Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures
By Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai (c152f4a9-990c-402e-baf3-fbbcafc7e905)
By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
Protection of Waterfront Properties by Pressed-In Sheet Pile Seawalls
By Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
Deep Stabilisation in Sulphide Soil for Embankments in Sweden - Laboratory and Field Studies
By Bo Westerberg, Mattias Andersson, Yvonne Rogbeck
"Deep stabilisation has been used in Sweden for decades. The method has been improved to allow it to be used in different types of soils and with new binders. One challenging soil type in Sweden is so
Jan 1, 2015
-
Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998
By D. M. Holloway
As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity
Jan 1, 1998
-
Design Of Self-drilling Micropiles For Permanent Applications
By Racquel Nottingham, Freddy Lopez, Ole Gadermann
The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m
-
Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project
By Richard Hanke, Franz-Werner Gerressen
"The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re
Jan 1, 2015
-
Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place Piles
By Timothy C. Siegel
Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi
Jan 1, 2010
-
Effects Of Confining Stress During Curing And Shearing On Shear Strength Of Lime-Cement Improved Clays
By Ingrid Engeset, Solve Hov, Arnfinn Endal, Per-Anders Mortensen, Priscilla Paniagua, Bjørn Kristian Fiskvik Bache
During the last decades, it has become common practice in the Nordic countries to use dry deep mixing in soft clays with lime and cement in for example deep excavation pits in soft clay, or as a reinf
May 1, 2022
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture
By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case Study
By Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole Inspection
By Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Nyct's 207th St Yard Floodwall
By Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin
By Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis
By S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Unique Anchor Pile SOE System
By Andrew Stauble
This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg
Aug 1, 2023
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai
By Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts
By Alexandre Alex) J. Bredikhin
"DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel
Jan 1, 2017
-
Case Histories of Circular Secant Pile Access Shafts for Tunnels
By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep Foundations
By Beim Jorge, Piscsalko George
"Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi
Jan 1, 2015