Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Designing of the Grinding and Classification Systems for Increasing the Concentrate Iron Grade in 4th Production Plant at Golgohar Mining and Industrial Company

    By Jamal Jafari, Abbas Sam

    "The concentration of the fourth production line at Golgohar includes 66% iron with Blaine number of 500 cm2/g. For pelletizing process, the feed iron grade should be greater than 68% with minimum Bla

    Jan 1, 2016

  • CIM
    Evaluation of Fracture Resistance of High Strength 7075 and 7050 Aluminum Alloys

    By K. Purazrang, P. Sh. Naseri, P. Abachi

    In present work, the comparative measurement of aluminum alloys' resistance to the unstable fracture was provided. Besides, the rupture mechanisms of high strength 7075 and 7050 aluminum alloys w

    Jan 1, 2006

  • CIM
    Prognoses for Alberta thermal and metallurgical coal

    "Projections of demand for Alberta coal indicate a quadrupling of current production rates to some 70 million tonnes/year by the end of the century. About half of this output-comprised of subbituminou

    Jan 1, 1982

  • CIM
    Copper Refining Electrolysis at High Current Densities with Conventional Technology

    By A. C. Atenas

    The majority of refineries that operate with traditional starting sheet technology ?starting sheet- uses a relatively low current density of 250 A/m2. Industrial tests at high current density with con

    Jan 1, 2007

  • CIM
    Testing and Application of Iron Precipitationas Goethite (FeOOH) using a Strong Airflow

    By Mei-Yan Yang, Ltd. Yunnan Yuntong Zinc Co., Yong-Xiang Li, Xing-Zheng Dai, Hong-Liang Wang, Meng-Yang Huang, Peng Zeng, Guo-Feng Li

    "The removal of iron asgoethite from the high iron bearing solutions generated in zinc hydrometallurgy using a strong airflow device was investigated. The influence of oxygen flow, copper ion concentr

    Jan 1, 2016

  • CIM
    Pilot-plant treatment of a Quebec talc ore

    By P. R. A. Andrews

    "Talc ore from Bakertalc, High water, Quebec analyzing about 60% talc, previously dry ground to about 95% minus 53 µm was beneficiated in an 11.4 kg/ h pilot-plant flotation circuit. A concentrate of

    Jan 1, 1989

  • CIM
    Petroleum and Natural Gas

    By Unkown

    The Province-wide road ban on movement of heavy loads has had the effect of curtailing or stopping development in several areas. In the Leduc area, the discovery well has been restricted in flow to on

    Jan 1, 1947

  • CIM
    Inco roast-reduction smelting of nickel concentrate

    By C. Díaz, A. D. Dalvi, C. E. O'Neill

    "Roast-reduction smelting (RRS) of nickel concentrate, combined with flash smelting of copper concentrate, was one of the process options that Inco considered as a means of meeting its 1994 sulphur di

    Jan 1, 1994

  • CIM
    Numerical Analysis of Hard Rock Pillars using the Cohesion Weakening Friction Strengthening Model

    By H. Rafiei Renani, C. D. Martin

    "The Cohesion Weakening Friction Strengthening (CWFS) is adopted in numerical analysis to capture the observed progressive failure of hard rock pillars. As a case study, pillars at the Elliot Lake min

    Jan 1, 2015

  • CIM
    Inco's SO2 - Air Cyanide Removal Process

    By R. Vergunst, E. A. Devuyst, G. Robbins

    "INTRODUCTIONThe Inca process for continuous cyanide removal from industrial wastewaters was patented in 1984 by G.J. Borbely, et.al. (1). The process requires SO2, air, lime and a copper catalyst. Bo

    Jan 1, 1989

  • CIM
    Effects of dolomite addition on durability of coating materials for BOF

    By S. -H. Sohn, M. -K. Cho, G. -G. Hong

    In order to evaluate the properties of coating materials for BOF, the effects of dolomites (dolomite and light burned dolomite) addition on durability of coating materials were investigated. In all co

    Jan 1, 2004

  • CIM
    Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case Study

    By M. Yao, D. Thibodeau

    "Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t

    Jan 1, 2015

  • CIM
    Highlights of Bill 129: an act to revise the Ontario Mining Act (from a commentary of Osler, Hoskin & Harcourt)

    By Scott L. Ewart, William M. Bryden, Donald E. Wakefield

    "Osler, Hoskin & Harcourt develops commentaries from time to time on topics of legal interest. These may deal with new legislation, changes or developments in government policy or recent judicial deci

    Jan 1, 1984

  • CIM
    An Analytical Model for the Evaluation of Primary Shear Zone Thickness in Orthogonal Cutting

    By N. Tounsi

    The use of analytical modeling of continuous chip formation in conjunction with orthogonal cutting experiments was presented in the open literature to identify the coefficients of material constitutiv

    Jan 1, 2006

  • CIM
    Barrick Gold Corporation - Lagunas Norte & Veladero Projects

    By S. Haggarty, R. Walton

    Barrick's growth and development plan will add three major new mines during 2005 including the Lagunas Norte Project in the La Libertad Province of Peru, the Veladero Project in the San Juan prov

    Jan 1, 2005

  • CIM
    Carbon-Slag Reaction Kinetics - Saturation Injection Rate and Available Reaction Surface Area

    By F. -Z. Ji, G. A. Irons, M. Barati, K. Coley

    The use of oxygen in electric arc furnace steelmaking is tied to the use of fossil fuels, and slag foaming. The current work examines the kinetics of carbon injection into EAF slags especially the sat

    Jan 1, 2004

  • CIM
    An overview of industrial minerals in Manitoba

    By W. R. Gunter

    "INTRODUCTIONThis article documents the current non-metallic mineral s resources of Manitoba (Fig. I), and makes comparisons with currently producing deposits in North America and elsewhere in the wor

    Jan 1, 1989

  • CIM
    Case Study – Blind Shaft Sinking for BHP Jansen Project

    By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn

    "The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with

    Jan 1, 2019

  • CIM
    Successfully Adapting To Continuing Challenges at the Moa Joint Venture

    By S. McPherson, M. Chalkley, R. Ellenwood, W. Nicot

    "The Moa JV was formed in December 1994 as a 50/50 joint venture between Sherritt Inc. and General Nickel Company S.A. of Cuba. The joint venture consists of the mine and Pedro Sotto Alba processing p

    Jan 1, 2017

  • CIM
    Increase of efficiency and decrease of power consumption in SO3 recycling from the off-gas of pyrometallurgical processes

    By Y. G. Yaroshenko, V. Y. Baldin, Y. M. Gordon

    The manufacture of sulphuric acid from the off-gas of pyrometallurgical processes in the production of heavy metals is one of the common methods of effective recycling of sulfuric anhydrite. The new I

    Jan 1, 2004