Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown Calgary

    By Matthew Janes

    The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d

    Jan 1, 2008

  • DFI
    Design And Construction Of Shear Pins For Landslide Stabilization

    By Fei-chiu Huang

    A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv

    Jan 1, 2010

  • DFI
    Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada

    By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak

    "The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.

    Jan 1, 2017

  • DFI
    Engineering Foundation Support For Las Vegas Strip's Tallest Hotel Casino

    By Nicholas P. Gura

    This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A

    Jan 1, 2007

  • DFI
    Large-scale Shake Table Experiment On The Performance Of Helical Piles In Liquefiable Soils

    By Athul Prabhakaran, Ramin Motamed, Ahmed Elgamal, Milad Jahed Orang, Reza Boushehri

    Documented case histories from past earthquakes have exhibited the devastating effects of the liquefaction phenomenon on the performance of buildings that are often presented in the form of excessive

  • DFI
    Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - Outline

    By Les R. Chernauskas

    ? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T

    Jan 1, 2001

  • DFI
    Cut-and-Cover Excavation Challenges

    By Sitotaw Y. Fantaye

    "The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver

    Jan 1, 2016

  • DFI
    Complex Deep Foundation System for Tall Tower in New York City

    By Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f

    Jan 1, 2017

  • DFI
    A Geotechnical Data Base Development And Applying Data Mining Techniques To Extract The Common Trendes Of Offshore Geotechnical Properties Of South Pars Gas Field/ Persian Gulf IR-Iran

    By H. Shiri

    Iran's largest natural gas field is South Pars, geologically an extension of Qatar's 900-Tcf North Field. South Pars was first identified in 1988 and originally appraised at 128 Tcf in the e

    Jan 1, 2006

  • DFI
    Professional Responsibilities In Sub-Surface Investigations For Foundations. - Introduction

    By D. J. Ketkar

    It is a frequent experience to find that the Sub-surface Investigation (S.I.) data is either inadequate or misleading. However, such cases are rarely reported. Nonetheless, the projects suffer on-acco

    Jan 1, 1996

  • DFI
    Fundamental Issues Of Displacement Auger Piling: The European Perspective

    By Maurice Bottiau

    When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond

    Jan 1, 2003

  • DFI
    The Wireline Undisturbed Soil Sampling In Deep Foundation ? Synopsis

    By Z. Q. Bian

    The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam

    Jan 1, 2010

  • DFI
    The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid

    By Ping Yang, Tian-bin Li, Min-hui Wu

    "The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of

    Jan 1, 2017

  • DFI
    Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)

    By Dinesh Hinduja, Pérez: Miguel

    "Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders

    Jan 1, 2015

  • DFI
    Material Behavior And Ground Improvement ? Synopsis

    By J. K. Mitchell

    Soil improvement is examined within the context of the characteristics of different soil types, the types of ground improvement techniques that can be used to improve them, and the level of improvemen

    Jan 1, 2010

  • DFI
    A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ Piles

    By Joshua R. Omer

    A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio

    Jan 1, 2010

  • DFI
    Geosetta: Unearthing Geotechnical Data for the Benefit of All

    By Ross Cutts

    As a public servant geotechnical engineer, I observed how costly and valuable geotechnical field explorations are to the success of every project. Often however, the field exploration is a long and co

    Nov 1, 2023

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • DFI
    The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? Synopsis

    By J. P. Burland

    The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a

    Jan 1, 2010

  • DFI
    Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - Synopsis

    By Tomio Tsuchiya

    A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me

    Jan 1, 1996