Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Chemical Basis of Flotation (4f77fd10-2462-403e-873d-32f147f6cfd3)Dr Wark said: I have not come to Broken Hill to tell you how to conduct flotation operations; indeed, during my short stay here I have already learned much concerning the process, of the many difficul
Jan 1, 1994
-
Aluminothermic production of silicon using different raw materialsBy M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin
Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development
Jun 19, 2024
-
Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to productionBy H Wright
Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp
Mar 29, 2023
-
The Application of Value Engineering Principles to Mining StudiesBy T Schrimpf, I Bryan
The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the
May 24, 2012
-
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer ProgrammingBy Y Li, S Ramazan, E Topal
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t
Nov 24, 2014
-
Risk-based approach for minimising tailings dam failuresBy M Barker, H Li
The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not
Jul 23, 2018
-
Critical and Deleterious Metal Deportment in Sulfidic Waste Rocks, Baal Gammon, North QueenslandBy A Parbhakar-Fox, B G. Lottermoser, N Fox
"Determining the deportment of economic and environmentally significant elements in sulfidic mine materials (eg ore, gangue and waste) requires the use of advanced microanalytical techniques, includin
Jun 15, 2016
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Design considerations for an iron tailings filtration plant and their conveying and disposal systemsBy C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez
In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for
Nov 8, 2021
-
Vibration control blasting for low stability final wallsBy G Wyartt
In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl
Nov 30, 2018
-
Sampling for Grinding Pilot Plant Test - The Effect of Size Distribution VariabilityBy S Brochot
During the development of a mining project, samples are taken for metallurgical tests. The sample can be a composite sample made of material coming from a selection of various drilling products or a s
Aug 21, 2012
-
Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)By García B., Wolff E.
In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg
Jun 17, 2024
-
The effect of vane shear rotation speed on the estimation of tailings undrained strengthBy B Wentzinger, Y Keulemans
This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va
Jul 1, 2021
-
Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant ModellingBy V Ser, R Crosbie
To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)
Jan 1, 2005
-
Developing Process Control Standards for Optimal Plant Performance at PanAust LimitedBy D Baas, D Bennett
This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr
Sep 1, 2014
-
Mid Sampling and Reserve Estimation Practice in the Base Metal OrebodiesThe Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr
Jan 1, 1987
-
Process optimization of Mount Morgan gold tailing retreatment plantBy Hampshire MJ
The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco
Jan 1, 1986
-
Physical Aspects of Fine Particle FlotationIn the flotation of fine particles, problems arise which do not occur with coarse-ground pulps. For example, the presence of colloidal or near-colloid- al gangue particles gives rise to ex- cessive
Jan 1, 1984
-
Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west TasmaniaBy A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson
Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun
Jul 27, 2015
-
Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway LineBy G Gopinath, R Balachander, H S. Venkatesh
This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project
Aug 24, 2015