Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Deep-well dewatering at Gibraltar Mines

    By T. L. Carpenter

    "The presence of excessive water in the Gibraltar East Stage 1 pit initiated studies into the ground-water conditions that might be expected in mining the Granite Lake and Pollyanna pits. Hydrologic i

    Jan 1, 1980

  • CIM
    Operational Strategy At Chagres Smelter, Maximizing Installed Capacity

    By R. Bonifaz

    The Chagres Smelter, part of the Anglo American plc group situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its opera

    Jan 1, 2007

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • CIM
    Cost Control at Lamaque

    By W. Zieman

    "The low consumption of reagents can probably be attributed to a good clean type of ore. The cyanide level is kept at 0. 8 lb/ ton of solution and the lime at 1. 8 to 1.9 lb per ton of solution (pH 12

    Jan 1, 1964

  • CIM
    Evaluation of Copper Losses Using Flow Patterns in the Cl-Furnace of the Mitsubishi Process

    By H. Sakurai, M. Kato, F. Tanaka

    The Mitsubishi Continuous Copper Smelting/Converting Process employs an electric furnace (CL- furnace) for settling the slag/matte mixture formed in the smelting furnace. The conditions in the CL- fur

    Jan 1, 2019

  • CIM
    Towards zero waste

    By D. S. Conochie

    The world is poised for rapid growth in consumption as large, less developed economies acquire greater wealth. It might be expected that there would be a corresponding growth in waste generation, but

    Jan 1, 2004

  • CIM
    Arsenic in Pyrometallurgical Operations

    By J. N. Cram

    "The comments given are to help allay generally accepted ideas that the handling of arsenic as arsenic-trioxide (As2o3J in and from off gas pyrometallurgical operation fumes is difficult, hazardous an

    Jan 1, 1979

  • CIM
    Structure at Depth on the Plains of Alberta

    By Ralph L. Rutherford

    Introduction During the past twenty-five years we have seen considerable exploration for oil on the plains of southern and east-central Alberta. This exploration has to some extent gone on in cycle

    Jan 1, 1946

  • CIM
    Using The Six Sigma Approach Towards A Metallurgical Project: Nickel Loss Reduction And General Improvements To The Raglan Rougher Flotation Circuit

    By C. Ciriello

    Six Sigma methodology, as applied within Xstrata (formerly Falconbridge and Noranda), involves a disciplined approach to managing projects, solving problems, improving performance, and leveraging info

    Jan 1, 2007

  • CIM
    LIFAC - economical solution to SO2 control

    By D. W. Smith, J. J. Koskinen, T. A. Enwald, M. E. Ball

    "A full-scale demonstration unit of Tampella's LIFAC desulphurization process was tested at SaskPower's Poplar River Power Station Unit No. I. The test program included a series of parametri

    Jan 1, 1993

  • CIM
    Carbon Handling Improvements at American Barrick Resources Corporation's Holt-McDermott Mill

    By Lloyd Buckingham

    "The operating cost of a gold mine employing granular activated carbon to recover gold can be greatly affected by the condition of in-circuit carbon and its attrition losses. To accurately identify an

    Jan 1, 1994

  • CIM
    Don’t Give Up on the Greenfield Projects: The First 20 Years of Nickel Extraction from Cuban Laterites

    By Larry M. Southwick

    There have recently been executives at major metals companies who have recommended that Greenfield Projects not be pursued. Greenfield includes not only new geographical locations, but also new techno

    Jan 1, 2014

  • CIM
    Development and Utilization of Open Information Transfer Formats in Infrastructure Sector

    By R. Heikkilä

    Fluent information exchange between different work phases, software and systems used in infra construction is a key for successful execution of infra construction projects. Open and publicly available

    Aug 1, 2013

  • CIM
    Keynote Address - Oil and Gas

    By W. L. Single

    "LET ME FIRST OF ALL thank you for sending this invitation to me to participate in this Annual Meeting of The Mining Society of Nova Scotia. As an engineer, although I don't get an opportunity to prac

    Jan 1, 1973

  • CIM
    The Davy McKee combined mixer-settler: a novel approach to solvent extraction

    By G. A. Gillett, C. F. Bonney

    "The Davy McKee combined mixer-settler (CMS), is a liquid-liquid contactor, which has been commercially applied to the recovery of uranium from dilute sulphuric acid-bearing leach liquors. CMS differs

    Jan 1, 1983

  • CIM
    Using Simul8 to model underground hard rock mining operations

    By N. Vayenas, G. Yuriy

    "The combination of a predictive reliability assessment model and discrete-event simulation can be an effective methodology to study the impact of equipment failures on the capacity of production syst

    Jan 1, 2005

  • CIM
    Gadgets Hydraulic Flow Switch

    THIS article describes the origin and details of a hydraulically operated switch to control the operation of an automatic underground pumping system. This system was installed in December, 1939, on th

    Jan 1, 1945

  • CIM
    Heap Leaching of Copper Ores – State of the Science

    Heap leaching accounts for around 20% of the global production of copper. In heap leaching coarsely crushed ore particles are contacted with an aqueous lixiviant percolating through large packed beds

    Jan 1, 2019

  • CIM
    Defining the Mineral Zones of Northern British Columbia

    By Forrest A. Kerr

    Introduction During recent years the work of the Geological Survey in northwestern British Columbia has been in the nature of reconnaissance and exploratory mapping, largely for the purpose of gainin

    Jan 1, 1931

  • CIM
    Geology and exploration, McDame asbestos deposit, Cassiar, B.C.

    By A. A. Burgoyne

    "The McDame chrysotile asbestos deposit located near Cassiar in northern British Columbia isfound at depth and on trend to the southeast of the currently mined open-pit Cassiar asbestos deposit. The u

    Jan 1, 1986