary Results

    By D Pastars, J L. Mauk

    Located at the southern end of the Awhitu

    Jan 1, 2001

  • CIM
    Development of Geometallurgical Comminution Mapping and Modelling

    By Luke Keeney, Stephen Walters

    "The start up of a new mining and metallurgical facility is a crucial step in the life of any mining project. The mining industries record is poor when evaluating processing plant operation relative t

    Jan 1, 2009

  • AUSIMM
    Geothermal Systems in New Zealand and The Philippines - Why are they so Different?

    The Taupo Volcanic Zone inNew Zealand and the Philippine Mobile Belt in the Philippines are characterized by active subduction, active volcanism and high seismicity. The main factors affecting charact

    Jan 1, 1995

  • SAIMM
    Solvent extraction design consideration for the Tati Activox® plant - Synopsis

    By E. Robles

    The Tati Activox® Project (TA®P) is the first step towards the implementation of the Norilsk Nickel Activox® process. The ultrafine grinding (UFG) and autoclave pressure leach process conditions are t

    Jan 1, 2009

  • NIOSH
    RI 5386 Change In Calorific Value And Certain Other Properties Of High-Volatile Bituminous-Coal Samples During Storage ? Summary And Conclusions

    By Roy F. Abernethy

    All samples tested showed some loss of heating value for the 5-month period under all 4 storage conditions. The losses increased as the time of storage increased, with the pan-storage samples showing

    Jan 1, 1958

  • AUSIMM
    Relationship Between Degree and Cost of Crushing and Flotation Recoveries of North Lyell Ore

    IN all wet concentration processes it is of primary importance to determine to what degree the crushing must be carried in order to obtain the maximum profit per ton of ore milled.To effect a clean se

    Jan 1, 1927

  • AUSIMM
    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding

    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa

    Sep 13, 2010

  • TMS
    Effects of the Mixed Surfactants on Detoxification of Chromium-containing Slag by Achromobacter sp. CH-1

    By Lijuan Chen

    During the detoxification of chromium-containing slag by Achromobacter sp. CH-1, anionic surfactant Sodium Dodecyl Sulphate(SDS) and its mixed systems with different Tween surfactants(Tween 20, Tween

    Jan 1, 2009

  • AUSIMM
    Flotation Practice at Mount Lyell

    THE flotation plant at Mount Lyell was erected, primarily, for the treatment of ore from the Lyell Comstock mine. These workings are situated over a mile in a direct line north of the North Mount Lyel

    Jan 1, 1920

  • NIOSH
    RI 3591 Determination Of Types Of Sulfur Compounds In Petroleum Distillates ? Introduction

    By John S. Ball

    [A system of analysis for sulfur groups in petroleum distillates has been developed as one phase of the Bureau-of Mines investigation of the more economic utilization of the so-called "black oils" of

    Jan 1, 1941

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • DFI
    A Simple Evaluation Of Dynamic Pile Tests

    By D. Kolymbas

    A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r

    Jan 1, 1989

  • SME
    Technical Innovations And Advances Make Wirtgen Surface Miner A Viable Alternative To Traditional Drill And Blast / Ripping Operations

    By R. Bauer

    Adaptations and redesign of the existing already very successful and proven road milling machine concept and technical innovations such as an optimized, specifically for mining application developed c

    Jan 1, 2007

  • AUSIMM
    Some Key Facts and Concepts in the Evolution of Sampling and Assaying Practices at Codelco

    Incorrect sampling and measurement operations and misunderstanding the components of variability can cause huge economic losses to the mining industry. The main objective of this paper is to illustrat

    Jan 1, 2008

  • AUSIMM
    A Quantitative Chemical Model of the Broken Hill Lead-Zinc Deposit

    A quantitative chemical model of the rocks of the Broken Hill lode environment is presented to illustrate a stratiform orebody in a meaningful form to scientists interested in environmental control on

    Jan 1, 1968

  • SAIMM
    The Transition From Open Pit To Underground Mining: An Unusual Slope Failure Mechanism At Palabora

    By Hao Li, Allan Moss, Richard K. Brummer

    At the Palabora Mine, the transition to caving 400 m below the bottom of the 800 m deep pit resulted in a slope failure of the North wall that began in 2003, and is still mobile. This failure can be

    Jan 1, 2006

  • CIM
    The use of wetlands for effluent polishing at Placer Dome, Campbell Mine

    By Benoit Bissonnette, David Gelderland

    "The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi

    Jan 1, 2003