Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    Supervisors and Teams at Work

    By T G. Neville, G Terrey, J Burns

    This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica

    Jun 22, 2016

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • AUSIMM
    The Wakamarina Gold-Scheelite-Quartz Lodes, Marlborough, New Zealand (9bf77519-b580-47e8-9eb8-9b83d23a66f7)

    By Brathwaite RL

    The gold-scheelite-quartz lodes of the Wakamarina valley were the most productive of the mesothermal gold-bear in the Marlborough Schist. Most of the production came from the Empire City and Golden Ba

    Jan 1, 1995

  • AUSIMM
    The Spatial and Temporal Variation of the Type and Rank of Australian coals

    Commercial or potentially commercial deposits of coal occur in Australia in strata ranging in age from Permian to Tertiary. The coals of each period tend to show a community of petrographic character

    Jan 1, 1975

  • AUSIMM
    Underground Hydraulic Filling Storage At North Broken Hill Limited

    An underground storage and filling distribution system is presently being established at North Broken Hill Limited in the No.3 Shaft area. This has been necessitat- ed by the dependence of the pres

    Jan 1, 1973

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Drainage Research at Mount Isa Mines Limited 1992 - 1997

    By Chend J

    Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled scopes has been the primary cause of bulkhead failures and emphasis is placed on r

    Jan 1, 1998

  • AUSIMM
    The Black Mountain Porphyry Copper-Gold Deposit, Baguio District, Philippines

    By P Waters, P Hollings, M Baker, D R. Cooke

    Over the last three million years, porphyry and epithermal mineralisation in the Baguio Mineral District has been driven by calc-alkaline magmatism associated with the subduction of the South China Se

    Jan 1, 2008

  • AUSIMM
    Mt Whaleback Mine Dewatering

    By Nidagal V

    This paper discusses the dewatering strategy adopted and the considerations and procedures required to incorporate a dewaterinq scheme into the Mt Whaleback mining operation. It concludes that in

    Jan 1, 1986

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    Challenges and opportunities in accelerating electrification of underground heavy haulage equipment

    By J Webb

    The mining industry is relatively niche and complex compared to other global industries in its safety and operating environment. Whilst some of the technology required to decarbonise the mining indust

    Mar 29, 2023

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Deep Lead Mining In Victoria

    By McCarthy P. L

    A distinctive feature of the goldfields of Victoria was the extrac- tion of gold from deep leads, that is the buried river beds of Vic- toria's ancient rivers and streams. It is estimated that ab

    Jan 1, 1988

  • AUSIMM
    Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis Equipment

    By Wickham P, Raeburn M. R

    The design and development of slurry sampling equipment for the Mount Isa Mines Limited on stream analysis installations is discussed in detail. Emphasis is given to the critical areas of slurry t

    Jan 1, 1976

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Underground Mining Methods at Mount Morgan, Queensland (4c024877-4266-4ad5-a39e-01b065af258e)

    By Sewell L. G, White H. S

    OWING to two large falls of ground which resulted in serious accidents occurring towards the end of 1908, it became evident that the "open chamber" system then in use was unsuitable for the

    Jan 1, 1911

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    Computerised Orebody Modelling and Mine Design for Chiria Iron Ore Deposit

    By Sen A. K

    The Chiria Iron Ore deposit falls within the well-known Horse-shoe-shaped Singhbhum-Bonai-Keonjhar belt in India, where most of the deposits supplying ore to various steel works of Steel Authority

    Jan 1, 1995