Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Airborne contaminant monitoring strategy and technology

    By J H. J Holtzhausen

    Never has there been more focus on the health, safety, and well-being of our employees at the workplace. Ever evolving expectations of individuals, companies and clients are shaping regulatory reviews

    Oct 12, 2022

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    How Safe is Safe Enough?- A Paper on Risk Management in the Mining Industry

    By Neville Rockhouse

    This paper examines the interrelationship of conducting full risk assessments in the context of the coal mining industry and under the framework of the Health's Safety in Employment Act 1992. In the c

    Jan 1, 2007

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Mine Ventilation Model Validation - ItÆs not Rocket Science!

    By J Rowland

    "Ventilation models are invaluable tools for both prediction of routine daily ventilation changesin an operating mine to circuit performance expectations at the mine in 20 yearsÆ time. Arguably ventil

    Jun 1, 2012

  • AUSIMM
    Reconciliation – Outcomes and Expectations

    By W J. Shaw

    Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin

    Aug 18, 2014

  • AUSIMM
    The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

    By Matsuo T, Uga Y

    The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec

    Jan 1, 1987

  • AUSIMM
    Waste Not, Want Not – Rethinking the Tailings and Mine Waste Issue

    By S Joyce, Z Agioutantis, D van Zyl, D Shields

    Over the past 15 years, the mining industry has begun to incorporate the concepts of sustainable development and sustainable mining practice across the life cycle of mineral operations. This requires

    Jul 27, 2015

  • AUSIMM
    Chamfered backs to improve open stope stability in poor ground conditions

    By G Capes

    A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann

    Mar 29, 2023

  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011

  • AUSIMM
    Geophysical Exploration and Space Age Technology

    The past decade hap seen revolutionary advances in com-munications and information-handling techniques which have been stiriulated by "cold war" military requirements and by, current programmes for pr

    Jan 1, 1963

  • AUSIMM
    A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal Powerplants

    By K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma

    The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s

    Jul 29, 2014

  • AUSIMM
    Geological Aspects of the Discovery of Important Minerals in Australia - Nickel Sulphide Deposits of Western Australia

    The discovery of nickel sulphide deposits at Kambalda in 1966 heralded the development of ò an industry with a capital value of over $1.5 billion producing about 10% of the western world's nick

    Jan 1, 1988

  • AUSIMM
    Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, Laos

    By B Saunders, J Carpenter

    PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug

    Sep 20, 2017

  • AUSIMM
    Geology and Definition of the Wattle Dam Coarse Gold Deposit

    The Wattle Dam gold mine, located near Kambalda in the Goldfi elds region of Western Australia has recently progressed to an underground operation and is now believed to be Australia's highest gr

    Aug 1, 2010

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Borehole and Surface Geophysical Monitoring, and Simple Modelling of Groundwater Polluted by Waste Leachates

    By Barber C, Buselli G

    Detailed monitoring of point sources of groundwater pollution is expensive due to the high cost of drilling monitoring boreholes. Whether groundwater pollution is due to mining, industrial or domes

    Jan 1, 1988