Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    A Simple Technique for Using High Energy in Blasting

    By S J. Hawke, L A. Dominguez

    In non-ferrous metal mining operations, it is generally necessary to crush and grind the ore to a very fine particle size to effectively liberate the contained mineral from the host rock. Fragmentatio

    Aug 24, 2015

  • AUSIMM
    Arc-Plasma Reduction of Tantalum Oxide with Carbon

    By Mimura K

    The carbon reduction of tantalum pentoxide was investigated in a plasma-arc furnace. The sample was a mixture of tantalum pentoxide and graphite, vacuum pressed into a briquette and was reduced at

    Jan 1, 1980

  • AUSIMM
    Legume and Grass Revegetation of Mine Tailings

    By C P. C David, J P. T Domingo

    Addressing nutrient deficiency, among other factors, is vital to the growth and establishment of plants in mine spoils and tailings ponds. Although several organic amendments are available for this pu

    Jul 16, 2014

  • AUSIMM
    Structural Controls and Strain Partitioning in the Red October Gold Mine, Western Australia

    By D Howe, J Conn, J G. McLellan, K Gates

    The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean

    Aug 18, 2014

  • AUSIMM
    Changes in Blasting Technology at New Broken Hill Consolidated Limited Mine, Broken Hill, NSW

    By Treglown N

    In any mining operation the curtailment of rising operating costs is of prime concern to management.One area of activity where costs are often disguised is that of longhole secondary breakage.This pap

    Jan 1, 1985

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    Revegetation of the Nagambie Gold Project

    Revegetation at Perseverance Mining's Nagambie Gold Project is an excellent example of cost effective revegetation in the Central Victorian Goldfields. Work has centred on waste rock dumps, veget

    Jan 1, 1992

  • AUSIMM
    Goafstream Sampling and the Barometer

    By M Brady

    "It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h

    Jun 1, 2012

  • AUSIMM
    Implementation of a High Energy Dissipation Ground Support Scheme

    By E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro

    Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg

    Mar 15, 2021

  • AUSIMM
    The Exploration Signature of the Coronation Hill Gold, Palladium and Platinum Deposit

    By C A Heinrich, Morse M. P, Cruickshank B. I, Pyke J. G, Whitaker A

    Very little public domain information is available on the exploration signature of the Coronation Hill Au+Pd+Pt deposit. From 1987 to 1990 the BMR (now AGSO) carried out geological, geophysical and

    Jan 1, 1994

  • AUSIMM
    Cross Wellacoustic Tomography to Locate Abandoned Underground Mines and Subsidence Failure

    The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomogr`aphic image reconstruction software for the detection and delineation of abandoned und

    Jan 1, 1992

  • AUSIMM
    Some considerations on rock slope stability issues in Afghanistan with an emphasis on Kandahar Region

    By A B. Jahed, Ö Aydan, T Ito

    In this study, the authors compiled some case history data and present some typical examples of rock slope stability issues in Afghanistan with a special emphasis on Kandahar region and categorise roc

    Nov 29, 2022

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    Flotation launder design and the measurement of critical froth transport parameters

    By B Wong, R G. Coleman

    In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const

    Aug 29, 2018

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    The Effectiveness of Interpanel Pillars in the Control of Surface Subsidence

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence poin

    Jan 1, 1992

  • AUSIMM
    Laboratory Study of the Subaerial Technique for Disposal of Olympic Dam Tailings

    By DiStefano AB, Dale SG

    This paper describes the laboratory study implemented to investigate the application of the subaerial technique to tailings disposal for the proposed Olympic Dam Mine. The results of the study and

    Jan 1, 1984

  • AUSIMM
    Power Generation Utilising Mines Gas

    By Callinan AN

    Broken Hill Proprietary Company Limited have recently commissioned a 14 Megawatt power station adjacent to its underground coal mining operation at Appin NSW. The power station is fuelled by metha

    Jan 1, 1987