Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Physical Aspects of Fine Particle Flotation

    In the flotation of fine particles, problems arise which do not occur with coarse-ground pulps. For example, the presence of colloidal or near-colloid- al gangue particles gives rise to ex- cessive

    Jan 1, 1984

  • AUSIMM
    The EMESRT Approach to Equipment Design - Bringing End Users into the Picture

    The Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member

    Dec 6, 2010

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine

    By T Purvis, J Calverd, A-K Greve

    The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h

    Mar 24, 2014

  • AUSIMM
    Development of a cold bonding technology to high-grade iron ore concentrate

    By J Caron, M Athayde, F Lavoie, R Joyce

    Decarbonisation has become a major challenge for the global steelmaking industry, turning towards new technologies aimed at carbon footprint reduction, which on its own accounts for approximately 9 pe

    Nov 8, 2021

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    Rehabilitation of Pasminco Broken Hill Mine North Operation

    By J Burgess, G Scanlan

    In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem

    Jan 1, 1998

  • AUSIMM
    Critical state soil mechanics in filtered TSF design

    By J Rola

    This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro

    Jul 1, 2021

  • AUSIMM
    Measurement of Blast-induced Pressure in Bench Blasting and Deciphering Explosive Performance through Rock Mass Response Analysis – A Methodology

    By A K. Raina, V M. S R Murthy

    Rock mass response in blasting is an important element to determine the performance of a blast along with its other outcomes. The near-field monitoring for rock mass response analysis is vital for det

    Aug 24, 2015

  • AUSIMM
    Social responsibility solutions provided by WebGen™ wireless initiation system in open cut mines

    By L Muñoz, L Steffen, W Vilas Boas, G Gontijo, R Macedo, C Braga, d D Machado, G Stevenson

    Mines operating close to communities face growing challenges, especially with their drilling and blasting activities. Proper management of environmental and community impacts is critical to provide su

    Sep 1, 2024

  • AUSIMM
    Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New Guinea

    By P Collier

    From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo

    Aug 22, 2011

  • AUSIMM
    Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, Australia

    By A R. McKinnon

    The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner

    Sep 20, 2017

  • AUSIMM
    Grade Control in Underground Gold Vein Operations - The Role of Geological Mapping and Sampling

    By J B. Collier, R M. Fraser, O Dahl, I M. Platten

    Grade control is a process of maximising value and reducing risk, through the delivery of quality tonnes to the mill via the accurate definition of ore and waste. It essentially comprises data collect

    Jan 1, 2009

  • AUSIMM
    The Application, Economics and Environmental Aspects of Biodiesel in Sustainable Mining

    By M Kuruppu

    The paper explores the sustainability of the Australian mining industry, and the potential for application of a substitute fuel into existing mining operations. This alternative fuel biodiesel is prod

    Jan 1, 2009