Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case Studies Demonstrating Value from Geometallurgy Initiatives
By A R. Bye
The mining industry is facing some key challenges that provide a compelling case for geometallurgy initiatives. Over the last 30 years, the average grade of Australian orebodies being mined has halved
Sep 5, 2011
-
Hoist Ropes for Double-Drum Winders ù A New Concept
By R Verreet
In April 2000 Mount Isa Mines installed hoist ropes of a new design on the double-drum winder at their P49 shaft. The ropes, CASAR Duroplast, were about three times as expensive as the previously used
Jan 1, 2005
-
Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May Operation
By S H. Algie, D P. Taplin, S G. Doig
"Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno
Oct 10, 2016
-
Mine Shafts – Planning, Optimising and Constructing
By D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations
By D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Fine-Tuning Raise Bore Stability Assessments and Risk
By W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
Selection of an Optimum Truck and Shovel Fleet Based on Effective Flat Haul and Capacity Constraint Modelling
By P Hagan, S Campbell
A study was undertaken using various methodologies to determine the optimum loading and hauling configuration for different haul routes at Callide Mine, a coal mine located in central Queensland. The
Sep 18, 2012
-
Application of an environmental ‘black carbon’ particulate sensor for continuous measurement of DPM in three underground mines
By J C. Volkwein, A D. A Hansen, E Sarver, C Barrett
Ensuring that diesel particulate matter (DPM) levels in underground metal and non-metal mines are maintained below statutory limits is an essential requirement of mine ventilation systems. However, de
Aug 28, 2017
-
Safety and Financial Value Created by Good Slope Management Strategies and Tactics
By A R. Bye, T R. Stacey
Anglo PlatinumÆs Potgietersrust Platinums (PPRust) operates three open pits and plans to excavate 90 Mt of rock in 2007. With pit slopes expected to reach a height of 400 m, the geotechnical departmen
Jan 1, 2007
-
Ernest Henry Underground Mine – Access and Support Infrastructure Design
By P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!
By R Price, B H. Miller
"The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f
Nov 15, 2016
-
Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western Australia
By Martinick WG
In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t
Jan 1, 1986
-
Some Aspects of Rank Variation and Utilization of Coal
The proper selection of a coal for a particular use depends on knowledge of fundamental data concerning the coals that offer, particularly their type and rank. Type of coal depends on the nature of th
Jan 1, 1955
-
Liability of Technical Professionals in the Mining Industry - The Lawyers' Perspective
By Low Russell
Mark Westfield, writing in The Australian on 16 May 1994 stated: The role of the independent expert is crucial to Australia's investment system. When it falls down, there can be very dramatic
Jan 1, 1995
-
A Platform for Managing and Analysing Atmospheric Data in Underground Coalmines
By S J. Schafrik, Z Agioutantis, E C. Jong, K Luxbacher
Real-time monitoring of mine operating parameters is available at most mines. However, access to these data for an individual operation is typically underutilised by mine managers and technical person
Nov 4, 2015
-
The Use of Electric Current and Equipment for Domestic Purposes at Mount Lyell
OWING to the gradual depletion of the hitherto plentiful supply of firewood in the immediate vieinity of Queenstown and Gormanston, which caused a steady increase in the cost of fuel for domestic purp
Jan 1, 1927
-
The successful deployment of a fatal risk system, designed for the front-line
By C J. Pitzer
The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine
Mar 29, 2023
-
Risk-based Rehabilitation Strategies for Post-mined Land in Fiji
By J J. Robinson, B N. Noller, D M. Franks, G McIlveen, D R. Mulligan, A T. Soro
Fiji is a developing nation that relies on economic opportunities and recently experienced increased interest in mining and mineral exploration that could potentially benefit the country. In order to
Jul 16, 2014
-
Diesel Exhaust and the Underground Miner in Western Australia
By O Jones
Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and
Aug 31, 2015
-
Understanding the causes of dilution in narrow vein stopes
By S Thomas, S Ricketts, R Hassell
Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d
Mar 15, 2021