Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Variability of Gravity Recoverable Gold Values in Relation to Test Sample Size

    By S C. Dominy

    The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti

    Sep 29, 2013

  • AUSIMM
    A Non-destructive Testing Method for Measuring Bolt Condition

    By B Jones, M Chappell

    Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl

    Nov 5, 2014

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Common Infrastructure Project ù Development for the Future of PT Freeport Indonesia

    By B Mennie, R Poedjono, G Coad

    PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char

    Jan 1, 2005

  • AUSIMM
    Tailing filtration practices in Mexican gold and silver mines

    By S Gomez-Hernandez, P D. Munro

    Filtered dry stack tailing storage facilities offer many advantages over thickened tailing storage facilities and yet, most of the mining companies still prefer the latter.Some of the advantages of fi

    Aug 29, 2018

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    Discovery to Production – The Athena Gold Mine

    By D Howe

    The Athena gold deposit was discovered in 2007 by Gold Fields Australia Ltd, at the St Ives Gold Mine, 35 km southeast of Kambalda, Western Australia. Gold anomalism was identified in sheared Paringa

    Aug 22, 2011

  • AUSIMM
    Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground Operations

    By C E. Gawith

    The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole benc

    Mar 15, 2021

  • AUSIMM
    Exploration Possibilities for Diamonds in Victoria

    Diamonds occur in N.S.W., Victoria and north west Tasmania. Diamonds from different areas appear to have their own characteristics, lending weight to the suggestion that three or four different sou

    Jan 1, 1979

  • AUSIMM
    A Review of Gold Deposits in the Archaean Greenstone Belts of Western Australia

    By Ho SE, Neil Phillips G, Houstoun SM

    There are numerous individual gold deposits in the Archaean greenstone belts of Western Australia, but only 26 have productions and/or quoted reserves in excess of 10 tonnes Au. Most gold producti

    Jan 1, 1986

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury

    The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very

    Jan 1, 2003

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Introduction of and Experience Gained with Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia

    By E M. Jones

    On 26 June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19 000 m3 of saturated hydraulic fill into the

    Jan 1, 2008

  • AUSIMM
    Calcium based ternary nitrate salts for concentrating solar power applications

    By V Shrotri L Muhmood, P Gandhre

    The current work deals with the measurement of some thermophysical properties of Ca(NO3)2 based ternary nitrate molten salts as HTF (heat transfer fluid) / TES (Thermal Energy Storage) material for CS

    Jun 19, 2024

  • AUSIMM
    Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South Australia

    By A Querzoli, B Williams

    In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann

    Jul 25, 2018

  • AUSIMM
    Extractive Companies, Development and Environmental Agendas

    By B Harvey

    Achieving community and stakeholder endorsement during life-of-mine planning and implementation requires a business-connected approach, as opposed to charitable giving, disconnected offsets and enviro

    Jul 16, 2014

  • AUSIMM
    Mining a Narrow Tabular Reef at Depth with Reference to Rock Breaking and Associated Support Systems

    By Rosenblatt M, Gilroy J. A C Cunningham C V B

    Vaal Reefs Exploration and Mining Company Limited operates one of the largest producing gold mines in the world. The annual production of 76 tons of gold from 12 million tons of ore treated is obtai

    Jan 1, 1995