Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Zealand Listed Mining Companies - The Risks and Rewards for Investors

    Currently there are in excess of 200 companies listed on the New Zealand Stock Exchange and the total market value of all the listed shares amounts to $4.6 billion. The number of listed mining compan

    Jan 1, 1982

  • AUSIMM
    A Modified Cable Bolt System For The Support Of Underground Openings

    By Worotnicki G, Tillmann V. H

    Past experience with fully bonded cable dowels placed as a means of reinforcement in highly stressed crop pillars at the New Broken Hill Consolidated Limited (NBHC) mine indicated such support was

    Jan 1, 1983

  • AUSIMM
    The Evolution of Current Mine Design for Off Highway Truck Haulage

    Mine haul road design at Bougainville Copper Limited has undergone significant changes since mine start-up. Selection of 95 tonne trucks and the subsequent replacement by 155 tonne units is discuss

    Jan 1, 1982

  • AUSIMM
    Design and use of Backfill for Support in Polish Coal Mines

    Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of mi

    Jan 1, 1998

  • AUSIMM
    Development of a Treatment Method for a Low Grade Uranium Deposit

    By Kwok S, Haemmerle A

    Treatment methods for a low grade deposit at Mt. Fitch near Rum Jungle, N.T., were investigated. Physical beneficiation of the ore, sulphuric acid leaching, carbonate leaching and various methods of

    Jan 1, 1970

  • AUSIMM
    Best Practices in Process Simulation for Design of Complex Metallurgical Plants

    By H W. Scriba

    The development and improvement of computer-based process simulation packages over the past 20 years has provided process engineers with a powerful tool to use in the design of complex metallurgical p

    Jan 1, 2008

  • AUSIMM
    Development of a New Dry Density Separator for Fine-Grained Materials

    Development of a New Dry Density Separator for Fine-Grained Materials

    Sep 13, 2010

  • AUSIMM
    Rapid Location of Gold in Polished Sections with a Scanning Electron Microscope

    By Woodcock J. T, Rummel P. H, Sparrow G. J, MacRae C. M

    An automated method, which is believed to be the fastest in the world and which can be used by mineralogically-untrained technical assistants, has been developed for the rapid location of native gol

    Jan 1, 1991

  • AUSIMM
    Developments in Geophysics for Prediction of Structures Influencing Production in Mines

    In both surface and underground coal mines, the detection of geological structures ahead of workings is recognised as being fundamental to the efficient operation of the mine. Mining into zones of

    Jan 1, 1988

  • AUSIMM
    Optimisation & Control Development For An Expanded Grinding Circuit In NHBC Concentrator

    By Marsham B, Baker D. C

    The expansion of New Broken Hill Consolidated Limited (NBHC) concentrator necessitated the installation of hydrocyclone classifiers where rake classifiers had previously been used. Commissioning o

    Jan 1, 1983

  • AUSIMM
    A Facies Model for an Active Composite Volcano: Ruapehu, New Zealand

    By Houghton BF

    Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian

    Jan 1, 1987

  • AUSIMM
    Pilot Plant Heavy Medium Investigation for Mount Isa Lead/Zinc Ores

    By Di Pasquale S, Osler GD

    Mount Isa Mines Limited recently commiss ioned an 800 tph Heavy Medium Preconcentration Plant for lead/zinc/silver ores. The decision to build this plant was made in late 1979 based largely on inve

    Jan 1, 1978

  • AUSIMM
    Modern Management Systems for Higher Margins (9e634b58-ddc4-405d-b601-7ec0179e347f)

    Maximising margins in today's competitive international commodity markets demands superior productivity. This requires more than selecting the best equipment. It requires continually improving th

    Jan 1, 1998

  • AUSIMM
    Lessons from Manufacturing-Integrating Mining and Milling for a Complex Orebody

    By Tucker G, Clark A, Young M. F, Johnston M

    Mount Isa Mines has made a huge commitment to process control in milling. Yet in lead zinc we still failed to achieve a steady operation. Comparisons with manufacturing plants showed the key differe

    Jan 1, 1998

  • AUSIMM
    Western Woodlark Basin: Potential Analogue Setting for Volcanogenic Massive Sulfide Deposits

    By Scott SD

    The 1986 PACLARK Expedition established that propagation of a seafloor spreading zone into continental crust has created a complex series of volcanic basins on the floor of the Western Woodlark Ba

    Jan 1, 1987

  • AUSIMM
    Remote Sensing: A Cost Effective tool for Environmental Management and Monitoring

    By Cottrell EC

    Remote sensing has been used for many years but until recently its application has been limited by the resolution of the data available. High resolution airborne multi-spectral scanner data (MSS)

    Jan 1, 1987

  • AUSIMM
    Company Growth û Its Implications for Personnel Management and the Community

    By Jury C. G

    A decade of expansion and high production targets have led to changes in the number and structure of the Mount Isa Mines Limited work- force. Falls in labour turnover and absenteeism are correlated

    Jan 1, 1974

  • AUSIMM
    Red Dome Stage III Cutback - A Case Study in Brinkmanship

    By Paine G. G

    The Red Dome Gold/Copper Mine is located approximately 15 km west of the township of Chillagoe which itself is approximately 220 km by road west of Cairns, Far North Queensland. The deposit, with ot

    Jan 1, 1994

  • AUSIMM
    The Porphyry Gold Mine, W.A. From Prediction to Production

    The Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based

    Jan 1, 1986

  • AUSIMM
    The Taranki Oil-Field

    THE Taranaki oil-field is situated on the western side of the North Island of New Zealand, at about its widest part, and may be said to be the most compact and fertile part of the Dominion, for, with

    Jan 1, 1911