Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of Newly Developed Shield Tunnelling Machine for Intensive Curve
By Yoshii Y
Many kinds of shield machines are being driven in the soft ground of Tokyo metropolitan area. Tunnel alignments for underground power transmission lines are generally planned to pass under public r
Jan 1, 1987
-
The Discovery and Evaluation of the Windara Nickel Deposits, Western Australia
By Wright R, Stock E. C
The Windarra nickel deposits known to date comprise two sulphide orebodies located at Mount Windarra and South Windarra. These orebodies, which are 15 km apart, lie within an ultramafic complex at
Jan 1, 1973
-
Effect of Tectonic Stress on the Stability of Slopes
By Wu Y. H, Lu J. P
Slope stability has now become a practical tool in the design and oper- ation of open pits. The stability of rock slope depends on many factors, including not only structural geology, the existence o
Jan 1, 1989
-
Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving Mine
By N Petropoulos and M J Thurley, E Righetti, M Wimmer
Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra
Aug 24, 2015
-
Do You Understand Your Legal Obligations in the Industry?
Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest
Jan 1, 2007
-
A New Approach for Prediction of Blast Induced Coal Fragmentation
By Thornton D, Esterle J, La Rosa D
Control of blast fragmentation has a significant impact on coal mine profitability. Two approaches for the characterisation of coal blastability, particularly in terms of fines, are presented. Both
Jan 1, 1998
-
Pisolitic Limonite Deposits in Northwest Australia
By Morgan B. D
Since the mid 1950s, limonite deposits of a new type have been found in the northwest of Western Australia. The deposits consist of extensive fossil valley fillings up to several hundred feet in depth
Jan 1, 1964
-
Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, Washington
By L Galisson, E Audigé, D Sowers
Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington
Sep 17, 2014
-
Regional scale structural influence on the Ernest Henry orebody below current mining levels
By E Philippa, B Miller
Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, a
Mar 22, 2022
-
Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine
By A K. Ghosh
"Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an
Nov 15, 2016
-
The Economic Climate for Mining in New Zealand (01b7c1a3-c189-4335-9116-ee02100e1776)
This paper presents a resume of the likely profitable mining areas in New Zealand. It covers the main "minerals" - gold, coal, oil and gas, ironsands, silica sands, clays, lump silica, perlite, sulphu
Jan 1, 1990
-
A Study of Competing Process Requirements in a Complex Tin Concentrator
By Weller K. R, Stewart P. S B, Restarick C. J
The performance of the Renison tin concentrator was assessed in detail for two arrangements of the three available ball mills. With two mills used for primary grinding and the third for regrinding t
Jan 1, 1977
-
The Control of Rotary Vacuum Filters in a Gold Recovery Plant
By Peverett N. F
The purpose of filtration in a gold reco- very plant is to separate the gold bearing liquid from the solids in the slurry. Some of the gold is inevitably lost due to incomplete separation. An inves
Jan 1, 1977
-
The Mineralization of the Kangiara Mine, N.S.W
The Kangiara mine is located within the Middle to Upper Silurian Hawkins Volcanics of the Douro Group near Yass, New South Wales. The deposit is a po1ymetallic type within a rhyolitic tuff.The ore min
Jan 1, 1976
-
Deformation of Retreat Gatroad in Interpanel-Pillar System
By Ichinose M, Tsuru T, Gotoh K
Since 1980, the Department of Mining Engineering at Kyushu University, in co-operation with the Ikeshima Colliery, Matsushima Coal Mining Co. Ltd., has been conducting a research project into longw
Jan 1, 1992
-
Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines
By P Moarefvand, M Osanloo
The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela
Sep 26, 2011
-
Assessment of Rock Slope Stability Using the Rock Mass Rating (RMR) System
The Rock Mass Rating (RMR) and Rock Mass Strength (RMS) classification systems for jointed rock masses are briefly reviewed, with particular reference to their use in slope stability studies. A correl
Jan 1, 1992
-
Occurrence of Outbursts at West Cliff Colliery
By Griffith L, Lama RD
West Cliff Colliery mines Bulli Seam occurring at a depth of approximately 480 m. The Seam is intersected by a number of small shear zones and faults. While the faults have caused displacement of t
Jan 1, 1980
-
Opportunities in the Contract Mining Industry
Thank you for the opportunity to speak at this important conference attended by aspiring mining professionals, some of whom will become the leaders of the mineral resources industry that forms the sol
Jan 1, 2002
-
Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin Smelters
By Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J
Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its
Jan 1, 1984