    An Integrated Underground Mining Approach to the Structural Complexity of the Empire Vein System, Golden Cross Mine, New Zealand

    By Barber S

    The Golden Cross Mine is located within the Waitekauri Valley near the southern end of the Coromandel Ranges, eight kilometres north-west of Waihi, North Island, New Zealand. The mine is owned and o

    Jan 1, 1997

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Balancing Competing Water Resource Demands and Mining in a Coastal Environment

    The mining of mineral sands in coastal aquifers is often constrained by other land use conflicts and inappropriate controls imposed through a lack of understanding of environmental interactions and

    Jan 1, 1988

  • AUSIMM
    Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction

    By M Hawkins

    The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.

    Mar 8, 2011

  • AUSIMM
    Design and Operation of Backfill Silos for Reliable High Solids Concentration Discharge

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri

    Jan 1, 1998

  • AUSIMM
    Distribution behaviour of B and P in Si-slag system at 1500°C

    By M A. Rhamdhani, K Avarmaa, A Putera, J Chen, G Brooks

    Silicon-based photovoltaic cells are currently the most dominant types applied to convert solar energy to electricity. In solar-grade silicon (SG-Si), the control of boron (B) and phosphorus (P) is ve

    Jun 19, 2024

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    Structural Geology of the Muja Open Cut and its Impact on Highwall Stability

    Discontinuities often have a very detrimental effect on the stability of mine highwall faces. The west wall of the Muja open cut is remarkable for the number and variety of discontinuity sets which oc

    Jan 1, 1993

  • AUSIMM
    Automatic search strategy for ROM stockpile recovery optimisation

    By M Wagner, H Assimi, F Neumann, C Garcia, B Koch

    Run-of-Mine (ROM) stockpiles are the inventory of valuable materials extracted from the mine. Depending on the customer requests, a selective addition of ore from stockyards should be selected at the

    Nov 10, 2020

  • AUSIMM
    The impact of ventilation on demand on impeller fatigue life

    By L Salvestro

    Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating

    Oct 12, 2022

  • AUSIMM
    Development and Testing of a Small-Scale Uranium Leach for Geometallurgical Applications

    By N L. Turner, K Ehrig, V Liebezeit, D J. Robinson, L L. Kuhar, N Francis

    Conventional industry tests used to determine leach recoveries are often fully monitored and may be time-consuming and expensive. Such tests may be limiting in geometallurgical applications where larg

    Sep 29, 2013

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Field-Based Alteration Mapping Using the PIMA (d75d44ac-62fc-45f2-b7f8-11b7f4b193f9)

    By Merry N, Cocks T

    The mineral exploration industry is increasingly aware of the importance of the relationship between mineralogical data and geochemical assay results. However, until recently, the cost and time const

    Jan 1, 1995

  • AUSIMM
    Utilization Characteristics of Australian Steaming Coals in Overseas Power Stations

    By Juniper LA

    ERM Consultants Pty Ltd was established in 1980 for the purpose of introducing a disciplined coal technology and power station planning service, to support Australia's efforts in establishing

    Jan 1, 1987

  • AUSIMM
    Options for Incorporationg High-Pressure Grinding Rolls into Comminution Circuits

    By Weller KR

    A study of high pressure rolls grinding of a number of Australian ores and minerals has been carried out using a pilot-scale machine with rolls 300 mm diameter and 70 mm wide. The results from this

    Jan 1, 1991

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Steam Outburst in a Hot Mine in Japan

    This paper describes a steam outburst in a metal mine which occurred in December 1992 in Japan, resulting in two fatalities. The outburst occurred just after blasting in a heading face 600 m below sur

    Jan 1, 2005

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023