Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining WorkBy Nicolae Dobritoiu
The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand
Oct 1, 2009
-
The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver SolutionsBy Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols
"The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by
Jan 1, 2006
-
Mocca: A Grinding Circuit Control ApplicationBy C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher
"MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con
Jan 1, 1991
-
Developing Solutions to Complex Flotation ProblemsBy B. K. Gorain
"Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed
Jan 1, 2013
-
Reducing maintenance costs through predictive fault detectionBy Y. Faitakis
In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.
Jan 1, 2004
-
Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)By Y. Faitakis, G. J. Powley, C. Mackenzie
"In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis
Jan 1, 2004
-
Capturing unrealized capacityBy M. W. Lewis, B. Sambirsky, J. Werner
A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh
Jan 1, 2004
-
Mineral Process Plant Monitoring at Greens Creek: By Looking at the Minerals ThemselvesBy R. Haecker, S. Bajic, R. Thorpe, A. Palko, M. Kalstrom
"Historically, mineral processors have used inferential data like plant instrumentation, assays, and grind sizes to monitor the performance of their plants. The ability to monitor the minerals themsel
Jan 1, 2014
-
Processing of Refractory Sulphides at Mantos de Oro, ChileBy John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.
"Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow
Jan 1, 2009
-
Evaluation of Phospho-Gypsum for Gypsum Products ManufactureBy R. K. Collings
"This paper summarizes research that was done at the Mines Branch, Ottawa, to evaluate samples of phosphogypsum for gypsum products manufacture. The samples were from phosphate fertilizer facilities a
Jan 1, 1972
-
Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining SustainabilityBy Zetti Gavelán
Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty
May 1, 2010
-
Evaluation of the Tower Mill as Regrind MachineBy J. M. Menacho, J. M. Reyes
"Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te
Jan 1, 1989
-
Chemical Additives for Improving the Wet Grinding of OresBy R. Samuels, R. Klimpel
"IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou
Jan 1, 1979
-
Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer ProcessBy Yannis Faitakis, Simon Bergeron
"This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B
Jan 1, 2003
-
Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of CanadaBy Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie
"A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im
Jan 1, 2009
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004
-
Some Aspects of Industrial Safety in British ColumbiaBy W. K. A. Congreve
Introduction Less than a hundred years ago the engineer was able to do his job without concern for the science that underlay his practices or for the men who operated his machines. But toward the e
Jan 1, 1948
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery CurvesBy D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
An Expert System Supervisor of a Flotation CircuitBy A. L. Mular, R. P. Edwards
"The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits
Jan 1, 1991
-
Pilot-Scale Frother Testing at Highland Valley CopperBy S. D. D. Welsby
"A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over
Jan 1, 2014