Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines Limited

    By G. Halverson, K. Blower

    "Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per

    Jan 1, 1987

  • CIM
    Managing Plant Data with the Millex Information Management System

    By L. K. Walker, G. A. Kosick, P. D. Young

    "MillEX is an information management system designed by mineral processors for mineral processors. The system utilizes ""cutting edge"" software technology to gather and store all automatically and ma

    Jan 1, 1992

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Fundamental Study of Reactive Oily Bubbles in Sulphide Flotation

    By Carolyn Kenney, Jianjun Liu, Zhenghe Xu

    "The flotation of fine particles has been a challenge to scientists and engineers in mineral processing. A novel concept of reactive oily-bubbles as carrier to float fine particles is described in thi

    Jan 1, 2003

  • CIM
    Electrical Demand Reduction and Response Strategies for Underground Mining

    By Nicholas C. Williams

    This paper presents the development of a demand reduction and responsive strategy capable of reducing the electrical power demand, particularly during peak conditions. The work presented includes a ca

    Aug 1, 2013

  • CIM
    Production Simulation Overview and Case Study: Coleman 170 Orebody

    By Scott Hopkins

    Simulation tools are preferred for evaluating complex systems due to its ability to mimic reality and quickly evaluate many different what-if scenarios and find global solutions. A simulation model is

    May 1, 2008

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    The Systematic Reclamation of Gold Mine Tailings

    By Jean-Claude LeRoy, Herman Keller

    "INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part

    Jan 1, 1975

  • CIM
    Evaluation Of Elements Of Concern In The Jeb Tailings Management Facility Using Synchrotron Radiation Techniques

    By John R. Hayes, Kebbi A. Hughes, John Rowson, Peter E. R. Blanchard, Jeremiah C. Beam, Andrew P. Grosvenor, Arthur Situm

    Uranium ore bodies contain elements within mineral phases that need to be disposed of responsibly. Solid waste can be placed in a tailings management facility (TMF) to contain the waste elements and l

    Jan 1, 2020

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    General Discussion - Impurity Penalties in Smelter Contracts

    By G. C. McKerrow

    "Mr. G.C. McKerrow, Assistant Manager of Noranda Mines and formerly Smelter Superintendent attended the meeting to answer questions as to why smelters imposed penalties for too much zinc in a copper c

    Jan 1, 1971

  • CIM
    Thompson Mill MgO Rejection

    By Johnna Muinonen

    "The Thompson Mill processes ores from the Thompson and Birchtree Mines. While the Thompson ore has very little magnesium containing gangue, the Birchtree orebody consists of veins of massive sulphide

    Jan 1, 2006

  • CIM
    Improving mining and minerals plant performance: operations and maintenance working together using new information technology

    Operations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc

    Jan 1, 2009

  • CIM
    Lamella Thickener Performance in Potash Refining (eda27180-f1f6-4ab3-854e-c986b2a1249d)

    By Douglas M. Smith, G. A. Maki

    "The initial development of the massive potash deposits of the prairie evaporite formation took place over a decade ending in 1970. The potash mining and refining facility near Rocanvi11e, Saskatchewa

    Jan 1, 1983

  • CIM
    ILTEC Technology – New Pathways towards Safe and Effective Cooling

    By T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert

    It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te

    Jan 1, 2019

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)

    By P. Toscano, T. A. Utigard

    "The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con

    Jan 1, 2004

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    The Quintette coal project (96ee627b-a342-4ea7-a0e8-7394b1a8b815)

    By D. C. Rance

    "The Quintette Coal Limited property is located in the north east coal area of British Columbia. A basic agreement with the Japanese steel industry was ex ecuted on January 27, 1981 for the sale of 69

    Jan 1, 1985