Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rehabilitation Strategies and Planning at Curragh Mine

    Curragh Queensland Mining Limited, a co-venture of Australian and overseas interests, operates a large multi-seam strip coal mine in Central Queensland. Coal uncovery is by four large walking dragline

    Jan 1, 1992

  • AUSIMM
    Vertical Crater Retreat Mining in the Sudbury Basin

    Faced with rising costs and lower metal prices, several Ontario base metal sulphide mines have changed their method of mining to vertical crater retreat mining. This is a bulk mining method that utili

    Jan 1, 1989

  • AUSIMM
    Gold Exploration of the Phuoc Son û Tam Ky Suture, Central Vietnam ù A Case Study

    By Le V, Nguyen Ngoc Quynh, R H. Murfitt

    The Truong Son Fold belt in Indochina hosts the significant Sepon gold-copper district (Laos) and the similar gold-basemetal districts of Phuoc Son and Bong Mieu (Vietnam). With over seven years of ex

    Jan 1, 2004

  • AUSIMM
    Isa Automatic Control Systems Development

    Mount Isa Mines operates Hewlett Packard 1000 computer systems for process control in its major mineral processing plants. To simplify control systems implementation, a process control software pa

    Jan 1, 1978

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997

    By A G. Greenwood

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include t

    Jan 1, 1998

  • AUSIMM
    Are You Being Served?

    The Cooperative Research Centres (CRC) Program was established and is supported by the Australian Government at a total cost of $140 million per year. Six of these centres have been established to h

    Jan 1, 1996

  • AUSIMM
    Ore Control to Deliver Metal Production at Ridgeway Gold Mine

    By A Tomsett, J Rutter

    Ore control systems at Ridgeway have been designed to deliver gold and copper metal production through focussing on the ore characteristics that impact on mine and mill performance and ultimately meta

    Jan 1, 2002

  • AUSIMM
    Engineering Potential of Seismic Methods of Assessing Rock Breakage Characteristics

    By Walter GW

    Rock mass classification systems for stable excavation design have been studied. The parameters which are important in such a classification system and those which should be included in a classifi

    Jan 1, 1978

  • AUSIMM
    Geology, Metallurgy and Mining Engineering - Why We Must Strengthen the Links

    Recent well-publicised problems with the start-up of new mining projects have continued to feed the perception that the mining business in general and Ore Reserves in particular are a poor risk. New m

    Jan 1, 2002

  • AUSIMM
    Stabilization Of Mine Residues In Broken Hill, New South Wales

    By Leigh J. H

    A history is given of the dust control techniques developed and applied by the mining companies at Broken Hill. A history of the regeneration works undertaken since 1936 is out- lined. Particular e

    Jan 1, 1976

  • AUSIMM
    The Geology of the Mesel Sediment-Hosted Gold Deposit, North Sulawesi, Indonesia (29cafc7f-df45-41c9-a3e9-70dac885efa7)

    By Lauricella P. F, Hendri D

    In the Mesel sediment-hosted disseminated gold deposit, the spatial distribution of hydrothermal alteration is controlled by steeply dipping faults and shallowly dipping lithologies. Hydrothermal alt

    Jan 1, 1995

  • AUSIMM
    The Role of Morphology and Host Rock Lithology on the Flotation Behaviour of Molybdenite at Kennecott Utah Copper

    By D Bradshaw

    The recovery of molybdenum at Kennecott Utah Copper (KUC) has become increasingly important as its demand and price have risen dramatically in the last few years. Consequently, the flotation behaviour

    Jan 1, 2008

  • AUSIMM
    The Minerology and Geochemistry of the Whim Creek Gossan

    The gossan developed from the Whim Creek Cu-Zn-Pb-Ag sulphide deposit, in the Pilbara region of Western Australia, occurs near the top of a ridge in a dissected plateau 01 moderate relief. The gossan

    Jan 1, 1982

  • AUSIMM
    Analysis of Post Detonation Fumes from Commercial Explosives in an Underground Operating Environment

    By Jones IO, Coles A, Austin D

    This research project came about as a result of ICI Australia offering a scholarship to a final-year mining engineering student at the Western Australian School of Mines. A signifi-cant part of this y

    Jan 1, 1984

  • AUSIMM
    Exploration Philosophy and Future Trends

    Projections of metal requirements for Japan and the United States indicate growing competit- ion for Australia's mineral output and a critical need for continuing discovery of new reserves. Th

    Jan 1, 1973

  • AUSIMM
    Intelligent Mine Technology Program and its Implementation

    By P SSrkkS

    Mining is commonly seen as a typical basic industry with rough and even dangerous working conditions, heavy environmental load, and a low level of high-technology and automation with much manual work

    Jan 1, 2000

  • AUSIMM
    Operation and Optimisation of the Argyle HMS Plant

    By Hutton W

    The Argyle Diamond Mine is the first significant diamond producer in Australia. The project has been developed with new concepts in circuit design, process control technology, organisational deve

    Jan 1, 1987

  • AUSIMM
    Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground Voids

    By M E. Pierce

    Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two

    Jan 1, 2003

  • AUSIMM
    Compositions, Log Ratios and Bias - From Grade Control to Resource Definition

    By C Ward, U Mueller

    Compositional geostatistics is an approach developed to ensure that the constant sum constraint induced by geochemical iron ore analysis is respected in estimation and simulation. Jack-knifing and cro

    Aug 12, 2013

  • AUSIMM
    Product Quality Control at Blackwater Coal Mine

    Utah Development Company operates a mine at Blackwater with a present annual production of 4 000 000 tonnes of coking coal. Mineable seams outcropping on the company's lease are part of the Pe

    Jan 1, 1974