  • SAIMM
    Corrigendum: February Issue

    Fig. 4 and 5 of the paper 'The analysis of ventilation and cooling requirements for mines' by J. van der WaIt, E. M. de Kock, and L. K. Smith are positioned incorrectly in the February issue

    Jan 1, 1983

  • SAIMM
    No. 5 Seam Mining At Kriel Colliery Opencast - Synopsis

    By M. D. Raganya

    The Kriel Colliery is an Anglo Coal mine which is contracted with Eskom to produce No. 4 seam for Kriel power station. The mine previously found it uneconomical to mine No. 5 seam due to the low quali

    Jan 1, 2011

  • SAIMM
    Nationalization And Mining: Lessons From Zambia

    By D. Limpitlaw

    Industrial mining in Zambia started in the 1930s when the world class copper deposits near the border with Katanga were developed. The discovery of these deposits began at the turn of the century when

    Jan 1, 2011

  • SAIMM
    Monitoring of air recovery for froth flotation optimisation on an industrial circuit, D.N.C. Phillpotts, B. Whitehead, and S. Ramatsoma

    By S. Ramatsoma, D. N. C. Phillpotts, B. Whitehead

    Changes in flotation performance have been correlated to changes in froth structure, velocity and stability. Literature has shown that when the aeration rate is varied for a specific float cell, the r

    Jan 1, 2020

  • SAIMM
    Improvements in stope drilling and blasting for deep gold mines

    By N. G. Cook, N. C. Joughin, A. J. A. White

    The rate of face advance in the gold mines is between 3 and 10 m a month, with a median value of about 5 m a month; it follows that faces are blasted less frequently than is planned. There are many ad

    Jan 1, 1975

  • SAIMM
    Quality of PGE Fire Assays Using Spark Analysis on Lead Buttons

    By P. K. Hofmeyr

    Traditional fire assay dates back over 3000 years and has changed very little over that time. The only improvement is to replace the gravimetric finish with dissolution of the Precious Metal bead foll

    Jan 1, 2014

  • SAIMM
    Considering the action of degrading water quality on the electrochemical response of sulphide minerals, N. Ndamase, M. Tadie, and K.C. Corin

    By K. C. Corin, M. Tadie, N. Ndamase

    Fresh water conservation efforts and strict environmental regulations have forced the mining industry to reduce freshwater consumption and effluent discharge. This is achieved by recycling process wat

    Jan 1, 2020

  • SAIMM
    Preconcentration Of UG2 Platinum Ore: Economic Benefits To Mine, Plant, And Smelter

    By F. Smit

    Mining and plant disciplines can benefit from pre-concentration of UG2 platinum ores in a dense medium separation (DMS) plant. The main benefit of DMS is the selective discard of waste from the feed s

    Jan 1, 2012

  • SAIMM
    Automation trends in room-and-pillar continuous-mining systems in the U.S.A.

    By H. E. Parkinson, Y. P. Chugh

    About 90 percent of the coal mined underground in the U.S.A. today is mined by the room-and-pillar system. The productivity of the system dropped from about 14,1t per man-day in 1969 to about 7,3 t pe

    Jan 1, 1981

  • SAIMM
    Catalytic oxidation and removal of arsenite by zerovalent iron (Fe0) – magnetite (Fe3O4) composite with peroxymonosulfate (PMS), Y.O. Zubair, S. Fuchida, and C. Tokoro

    By S. Fuchida, Y. O. Zubair, C. Tokoro

    Mining of As-bearing minerals had resulted in the release of arsenic species predominantly As(III), which is known to be more toxic, and undue exposure to it is detrimental to human organ systems. Man

    Jan 1, 2020

  • SAIMM
    Process mineralogical characterization of the Swartberg polymetallic sulfide ore, South Africa, H.J.J. Gordon, G. Stroebel, J.A. Miller, K.C. Corin, A.E. Landsberg, and M. Becker

    By A. E. Landsberg, K. C. Corin, G. Stroebel, J. A. Miller, M. Becker, H. J. J. Gordon

    Geometallurgy represents an integrated approach to mine planning and operation whereby the naturally occurring ore variability and its effects on all key downstream activities in the mine life cycle a

    Jan 1, 2020

  • SAIMM
    Risk Analysis And Decision-Making - A Case Study (f49695cb-00e4-4ae7-a065-8708230f1eaf)

    By B. Gamble

    Solid Energy's project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each leve

    Jan 1, 2007

  • SAIMM
    The Mutoshi Project — Part I: Metallurgical Test Work, Process Design, and Project Delivery

    By N. Tatalias, P. Ilunga, M. Lampi, J. Edwards, K. Valkama, M. Nicolle, D. Samal

    "Developing a greenfield mining project is a complex exercise: doing so in an increasingly volatile, uncertain, and ambiguous global economy adds significantly to this complexity. In the context of an

    Nov 1, 2018

  • SAIMM
    Some Rock Engineering Aspects of Multi-Reef Pillar Extraction on the Ventersdorp Contact Reef

    By D. F. Malan, J. C. Esterhuyse

    "Mining in the Carletonville area of the Witwatersrand Basin predates 1934. Owing to the depletion of higher grade ore, the current activities focus increasingly on the extraction of lower grade secon

    Dec 1, 2018

  • SAIMM
    Determination of Copper in Organic Media from Solvent Extraction Mining Systems Via Portable Energy-Dispersive X-Ray Fluorescence Analysis

    By Z. Ruetz

    Portable X-ray fluorescence (pXRF) analysis has been widely adopted in the geochemical and environmental field as a cost-saving alternative to standard analyses. This paper outlines the efficacy of a

    Jan 1, 2023

  • SAIMM
    The influence of stemming practice on ground vibration and air blast

    By M. Mpofu, B. Maphalala, S. Khan, S. Ngobese, D. Roberts

    This paper details an assessment of stemming practices at a South African opencast coal mine and their influence on ground vibration and air blast. Quantitative and qualitative analysis methods were u

    Jan 1, 2021

  • SAIMM
    A Modification of the Zeta Potential of Copper Sulphide by the Application of a Magnetic Field in Order to Improve Particle Settling

    By S. Gqebe, A. Lewis, M. Rodriguez-Pascual

    "Gravitational sedimentation of suspensions in various precipitation processes is hindered by colloidal stability. This is due to the high surface charge of the suspension and results in strong attrac

    Jan 1, 2016

  • SAIMM
    Comparison of continuous and discontinuous modelling for computational rock mechanics

    By T. Scheldt, M. Lu, A. Myrvang

    Abstract: In this paper both continuous and discontinuous modelling are utilised in order to analyze the stability of the Gjøvik Olympic Mountain Hall. The large span cavern (62 m) was built for the 1

    Jan 1, 2003

  • SAIMM
    The Effect Of Backfill On The Transmission Of Seismic Energy

    By S. M. Spottiswoode

    Rock mechanics benefits of stope support in deep-level mining originate principally from the ability of the support to resist relative movements between the hangingwall and the footwall. While the rol

    Jan 1, 1988

  • SAIMM
    Petroscopic observations of rock fracturing ahead of stope faces in deep-level gold mines

    By A. J. Jager, G. R. Adams

    The pattern of mining-induced fractures ahead of stope faces in deep-level gold mines, as revealed by petroscopic observations, is described. It is shown that there are zones of fractured and unfractu

    Jan 1, 1980