Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Venturi Scrubber System for Dust Control on a Longwall FaceBy Rao S. B, Baafi E. Y
A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the
Jan 1, 1995
-
Managing remediation, and risk of failure, to complete extraction of a short life open pitBy C E. Woolley, A Hosseini, J Foster
Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m
Jun 22, 2022
-
Open Pit Strategic Mine Planning with Automatic Phase GenerationBy M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Assessment of Mill-Feed Sampling Strategies Based on a Variographic ExperimentBy K L. Olzard
At the WMC Resources Phosphate Hill operation, monitoring the quality of the ore delivered by the mine to the beneficiation plant is of prime importance to ensure the fertilizer is produced cost-effec
Jan 1, 2005
-
Evaluation of a New Vision System Algorithm for Automated Fragmentation Measurement from a ShovelBy M J. Noy
The automated measurement of rock fragmentation particle size distribution in the muck during muck excavation has been developing over the last 16 years. The introduction of stereo camera imaging of t
Aug 24, 2015
-
The role of scale in prediction of mine drainage chemistryBy N McIntyre, M Edraki, K R. Jain
From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch
Aug 2, 2023
-
The critical pool levels for the Yallourn Mine determined using the MGRI approachBy N Patel, S Narendranathan, T Mok, J Lowe
The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners
Aug 2, 2023
-
A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing PlantBy S Döpp
Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during
Jul 11, 2011
-
Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave MinesBy S Talu, E Savage, P Sturm, A van As
It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety
May 9, 2016
-
Improved Cleaner Circuit Design for Better Performance Using the Jameson CellBy R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro
In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily
Sep 1, 2014
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Australia's Resources of Mineral Sands - Their FutureAustralia is presently the world's principal producer of rutile and zircon, and also provides a major share of the world's ilmenite. Since 1980, Australia's share of the world's
Jan 1, 1996
-
Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater QualityBy C Linklater, J Chapman, A Watson
Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl
Jun 28, 2016
-
Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE ConcentratorBy B Murphy, T Mattsson, R Crosbie, T Maksimainen
"An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t
Oct 10, 2016
-
The Batu Hijau Porphyry Copper - Gold Deposit, Sumbawa Island, Indonesia (43993b5f-9a4d-407c-9874-a92d06b96dfb)By Clark GH
Batu Hijau is a porphyry copper-gold deposit located on Sumbawa Island in the western Banda Arc of Indonesia. The deposit has been evaluated from 54000m of drilling in 105 diamond drill holes over a
Jan 1, 1995
-
Setting new standards at Kanmantoo – effective grade control proceduresBy M Reid, H Arbon
Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an
Sep 20, 2017
-
Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of CompromisesIn practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest
Mar 1, 2010
-
Studies on Active Gold Mineralisation in the Waiotapu Geothermal System, New ZealandGold is actively precipitating at grades up to 80 g/tonne at and near the surface of the Waiotapu geothermal system, located in the Taupo Volcanic Zone of New Zealand. Many characteristics of this act
Jan 1, 1984
-
Oversize Reduction Project at the Iron Ore Company of CanadaBy R Pinksen
The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque
Jul 11, 2011
-
Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planningBy M Ozkayhan, N Arslan
"The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele
Sep 20, 2017