Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Calculating Shock Wave Over pressure from High-Speed Video

    By Catherine Johnson, Kelly Williams

    The ability to measure the overpressure of a shock wave is necessary for explosives research such as shockwave focusing and field testing of blast-resistant designs for buildings and vehicles. To reco

  • ISEE
    Bulk Explosives Test Work at Duvha Opencast

    By T Davids, O J. Jordaan, M D. J Bonneau

    As in most other parts of the world, the surface coal mining industry in South Africa is introducing emulsion explosives as the primary bulk blasting agent for use in wet borehole conditions where AN/

    Jan 1, 1987

  • ISEE
    Blasthole Length, Subdrilling and Stemming Analysis in an Iron Mine

    By Sarah Guzzelli, Enrigue Munaretti, Anneliese Botelho, Jair Koppe

    Drill and Blast (D & B) is one of the main operations in the mining production cycle, which aims to fragment rock according to a pre-defined plan for proper loading, haulage and processing specificati

    Jan 1, 2014

  • ISEE
    Blasting Optimization Using Autonomous Fragmentation Monitoring System

    By B. Corrêa, M. Cavalcante

    A large open pit iron ore mine in Brazil, which has a heterogeneous lithology, faces a challenge in defining drill and blast patterns to achieve the expected results. The mine needed to obtain an aut

    Jan 1, 2024

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    High Speed Photography of Stope Blasting in South African Gold Mines

    By P A. Gibson, J R. Brinkmann

    The South African gold mining industry fires approximately 800 000 sloping blastholes daily. A programme aimed at characterizing the stope blasting process is underway in order to identify areas for i

    Jan 1, 1985

  • ISEE
    Highwall Safety

    By John C. Didlinger, John L. Didlinger

    As we begin the pre-blast survey we need to decide on the number of holes needed for production and a detailed highwall inspection. The survey consists of checking the highwall and placement of barrie

    Jan 1, 1996

  • ISEE
    High Profile Project in Historic Affluent Nashville Neighborhood Poses Challenges

    By Brent Coleman, Wade Hutchison

    The Montgomery Bell Academy project is a parking garage structure topped by a soccer field. This project included expanding parking and moving the present tennis courts. The project is located adjacen

    Jan 1, 2012

  • ISEE
    E7B Sector Drilling and Blasting Challenges and Learnings

    By Robert Jacob Cefalo, Rio Tinto Kennecott

    At the end of 2016, the Mine started a new ore phase in the section of the pit located on the East Wall. The East Wall geological structures required controlled blasting for peak particle velocity (PP

    Jan 1, 2019

  • ISEE
    Shockwave Consolidation to Densify Powders into a Bulk Material

    By David Nemir, Jan Beck

    A challenge in materials science is the production of a bulk solid material from a powder precursor. One solution is to use shockwave consolidation whereby a ductile tube is loaded with the powder of

    Jan 1, 2016

  • ISEE
    Blasting Permanently Frozen Asbestos Ore in Northern Canada

    Almost one half of Canada's total land surface is underlain by permafrost. This term describes the thermal condition of earth materials when their temperature remains below 0°C continuously for a numb

    Jan 1, 1975

  • ISEE
    Controlled Perimeter Blasting in Cold Regions

    By Malcolm Mellor

    Practical procedures that have been developed for pre-split blasting and smooth blasting in common rocks are reviewed systematically. Topics covered include shothole spacing, charge weight per unit le

    Jan 1, 1976

  • ISEE
    A Case Study Examination of Two Blast Rounds at a Nevada Gold Mine

    By Joel Warneke, Cristian Caceres, Ed Mchugh

    NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i

    Jan 1, 2008

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Vibration and Flyrock Control Through Better Predictions

    By Daodu Opeyemi

    This paper describes several damages of blasting operations on some case studies, analyzes causative factors, and emphasizes preventive measures. Due to several complaints from some host mining commun

    Jan 1, 2009

  • ISEE
    A Reanalysis of Fragmentation Data from the Red Dog Mine

    By Finn Ouchterlony

    "Recently detailed fragmentation data from blasts fired with electronic delay detonators (EDDs) in the Red Dog mine in Alaska were presented. They include a comparison with pyrotechnic detonators ford

    Jan 1, 2012

  • ISEE
    Small Scale Model Testing in Investigations of Energetic Material -- Dynamic Effects Laboratory

    By L C. Taylor

    Very small scale testing has been shown to be able to predict quite accurately, in many situations, the results of full scale testing. Small scale tests are more cost efficient, easily observed, and e

    Jan 1, 2012

  • ISEE
    Blasthole Pressure: What it Really Means And How We Should Use it

    By Claude Cunningham

    Blasthole pressure is the starting point for many blast design calculations, but the way in which it is usually derived, from measured detonation velocity, indicates that more thought is needed as to

    Jan 1, 2006

  • ISEE
    Computer Aided Design of Ring Blasts

    By Calvin Konya, Theodore R. Myers, Robert Lundquist

    The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig

    Jan 1, 1990

  • ISEE
    Trends in Drilling and Blasting (8aa24a46-8326-4148-8007-63f421ba2d8b)

    By Alan Bauer

    During the past several years, the trend to large-diameter blastholes in both open pits and underground mines along with the continuing developments in slurried explosives and delay systems has kept t

    Jan 1, 1978