Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete

    By B Upton, J Mitchell

    The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug

    Jan 1, 2005

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Raw Materials Quality Management -An Essential for New and Ongoing Operations

    Better quality at lower cost is today's formula for remaining competitive in a world market. For an integrated steel company, high quality low cost steel production must originate before the

    Jan 1, 1986

  • AUSIMM
    Assessment of Underground Production Blast Designs and Blasting Performance

    By B Mohanty, D Zwaan

    Systematic near-field vibration monitoring of stope blasts was carried out in a large, deep underground mine. A total of 31 production blasts were studied in order to investigate the effectiveness of

    Aug 24, 2015

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure Plan

    By T A. Short, P L. Brown

    Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh

    Jan 1, 2003

  • AUSIMM
    Organic Management Structure – Its Advantages in a Mining Consultancy

    By G Pitkin, D Sorley

    The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga

    Jun 22, 2016

  • AUSIMM
    Pike River Coal - Hydraulic Mine Design on New Zealand's West Coast

    Pike River Coal Limited is in the process of developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the

    Jan 1, 2006

  • AUSIMM
    Mine Geology Practices at the Sunrise Open Pit

    By P Williams

    The Sunrise deposit is one of AustraliaÆs largest and most profitable gold deposits. It has consistently and spectacularly outperformed every resource model created. Currently over the life of the Sun

    Jan 1, 2000

  • AUSIMM
    Tailings Disposal Costs ù The Hidden Design Parameter

    The purpose of this paper is to look at the costs of tailings disposal, and in particular the comparative costs of different disposal methods in different situations. Costs are often the hidden design

    Jan 1, 2000

  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    From Mt Goldsworthy to Area C ù Reflections on Forty Years of Iron Ore Exploration in the Pilbara

    By D A. Kepert, I J. Tehnas, M A. Pudovsk

    BHP Billiton (BHPB) was the first company to start iron ore mining in the Pilbara at Mt Goldsworthy in 1966 through Goldsworthy Mining Limited (GML - then Consolidated Goldfields Australia, Cyprus Min

    Jan 1, 2002

  • AUSIMM
    A Unique Vessel for Offshore Construction

    By Dawson CF

    About 17% of the world's present day oil supplies comes from wells drilled in the continental shelf of some 28 countries. The demand for oil is increasing each year and is expected to quintuple

    Jan 1, 1970

  • AUSIMM
    Evaluation of a Microcel<sup>TM</sup> Sparger in the Red Dog Column Flotation Cells

    By S Sims, A Stradl, G Hope, B Lacouture

    Column flotation cells have been installed in numerous base metal operations around the world. The majority of these cells utilise conventional air-only spargers to introduce air into the bottom of th

    Jan 1, 2005

  • AUSIMM
    World Copper Demand in 2050

    For the mineral industry, sustainability seems to mean socially positive and ecologically neutral mineral extraction. Mines are financed and developed in response to demand for their products. The pur

    Jan 1, 2002

  • AUSIMM
    Beneficiating a Low Yield Coking Coal at Iscor's Grootegeluk Coal Mine

    The Grootegeluk coal beneficiation plant is situated near Ellisras in the Waterberg coal= field in the Transvaal, RSA. At this plant 15 million tons of coal bearing material per annum are benefici

    Jan 1, 1987

  • AUSIMM
    Upgrading Abel Mine Ventilation System - Case Study

    By A Lim

    "As Abel Mine continues to expand and increase production, the requirements of the ventilationsystem have also increased. This paper will outline the stages undertaken to increase the AbelMine ventila

    Jun 1, 2012

  • AUSIMM
    The Kermadec Arc, New Zealand - A Ten-Year Odyssey of Discovery Along the World's Most Hydrothermally Active Intraoceanic Arc

    Research cruises dedicated to seafloor hydrothermal activity along the Kermadec arc first began with the Sonne-135 expedition in 1998. This was followed by the worldÆs first systematic survey for vent

    Jan 1, 2008

  • AUSIMM
    Tube bundle analyser flow rate, why it is important

    By M Tsai

    Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa

    Oct 12, 2022

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017