Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of the Yarra River Crossing
By R Blair
The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru
Jan 1, 1999
-
Stope-Survey Practice at Mount Lyell
By Coulter L. J
THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved
Jan 1, 1915
-
Official Opening and Address
Good morning. I am very pleased to be invited to present the Opening Address to this inaugural New Zealand Minerals & Mining Conference. It is indeed a pleasure to see so many representatives of t
Jan 1, 1997
-
Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models
By M Astorga, J Jackson, J Gaunt
The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w
Nov 24, 2014
-
Material handling testing and control system requirements for dry stack tailings
By R Stefansen, T Wisdom, A Nicholson, K Rahal
The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F
Jul 23, 2018
-
Mining Practice at Cleveland Tin N.L. Tasmania
A mechanised sub-level overhead benching method is used at Cleveland, to produce 22,000 tons per month of ore assaying 0.92% Sn and 0.40% Cu. The ore occurs in a series of vertical lenses which can b
Jan 1, 1970
-
A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning
By C Niemann-Delius
The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new
Sep 26, 2011
-
Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited
By Slater R
The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The
Jan 1, 1982
-
The Design and Construction of a Reinforced Concrete Headframe for the Haulage Shaft at the New Broken Hill Consolidated Limited Min, Broken Hill
The construction of mine headframes of reinforced concrete is not a new departure as many structures have been built of this, material particularly in Canada and South Africa. This type of constructio
Jan 1, 1956
-
Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits
By A Melkumyan, K Silversides
The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.
Nov 24, 2014
-
The Application of Linear Programming to the Blending of Coals for Export
The application of new and currently practised mining techniques in new areas and at greater depths necessitates considerable and immediate research effort. This effort is aimed at identifying the
Jan 1, 1981
-
Cracking the Metallogenetic Code for Fijian Epithermal Gold Mineralisation
By S Lal, S Rost, Q Williams, K Collerson
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Shoshonite suite (absarokite-shoshonite-banakite) and adakite-hosted epithermal Au deposits
Mar 18, 2015
-
Underground Quarrying - A Challenge for the Next Millennium
By M A. Ohsberg, A C. Robertson
Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and
Jan 1, 1999
-
Ore Reserve Estimation - The Systematics to Get it Right
By S N CARRAS
Ore reserve estimation is a procedure involving data collection, data storage and judgement and assumptions about geology mining and metallurgy. Calculations are based on these assumptions and an e
Jan 1, 1992
-
Designing User Interfaces for the Mines of the Future – User Centred Approach
By E Widzyk-Capehart
The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed
Nov 22, 2011
-
Bankshooting Techniques at Moura Open Cut Coal Mine, Queensland
By Hoppe AJ
Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro
Jan 1, 1978
-
Bauxite Residues ù A High Volume Resource
By E Jamieson
For a number of years, Alcoa World Alumina Australia (Alcoa) has been investigating opportunities to produce economically viable products from bauxite residues. Three of these potential products are d
Jan 1, 2004
-
Mass Blasting at Elura Mine
By G Kennewell
At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp
Jan 1, 1999
-
Renewed Exploration in Canada's Premier Iron Ore District - Labrador West
By J OÆDriscoll, R Butler, L Winter
The iron ore mining district of Labrador West and adjacent Quebec is Canada's largest iron ore producer with almost 50 years of production. The area is currently experiencing a period of renewed
Jan 1, 2009
-
Mine Pit Slope Geotechnical Design
Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri
Jan 1, 2006