Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Escondida – Phase IV Grinding Circuit

    By Walter S. Bergholz, Michael L. Schreder

    "Since Escondida began operations in fiscal 1991, a series of aggressive expansion projects have enabled market share to be increased and ever larger profits to be realized. This was possible due to t

    Jan 1, 2004

  • CIM
    Review of the Factors Controlling the Environmental Mobility of Rare Earth Elements

    By C. J. K. Purdy, H. E. Jamieson

    "The comprehensive assessment of the environmental impacts of mining rare earth element (REE) deposits depends on a sound knowledge of the mobility of REEs in low-temperature aqueous environments. Tem

    Jan 1, 2012

  • CIM
    Shear-Bond Strength of Thin Spray-on Liners as a Surface Support Mechanism in Underground Rock Support – A Review

    By D. Kalumba, S. Jjuuko

    "Thin Spray-on Liners resist relative small deformations (< 1 mm) between rock blocks or fragments in terms of a combination of shear, adhesive and tensile-bond strengths. Shear-bond strength addresse

    Jan 1, 2015

  • CIM
    The Influence of Roasting Temperature Upon Gold Extraction by Cyanidation from Refractory Gold Ores

    By R. Carter, C. S. Samis

    "SummaryThe results of this investigation indicate that the gold in the cyanide tailing of refractory gold cyanides is occluded in fused •particles formed during roasting. This conclusion was reached

    Jan 1, 1952

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Mine ventilation fan specification and evaluation

    By J. S. Stachulak, K. A. Mackinnon

    This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera

    Jan 1, 2004

  • CIM
    Texasgulf's assessment centre - a six-year evaluation

    By Robert A. Macinnes, Peter Moon, John P. Pappone

    "This paper, in presenting the results of the application of the assessment centre method at Texasgulf Canada Ltd., illustrates a novel "" in-use"" technique for manpower training in the mining indust

    Jan 1, 1981

  • CIM
    Industrial Evaluation of Sonic Injection in a Peirce-Smith Converter at the Lonmin Platinum Smelter

    By G. A. Bezuidenhout, J. Davis, S. Lefume, J. P. T. Kapusta, D. K. Chibwe

    "Although the centennial of the Peirce-Smith (PS) converting process has recently been celebrated, the technology has essentially not changed much since its inception. PS converting is used extensivel

    Jan 1, 2012

  • CIM
    On the Impact of Potential Processing Technology Developments on Rare Earth Mining Economics

    By P. Klossek

    It is estimated that China accounts for 94% of the world supply of rare earths (Roskill, 2011). This fact, together with the impact of China?s export policy, poses a substantial risk to the security o

    Aug 1, 2013

  • CIM
    A new approach to waste dump site selection according to the fuzzy decision-making process

    By F. Samimi Namin

    During the process of developing surface or underground mines, some sites are considered for dumping of surface soils, while others are applied to reclaiming surface and waste disposal. For each kind

    Jan 1, 2007

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004

  • CIM
    Evolution of sandwich belt high-angle conveyors

    By Earl M. Frizzell, Joseph A. Dos Santos

    "Conventional belt conveyors offer an economical method for transporting materials at inclines approaching 18 degrees. Sandwich belt conveyors may be used to transport materials at high angles, to 90

    Jan 1, 1983

  • CIM
    Radium-226 removal from a uranium mill effluent-physical/chemical treatment process development studies

    By R. Webber, D. Averill, L. Whittle, D. Moffeti, G. Kassakhian

    "This paper describes the recent pilot-plant work carried out on two alternative processes capable of producing an effluent containing less than 10 pCi/L total radium-226 activity and very close to 3

    Jan 1, 1980

  • CIM
    Preliminary Sizing and Selection of an HPGR Using Piston-Die Press Tests

    By P. Rosario

    "Current industry practice for HPGR assessment and sizing relies on conducting a series of tests using pilot-scale machines with roll diameters of 700 mm to 1000 mm. Substantial amounts of sample are

    Jan 1, 2019

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • CIM
    A New Design Approach of Roadside Cut Rock Slope Based on Ecological Environment Protection

    By Lian-Jin Tao

    With fast development of China modernization, road construction obtains great achievement. However, in the construction process of highway, especially the high-grade highway in mountainous area, there

    May 1, 2009

  • CIM
    A New Curriculum Prepares Future Engineers in Mineral Processing and Extractive Metallurgy at Laval University

    By Daniel Hodouin, Claude Bazin, René del Villar

    "A traditional linkage has long been established at Laval University's Department of Mining & Metallurgy between the Mineral Process (MP) and the Mining Exploitation (Min) on one hand, and between the

    Jan 1, 1999

  • CIM
    Diffusion Coefficients of the Rare Earth Elements in Fused LiCl-KCl Eutectic – A Literature Review

    By K. C. Marsden, B. Pesic

    "Interest in the efficient production and recycling of rare earth elements has increased in recent years along with the prices of these elements. The molten LiCl-KCl eutectic is one ionic solvent whic

    Jan 1, 2012

  • CIM
    Design Fundamentals for Hydrometallurgy Pressure Vessel Refractory Linings

    By A. Koning, P. Lauzon

    Pressure hydrometallurgy operations require vessels to be lined with an impermeable membrane for corrosion protection and one or more courses of refractory or ceramic brick. Examples of unit operation

    Jan 1, 2004