Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Development of a Small Scale Test for Rapid Characterisation of Flotation Response (JKMSI)

    "The characterisation of resources and description of variability across different ore domains is key to accurate prediction of probable metallurgical performance. Such characterisation testwork often

    Jan 1, 2013

  • CIM
    Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project

    By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton

    "Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub

    Jan 1, 2013

  • CIM
    The Cobalt Mining District: Silver Sources, Transport and Deposition

    By Dan Marshall, David H. Watkinson

    Abstract - Cobalt, Ontario, is renowned for the 12.6 billion grams (445 million ounces) of silver produced from the area since discovery in 1903 by workers of the Timiskaming and Northern Ontario Rail

    Jan 1, 2000

  • CIM
    Optimization of Acid Addition in High Pressure Acid Leaching at Ambatovy

    By R. Holmwood, M. Faris, P. Holloway, M. Collins

    Sulphuric acid addition is a major driver of the economics in the processing of nickel laterite ores by high pressure acid leaching (HPAL). Understanding the optimal acid addition rate is essential fo

    Jan 1, 2017

  • CIM
    A MultiGaussian Approach to Assess Block Grade Uncertainty

    By Julián M. Ortiz

    Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a

    May 1, 2004

  • CIM
    SUPASIM: A Methodology to Predict Plant Performance from Laboratory Data

    By C. J. Martin, M. P. Hay

    "A methodology was developed in the mid-1980’s to predict plant performance from standard laboratory flotation tests. The technique is based on a simple, empirical kinetics model, and is tailored for

    Jan 1, 2004

  • CIM
    Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification

    By Hiroaki Sakurai

    Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p

    Oct 1, 2003

  • CIM
    Geometallurgical Mapping: A New Approach That Reduces Technical Risk

    By Jean M. Richardson, Steven R. Williams

    "Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi

    Jan 1, 2004

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles

    By L. Bloomquist

    This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t

    Jan 1, 2004

  • CIM
    The Cigar Lake project — Mining, ore handling and milling

    By 12670

    The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3

    Jan 1, 2004

  • CIM
    Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

    By C. O. Aksoy

    There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary

    Jan 1, 2005

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004

  • CIM
    New Technologies for Improved Processing of Base and Precious Metals Containing Ores

    By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio

    "Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.

    Jan 1, 2013

  • CIM
    Kinetics of bainite transformation in hot-worked and ultrafine austenite of alloy steels.

    By E. V. Konopleva, H. J. McQueen

    "The isothermal bainite transformation kinetics of low- and medium-carbon alloy steels after hot deformation and the rmocycling treatment (TC) has been studied by the magneto - metric method. Deformat

    Jan 1, 1997

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006

  • CIM
    The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek Mine

    By Sergio Cattalani, David J. Kerr, Harold L. Gibson

    Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13

    Jan 1, 2000