Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    A Computer System to Process Geological, Survey and Rock Mechanics Data for M.I.M. Holdings Limited

    By Smith E. L

    The Ore Reserve/Exploration System implemented at Mount Isa for M.I.M. Holdings Limited is a comprehensive computer system designed to process assay, geological, structural and survey data input v

    Jan 1, 1973

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    Automated Loading and Hauling Experiences at De Beers Finsch Mine

    By R Grobler, D Burger, L Alberts

    The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op

    Jan 1, 2008

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Should the Blast Exclusion Zone Be Based on a Qualitative or Quantitative Analysis? A Practical Implementation Conundrum

    By K Muller, T Oosthuizen

    Blast exclusion zones are instrumental in protecting equipment and personnel. When there is no constraint in footprint, the exclusion zone can be enormous, practically eliminating the hazard of flyroc

    Aug 24, 2015

  • AUSIMM
    Geology and Mineral Potential of the Ranger Project Area, Northern Territory

    The Ranger Project Area covers 78.6sq km and is approximately six km east-west by 14km north-south (Fig. 1). The area is known to con- tain two uranium orebodies, Ranger No. 1 and No. 3, two uraniu

    Jan 1, 1984

  • AUSIMM
    An Automated System for Flyrock and Fume Monitoring of Blasts

    By C K. McKenzie, P Popov, B E. Papillon, I Kharitonenko

    Flyrock produced by blasts in surface mining and quarrying is a major hazard that can result in serious injuries or property damage. This paper presents a fully integrated and automated approach for r

    Aug 24, 2015

  • AUSIMM
    Water Management at Capcoal Mine - Past, Present and Future Drivers for Sustainable Change

    By J C. Macintosh

    Capcoal Mine has modified its water use practices over the past 15 years. Two issues have changed the way water was managed:an economic review of water supply options for a planned expansion of the co

    Jan 1, 2006

  • AUSIMM
    The Upgrading of the Zinc-Lead Smelter of Commonwealth Smelting Ltd for the 1990Æs

    The Imperial Smelting Process (ISP) for the simultaneous smelting of zinc and lead was developed at Avonmouth from the 1930's with activity intensifying in the late 1940's/early 1950'

    Jan 1, 1989

  • AUSIMM
    Underground Construction Challenges Associated with the Albany Conglomerate in Auckland

    By L J. Strachan, O J. Hawes, S W. Crossen, R C. Roberts

    The Albany Conglomerate is a widespread geological unit found in northern areas of Auckland, New Zealand. It has previously been described as part of the early Miocene Waitemata Group which underlies

    Sep 17, 2014

  • AUSIMM
    New Circuits for the Treatment of Fine-Grained Zinc/Lead Ore at the Sullivan Concentrator

    By Egan J. R

    Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant testwork conduct

    Jan 1, 1993

  • AUSIMM
    Geology and Exploration of the Hamata Deposit

    By Young DJ

    Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con

    Jan 1, 1991

  • AUSIMM
    The Status of Risk Management in Australian Mining - A Best Practice Review

    In October 2005 Phelps Dodge mining, a US based company, visited several Australian mining companies and mine sites to ascertain the current applications of risk management methods in the organisation

    Jan 1, 2006

  • AUSIMM
    Productivity Enhancement Driver Assistance for Mining Machinery Based on Unique Two-Dimensional Radar Sensor Fusion Concept

    By C Augustin, M Hahn, K Nienhaus

    Operators of mining machinery like haul trucks or excavators have very limited information about the exact distance to other equipment as well as to the natural boundaries like berms, walls and struct

    Sep 26, 2011

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Developing flotation circuit control and automation for the Phu Kham Copper-Gold Operation concentrator

    By L Mikhael Gurieff, D Baas

    The Phu Kham Copper-Gold Operation (Phu Kham Operation) is located in the Lao People's Democratic Republic and is owned and operated by the Lao-registered company, Phu Bia Mining Limited (PBM). Au

    Aug 29, 2018

  • AUSIMM
    The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit mines

    By C Jacobsen, N Harries

    Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f

    Nov 29, 2022

  • AUSIMM
    Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator

    By M L. Muller, A R. O’Donnell

    The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants

    Aug 29, 2018

  • AUSIMM
    Precipitation of Mercury from Process Liquors with Aluminium

    By Bratt G. C, Horsham T. R, Langlois D. R

    Mercury is precipitated from weakly acidic sulphuric acid plant waste liquor at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited. Factors determining the choice of process a

    Jan 1, 1977