Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Statistical Characterization Of Coal-Mine Roof Failure: Suggestions And Case Study

    By Alan D. Smith

    [A standardized checklist in a questionnaire format, was established to investigate selected factors associated with coal nips roof falls, as derived from an intensive review of the literature. A plot

    Jan 1, 1984

  • SME-ICGCM
    Evaluation Of Support Performance In A Highly Stressed Mine

    By Hamid Maleki

    The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5

    Jan 1, 1994

  • SME-ICGCM
    Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)

    By Daniel W. H. Su

    This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan

    Jan 1, 1987

  • SME-ICGCM
    Effect Of High-Extraction Coal Mining On Surface And Ground Waters

    By Francis S. Kendorski

    High-extraction mining of coal and other stratified minerals has a predictable effect on the surface and subsurface. Impacts on ground waters in overlying strata and on surface waters, that are associ

    Jan 1, 1993

  • SME-ICGCM
    Finite Element Modeling Of Subsidence Induced By Underground Coal Mining: The Influence Of Material Nonlinearity And Shearing Along Existing Planes Of Weakness

    By Daniel W. H. Su

    Surface subsidence induced by multiple-panel coal extraction was calculated with finite element stress analysis. The use of nonlinear material behavior and GAP elements, which provide a realistic repr

    Jan 1, 1990

  • SME-ICGCM
    A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)

    By Frederick Carr

    1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote

    Jan 1, 1982

  • SME-ICGCM
    Stress Measurements for Safety Decisions in Longwall Coal (4b24fd83-539f-4e52-8928-06b50544afce)

    By Eric Zahl

    Researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health, Spokane, WA, have collaborated with three Western longwall coal mines in an ongoing effort

    Jan 1, 2002

  • SME-ICGCM
    Evaluating Roof Control In Underground Coal Mines With The Coal Mine Roof Rating

    The U.S. Bureau of Mines (USBM) has developed the coal Mine Roof Rating (CMRR) to aid in ground control. This paper describes the application of the CMRR at four coal mines operated by a major U.S. co

    Jan 1, 1994

  • SME-ICGCM
    New Approach to Evaluate the Stability of Yield Pillars

    By Khaled Morsy

    In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica

    Jan 1, 2003

  • SME-ICGCM
    The Development and Planning of Multiple Level Underground Limestone Mines

    By Bruce W. King, David A. Newman

    "Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str

    Jan 1, 2016

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    In-Situ Pillar Strength Determination for Two-Entry Longwall Gates

    By H. N. Maleki

    Extensive measurements and underground observations in three Western U. S. coal mines are integrated in this paper to determine in-situ pillar load-deformation characteristics for narrow (30 it wide,

    Jan 1, 1988

  • SME-ICGCM
    The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)

    By Laxminarayan Holla

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of

    Jan 1, 1992

  • SME-ICGCM
    Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience And Guidelines

    By Mao Bai

    Mining in situations where there exists a potential hazard from inundation has always existed in coal mining, and often reserves were left unmined in favor of reserves with no such hazard. However, in

    Jan 1, 1995

  • SME-ICGCM
    A Novel and Effective Method to Develop Tension in a Roof Bolt

    By Phillip E. Gramlich

    Through extensive practical experience and multiple studies, tensioned roof control systems have proven beneficial in difficult mining conditions. Due to increased mining of less desirable seams, ten

    Jan 1, 2014

  • SME-ICGCM
    Calibrating LaModel for Subsidence

    By Keith A. Heasley, Jian Yang

    "LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He

    Jan 1, 2016

  • SME-ICGCM
    Moranbah North Tests the Critical Caving Theories Every Geotech Engineer?s Dream, the Ability to Get More than Two Points on a Curve

    By Chris Strawson

    Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Austr

    Jan 1, 2007

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998