Search Documents

Sort by

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • SME
    Interpretation Of The Effect Of Frother Type And Concentration On Flotation Performance In An OK3 Cell

    By B. A. Comley

    Over the past few decades a great deal of effort has gone into characterizing the effects of frother type and concentration in flotation using a variety of two-phase techniques. Whilst useful and info

    Jan 1, 2007

  • SME
    Analysis Of Sudden Floor Heave In Deep Western U.S. Mines - Preprint 09-010

    By H. Maleki

    As mining continues toward deeper reserves in thick western US coal fields, the control of mining induced-seismicity has become a priority in many operations in Utah, Colorado, and Wyoming. Gradual f

    Jan 1, 2009

  • SME
    Jabali / Yanbu – A New Source Of Zinc In The Middle East (fe9d2734-cc3c-4ef2-b8ec-54ed953ef19a)

    By K. M. Stone, N. J. G. Masson, A. C. Woollett

    The Jabali zinc deposit, in Yemen, contains at least 9.4 Mt at a grade of 10.7% zinc, 2.2% lead and 77g/t silver. The zinc occurs as smithsonite with minor hydrozincite. The Jabali ore does not produc

    Jan 1, 2002

  • NIOSH
    OFR-52-81 Wallrock Reactions To Mining Beyond A Preconditioned Zone At The Star Mine, Burke, Idaho

    By Wilson Blake

    Rock preconditioning in advance of mining was shown to be an effective means of rock-burst control based on the results of a field demonstration carried out on the 7700 level of the Hecla Mining Compa

    Jan 1, 1980

  • AUSIMM
    The Preparation and Properties of Cemented Carbides

    Much interesting data on cemented carbides has been published over a period of years which, when classified and pieced together, gives a clear picture of this special branch of powder metallurgy. This

    Jan 1, 1942

  • TMS
    Anode Casting Operation, Process Improvements And Anode Quality At The Ilo Refinery

    By Victor Raul Alarcon

    The Ilo Refinery was commissioned in 1975, with a cathode production capacity of 150,000 tpy. In 1994, Southern Perú Copper Corporation (SPCC) purchased the Refinery from Minero Perú SA. Subsequentl

    Jan 1, 2005

  • SAIMM
    Proceedings, 107th Annual General Meeting, 2004

    The 107th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 11 August, 2004. Welcom

    Jan 1, 2004

  • AUSIMM
    Deformation by Creep of a Specimen Lead Consisting of Five Large Crystals

    This paper describes the behaviour, under creep conditions, of a cast lead creep specimen consisting of five crystals, the boundaries of these crystals being substantially at right angles to the direc

    Jan 1, 1941

  • CIM
    Notes on the Operation of the Basic Copper (and Copper-Nickel) Converter

    By Anton Gronningsater

    AS we know, Sir Henry Bessemer introduced Bessemer converting in the steel industry about 1855. It was not until twenty years later that the principles were adopted by non-ferrous metallurgists. In 18

    Jan 1, 1942

  • SME
    The Tai Po to Butterfly Valley Aqueduct in Hong Kong

    By Derek. C. Arnold

    In order to meet increasing demands for water supply in the next millennium, the Government of the Hong Kong Special Administrative Region have identified the need for a major new water treatment and

    Jan 1, 1999

  • IIMP
    Aplicación de las Cadenas de Markov en los Procesos de molienda en Plantas Metalúrgicas y su comparación con la función selección y fractura

    By Luis Valle, Fredy Zegarra, Ernesto Vizcardo

    El uso de los procesos estocásticos y cadenas de Markov se ha desarrollado solo para estudios de probabilidades en la rama de las ciencias matemáticas y como una opción a las descripciones tradicional

    Sep 1, 2017

  • DFI
    Recent Advances In Large Diameter Diaphragm Wall Shafts

    By Benoit Virollet

    Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr

    Jan 1, 2006

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • AUSIMM
    Multiple Source LOTEM Surveys - An Alternative to CSMT Surveys

    By H Bibby

    Initial analysis of Long Offset Time Domain Electromagnetic (LOTEM) data has traditionally been made in terms of early and late time apparent resistivities. By using more than one grounded bipole as a

    Jan 1, 1996

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • ISEE
    Laser Based Slapper Detonator: The Next Generation

    By Dennis L. Paisley, Thomas P. Turner

    Laser slapper detonators are the next generation detonator under development at the Detonations Systems Group at Los Alamos National Laboratory and function very similarly to an electrical slapper. A

    Jan 1, 1994

  • SME
    Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone Mines

    By S. E. Phillipson

    During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t

    Jan 1, 2006

  • SAIMM
    Relationships between comminution energy and product size for a magnetite ore - Synopsis

    An extensive laboratory grinding study was carried out on a magnetite ore in order to assess the grinding behaviour of magnetic concentrate and tail from low intensity magnetic separation (LIMS).The t

    Jan 1, 2010

  • AUSIMM
    Mining Methods at Iron Knob, South Australia

    In setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T

    Jan 1, 1936