Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dilution and Ore-Loss Optimization in Underground Mines
By Sami Kara, Marsel Nabium
As a mining project is developed from conceptual to production phases, there exists a variety of uncertainties and difficulties that affect the operation’s designs and economic values. A notable desig
-
Demonstration that an Efficient Blast Depends as Much on Easy Mucking as on Good Fragmentation
By R. F. Favreau, Patrice Favreau
"Ever since we have started to assist those responsible for blasting with blast simulation studies, we havebecome aware of an interesting aspect, namely that in 90 % of cases we are asked ‘‘Can you se
Jan 1, 2017
-
Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept
By Frank Sames
Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra
Jan 1, 1995
-
Field Studies of CO Migration from Blasting
By Richard J. Mainiero, Michael J. Sapko, Marcia L. Harris
Since 1988, there have been thirteen documented incidents in the United States and Canada in which carbon monoxide (CO) is suspected to have migrated through near surface strata into structures or oth
Jan 1, 2005
-
Overburden Blast Cast Designs, Economics and Case Histories
By Conny Postupack
The first principle one usually learns about blasting is that competence in this field is best gained by experience in making blasts rather than by reading a book or by listening to a lecture. The rea
Jan 1, 1991
-
High Performance Ionomer Polymers for Non Electric Shock Tubes
By K. Hausmann, W. Whelchel
The properties of ethylene Ionomer resins for the inner layer of non-electric shock tubes will be discussed in detail, and opportunities for property enhancement will be pointed out. A stiffness progr
Jan 1, 2010
-
Guidewall Demolition at Bonneville Dam
By Randall S. Marks
Bonneville Dam, completed in 1938, included the smallest and busiest lock on the Columbia and Snake River Navigation System. To expedite barge traffic through this restriction, a new larger lock was d
Jan 1, 1997
-
600 000 M.T to move, a High Risk Operation
By Jean-Sébastien Lambert, Serge Roberge
"At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their
Jan 1, 2016
-
Journal: 100 Years / Arms & Explosives London October, 1909
By Robert Hopler
Testing Stations Abroad At the Seventh International Congress of Applied Chemistry, Drs. Mente and Will communicated a paper on the above subject. All large coal-getting countries employ testing stati
Jan 1, 2010
-
Improvised Shaped Charges
By G. A. Walsh, M. Timm, S. M. Geerts
This paper will discuss the effectiveness and the general use of improvised shaped charges. Testing was conducted by the New Mexico Tech Student Chapter of ISEE and held at EMRTC. The first series of
Jan 1, 2010
-
The History of Intraline Distance in the United States
By Michelle Crull, Susan Hamilton
Explosives safety requirements in the United States began in 1909 when the American Railroad Institute questioned explosives manufacturers regarding distances necessary to protect employees and proper
Jan 1, 2010
-
Overburden Blast Cast Designs, Factors Affecting Results and Economics
By Connie Postupack
The purpose of the workshop is to show the effect of various blasting factors on the overall results.
Jan 1, 1994
-
Use of Signature Hole Analysis for Blast Vibration Control at the Highvale Mine
By Ron J. Elliott, Dylan Wedgewood
A series of five signature holes were blasted at the Highvale Mine and the resultant seismic data was analyzed to make recommendations on how best to address neighbour complaints regarding blast vibra
Jan 1, 2018
-
Rock-to-Sensor Transmissibility of Vibrations?Part 2
By R Castedo, L. M. Lopez, J. A. Sanchidrian
In 2014 the authors presented results from 13 tests made with two blasting seismographs on a vibration exciter. They measured coupling transmissibility as function of frequency (i.e. ratio of the vel
Jan 1, 2015
-
Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography Systems
By Laura Bustemante, Bruce Vandenberg, Fred Huettig
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can
Jan 1, 1998
-
Journal: 100 Years / Mining & Scientific Press San Francisco March 18, 1905
By Robert Hopler
This article, advocating having employees whose specific job would be to fire blasts in underground coal mines in llinois, was written 5 years prior to the establishment of the U.S. Bureau of Mines,
Jan 1, 2006
-
Cast Blasting Advances and Challenges at Arco's Black Thunder Mine
By Robert L. Martin, Brian W. Stump
"The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO
Jan 1, 1997
-
How Electronics Initiation has Changed the Rules of Blast Design
By Thierry Bernard
For many years now electronic initiation has brought the time parameter to the centre of blast designs forever. Although this parameter existed before the era of electronic detonators, Blasting engine
Jan 1, 2005
-
Demonstrated Improved Fragmentation and Optimized Explosive Distribution by Using Air Decks created with Stemming Plugs
By Alejandro Ferrada Vergara, María Jesús Barros Godoy
Reducing costs while maintaining productivity and achieving good results is a constant challenge in mining operations, especially in the drilling and blasting stage, since a bad blast can affect produ
Jan 21, 2025
-
Tall Structure Response to Close-in Urban Blasting in New York City
By Cathy Aimone-Martin, Robert Brentar, Brent Meins, James Lauer
Vibration measurements of multi-story structures in an urban environment began 3 years ago in New York City during close-in blasting to adopt correct measurement procedures and recommend revised groun
Jan 1, 2014